MOdel-based GENeration of Tests for Embedded Systems #216679 FP7-ICT-2007-1-3.3 Embedded Systems Design WP1 Requirements and State of the Art Requirements.

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

Partners Innovation Fund Approaching Investors September 22, 2010.
GJH August 2007 This is NOT about technology! This IS about learning.
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
BEING AN ETHICAL INSTRUCTIONAL LEADER SHIRLEY JOHNSON & KEISHA D. SMITH BASED ON THE WORKSHOP FROM AEA 2012 PROFESSIONAL DEVELOPMENT CONFERENCE.
Process and mechanics of HFA progress monitoring and Review Sujit Mohanty, UNISDR The Hyogo Framework for Action Progress Review and Reporting.
Sujit Mohanty, UNISDR The on-line HFA Monitor Walkthrough The Hyogo Framework for Action Progress Review and Reporting Framework for the Arab States Region.
Barents 2010 Commercial and industrial cooperation Industrial Development Barents Indev Barents.
North Carolina Positive Behavior Intervention & Support State Recognition Exemplar School Application PowerPoint Presentation.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
European e-Competence Framework Company Network Seminar EMCC - Cedefop, 9th November 2006 Jutta Breyer, Germany, Kibnet / AITTS European e-Competence Framework.
UK 2010 Biodiversity Indicators EIONET Copenhagen 30 October 2007 James Williams Joint Nature Conservation Committee Monkstone House, City Road, Peterborough,
Added value and efficiency through the use of article 37.6(b) and EGTC Rossella Rusca Brussels, 11 October 2011.
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
Course in software testing - from bachelor to master, from Skopje to Novi Sad (and beyond) Anastas Mishev Katerina Zdravkova Sashko Ristov Hristina Mihajloska.
MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design Technical Coordination and Steering Committee Meeting.
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design Slide 1 FMCO, Graz, Nov. 30 th 2010 Test Cases.
MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design WP3: Qualitative Fault Modelling András Pataricza,
ON DEMAND Introduction. Learning targets  I can identify the modes of writing and distinguish the differences among all 3 modes  I can compare and contrast.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design Institute for Software Technology – Graz University.
Requirements Validation
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design WP3 Modelling & Testing Theory Modelling Examples.
Working with the Teachers’ Standards in the context of ITE. Some key issues for ITE Partnerships to explore.
Executive at …. Staffordshire University April Training Executive Ltd. April House, Tarvin Road, Frodsham Cheshire WA6 6XN Level 3 Undergraduate.
Advanced Cost Management Professor William F. O’Brien, MBA, CPA Fall 2007.
Advanced Cost Management Professor William F. O’Brien, MBA, CPA Spring 2010.
Using G.I.S. to Bridge the Gap Between Regional and Local Industrial Analyses Towards a cooperative framework within local communities in northeast Ohio.
The Business Plan : Creating and Starting The Venture.
The Dissertation/Research Proposal Guidelines are adapted from Yildirim’s “Student Handbook for Ph.D. Program”.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Developing transferable skills and enhancing employability through liaison interpreting F. Chouc French Teaching Fellow
18 th Annual Canadian IT Law Association Conference Insider View from the EU Expert Group on Cloud Computing Dr Sam De Silva Partner, Head of IT & Outsourcing.
This presentation, including any supporting materials, is owned by Gartner, Inc. and/or its affiliates and is for the sole use of the intended Gartner.
The on-line HFA Monitor and national level process 2 nd ISDR Asia Pacific Partnership Meeting August, 2010 Incheon, Republic of Korea.
CIO Choice 2014 Voice of Customer Anoop Mathur & Shantanu Phansalkar By
+ Developing Print Advertisements Introduction to Business & Marketing.
Principles, Practices and Dynamics of Research Management LECTURE-4 Research Design Kazi Nurmohammad Hossainul Haque Senior Lecturer, Civil Service College.
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
CE 726 STRATEGIC MANAGEMENT OF CONSTRUCTION COMPANIES INTRODUCTION 10 TH FEBRUARY, 2006 BY Assoc. Prof. Dr.Irem Dikmen Toker.
1 The Second Addition of LTMS (Theoretical Sneak Peak for the VG) VG SP: May 2010.
Deals to benefit Canada: Strategy and approaches to making the “Right” deal for Canada Panel at the FPTT 2008 National Meeting Eileen Raymond June 2 nd,
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Development Day Tuesday 4 th January Time:Content:Room:Delivered by: 8:30amCoffeeThe Toast 9:00am ILPs, PDPs and Tutorial – Target Setting Debbie,
Research Uma Kanjilal. Functional Roles of Marketing Research DescriptiveStatements of fact DiagnosticExplanation of data PredictiveUsing data for forecasting.
The Business Relationship Management Toolkit - Relationship management essential part of your IT- Business Alignment Strategy Toolkit 1 The Secret Is Out!
Financing Natura 2000 WORKSHOPS 2nd meeting of the Steering Group, 2 March 2006.
SwA Co-Chair and Task Lead Strategy Session Agenda Technology, Tools and Product Evaluation Working Group Status Briefing Co-Chair(s) Michael Kass (NIST),
State of play and outlook for future work Development of Agri-environmental Indicators Unit AGRI-F1 - “Environment, GMO and genetic resources”
Division of Technology, Industry, and Economics Economics and Trade Branch Integrated Assessment of Trade- Related Policies and Biological Diversity in.
Implementation recommendations 1st COPRAS review Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels Bart Brusse.
Draft Report Overview: March 20, 2003 Prepared for: Planning Team Meeting Western Regional Air Partnership Presented by: Doug Jeavons — BBC Research &
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Lil Vayhinger.
Lesson Planning in the Elementary Classroom By: Sara Peck.
Case: Taking an Existing Intelligence Operation to the Next Level Jens Thieme Head of Market and Competitive Intelligence.
Cover slide Project, course, team, date. Outline welcome  1 slide introducing the key sections/ information items in this presentation.
DEVELOPING A BUSINESS PLAN FOR YOUR CLUB.
ODU Faculty Development March 18, 2011
Requirements Validation – II
Hazard Mitigation Planning VII
Expert Group on the Birds and Habitats Directives (NADEG)
PPM tools to answer business needs including forecasting
The ITS Action Plan October 2016.
Homework #3 The following problems are out of the textbook “Industrial Ecology” 1. Problem Problem Problem 9.3 Hint: A simple and reasonable.
Your Company Name & Your Names Here
2019 MARCH GEORGIA WORLD CONGRESS CENTER.
Cascading Strategic Objectives – Hoshin Planning Template
Meeting of the Strategic Development Group
Presentation transcript:

MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design WP1 Requirements and State of the Art Requirements Update Wolfgang Herzner, AIT

MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design Slide 2 MOGENTES Review, Vienna, 11 March 2010 [WP1 – Requirements Update] WP1 Requirements and State of the Art – Objectives  General  Identification of requirements of the industrial demonstrators to be covered during testing, including demonstrator background → D1.1a / Month 6  State of the art survey MBTCG (Model-Based Test-Case Generation) Tool integration framework Partner know-how about modelling, framework development, testing and TCG techniques →D1.2 / Month 6  2 nd Reporting Period  Update of D1.1 to consider issues identified during its use and interpretation

MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design Slide 3 MOGENTES Review, Vienna, 11 March 2010 [WP1 – Requirements Update] WP1 Requirements and State of the Art – Progress  D1.1b completed at M18  5 parts (as D1.1a) – Introduction and 1 part per demonstrator partner (TRSS, Prolan, FFA, Re:Lab)  with special focus on Clarification: to reduce ambiguities and unclear statements Requirements identification: unique identifier for traceability Testability: phrasing requirements such that they can be tested Completeness: including all requirements which should be tested Demonstrator outline: all relevant information about the targeted demonstrators, including background hints for TCG and test application.

MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design Slide 4 MOGENTES Review, Vienna, 11 March 2010 [WP1 – Requirements Update] WP1 Requirements and State of the Art – Deviations FFA-demonstrator(s)  In addition to SAC (Steering-Anti Catchup), a further demonstration application has been added: CAS (Car Alarm System)  Reason: The technology SAC was based upon a future project that now plays a minor part in the current company strategy, while CAS is in the actual vehicle serial production.  Consequences:  FFA-part of D1.1b has been updated after M18  somewhat more demonstration effort (mostly by FFA)  with CAS a basic, fairly simple demonstrator model is available, which is used for first tests  no overall delay of project work

MOdel-based GENeration of Tests for Embedded Systems # FP7-ICT Embedded Systems Design Slide 5 MOGENTES Review, Vienna, 11 March 2010 [WP1 – Requirements Update] WP1 Requirements and State of the Art – Planning  WP1 terminated with M18 → no further planning