Network Code on Operational Planning & Scheduling DSO Associations views on the final version of 27 February 2013 Jorge Tello Guijarro, Member of DSO Technical.

Slides:



Advertisements
Similar presentations
1 Information and Publicity in programming period.
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Electricity Balancing Framework Guidelines
1 European Union Regional Policy – Employment, Social Affairs and Inclusion Draft guidance on monitoring and evaluation : Concepts and recommendations.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Software change management
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Network Code on Operational Security DSO Associations views on the final version of 27 February 2013 David Trebolle, Chair of DSO TF System Operation Codes.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Jan Müller Bundesnetzagentur ERI Central.
Draft Framework Guidelines on SYSTEM OPERATION
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
ENTSO-E Metadata Repository Introduction
EBADGE EU wide inteligent balancing market Peter Nemček.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Water.europa.eu Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Draft model for the Annual and Final implementation report under the Investment for Growth and Jobs goal Marko Prijatelj Directorate General for Regional.
Andrea Ricci - ISIS Brussels, 12 April 2012 Smart Grids: Overview of the study and main challenges 1.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
ENTSO-E Network Codes Development Plan GCRP/JGCRP Belfast 20 th February 2013.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Energy Agency of the Republic of Serbia
Challenges for the electricity sector from a TSO perspective Zbyněk Boldiš Member of the Board ČEPS, a.s. ASD Annual Convention – Knowledge Café 24 April.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Comments on Guidelines on Transmission Tariffs General ETSO welcomes the new draft as positive step –There are many important improvements to the previous.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
T&SC Modification Proposal: Clarification of Outturn Availability
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Smart Grid Schneider Electric Javier Orellana
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
European Developments Transmission Workgroup 3 rd May 2012.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Agenda TSOG 8th November
Transposition of European Network Codes
Implementation of Connection Network Codes The French process
KORRR INFORMAL STAKEHOLDER WORKSHOP
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Topic Operational Information Exchange
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Update on European Network Codes
Implementation of Connection Network Codes The French process
Dan Tofan | Expert in NIS 21st Art. 13a WG| LISBON |
Synchronous Area Framework Agreement for RG CE
Critical aspects in the current CSAM-proposal of ENTSO-E
Implementation Network Codes: status update
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

Network Code on Operational Planning & Scheduling DSO Associations views on the final version of 27 February 2013 Jorge Tello Guijarro, Member of DSO Technical Expert Group ACER Workshop Ljubljana, 26th April 2013

Positive points Recovery of efficient costs maintained for DSOs TSO - DSO coordination on outages for relevant elements located in Distribution Networks (art. 29)

In our opinion, ACER Framework Guidelines are not respected with respect to defining ‘ a harmonized standard for timing and content of information” (p.16) and information exchange related to the grid model (p.19): 1.DSO access to TSO Grid Model for the DSO Observability Area (part of transmission grid that influences distribution grid), including outages information 2.Schedules of distribution network users not communicated by Scheduling Agent to DSO But the key concerns raised in our letter to ENTSO-E (dated 01/03/12) prevail

Most RES to achieve 20% target by 2020 will be connected to DSO networks Example #1: E.ON Bayern Already today, distributed generation output often exceeds demand at distribution level, and sometimes is even several times higher. In addition, voltage problems are becoming more frequent. Example #2: Galicia, Spain

The negative impacts of by-passing the DSOs as SYSTEM OPERATORS DSOs primary mission = operating their networks at high levels of realibility and quality of service ‘Significant DSOs’ need relevant operational tools to contribute to the overall system security & efficient RES integration: Information exchange (→ reciprocity) BUT DSOs ‘Observability Area’ and information exchange missing Ancillary services

One-size-fits-all approach towards DSOs is inefficient Source: EURELECTRIC Note that European DSOs differ widely with respect to the voltage levels they operate and the degree of penetration of distributed generation

On one hand, the code recognizes that transmission network projects (outages?) have an impact on the DSO network (Article 22.5) On the other hand, DSO is not allowed to have access neither to the grid model nor to the information on outages on elements connected to the Transmission Network that affect DSO network This part of the Transmission Network that affect the operation of distribution grid = DSO Observability Area  This concept should be included both in the OPS & the OS codes  This information and the information about outages in DSO Observability will not be available to the DSOs within ‘the Transparency Platform’ 1. DSO access to information on transmission network

Significant DSO needs scheduling information from Scheduling Agents to be able to predict possible network constraints in advance –What is the difference between ‘forecasted scheduled Active Power’ (as mentioned in art of the OS code) and scheduling information? Significant DSO should be able to monitor Ancillary Services 2. Schedules of distribution network users & ancillary services

Additional Issues (I) 1.Similarly as for OPS, NRA approval seems to be limited to an inappropriately small subset of the code TSOs are allowed to come with requirements with no checks by the NRA impose them on DSOs and generators in breach of the law and exposed to substantial costs? (i.e. RCSIs) 2.Lack of clarity on definitions Critical Network Elements (Art c) - definitions & thresholds missing! The concept of Responsibility Area is misused! Very dangerous in a legal text. Which definition from previous codes should be used if there are contradictions? For example, the definitions of the Connection Point, Operational Security and Remedial Action differ in the DCC and OS codes The concept Close to Real Time is used in NC OS but without a definition, which is given here. If the concept is the same in OS, should be defined there. What is exactly the testing status? Is a new test to add up to tests in RfG, DCC and OS?

Additional Issues (II) 3.Do not include small units as Significant Grid Users (Art. 1) The inclusion of SGU as Aggregators of Demand, Providers of Active Power Reserve and Redispatching Aggregator makes every single user (including type A generators or even households!) subject to the requirements of the NC.  This comment also applies for Operational Security 4.General Provisions on availability plans (art. 32) The Availability Plans shall contain a separate Availability Status for each Relevant Asset with at least an hourly granularity (Art. 32.1)  Unjustified new requirement  DSOs recommend to keep the original proposal (daily granularity) 5.The TSO has the right of preventing some outages in Distribution networks users and elements (Art. 46) Who will bear the legal responsibility that could derive from that?

Conclusions & Recommendations The OPS code should fully consider Significant DSOs as System Operators and not as System Users The ACER Framework Guidelines should be respected as far as the information exchange between TSO and DSO is concerned Significant DSO Observability Area should be included in the code