Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

Bundesverband der Energie- und Wasserwirtschaft e. V. From Virtual (test) case to implementation Panel on way forward with Recommendations.
Classification: Internal Status: Draft Statoils view on the ERGEG GRI Secondary Capacity work Helga Franse – EU & Regulatory Affairs Stockholm – 26 November.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
RWE Transportnetz Gas 04/28/2009PAGE 1 ERGEG Gas Regional Initiative NW Short-term Capacity Project (C1) Comments by TSOs regarding different models discussed.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Gas Regional Initiative North West Region - Short Term Capacity RCC Meeting Den Haag – 21 September 2010.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Gas Regional Initiative South South-East
Congestion Management
GRI North-West Meeting
Conclusions STC Core Group 8 September 2009 The Hague
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Background and Process
GRI North-West Meeting
GRI North-West Meeting
Gas Regional Initiative South South-East
Gas Regional Initiative South South-East
Presentation transcript:

Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010

2 GRI NW SG Meeting Brussels – 26 November 2010  According to Roadmap project shall focus on short-tem capacity issues: -maximising use of existing capacity including reserve capacity through examination of how unused capacity could be released day-ahead and -investigating into how TSOs could be incentivised  Aim: make available firm primary capacity on day-ahead market Strategic rationale

3 GRI NW SG Meeting Brussels – 26 November 2010 Day-Ahead Oversubscription  TSO has good knowledge on how much capacity will be used  TSO slightly oversubscribes the system‘s capacity  In (rare) cases where flows exceed the system‘s capability TSO buys back the usage rights from shippers Short-Term Calculation  TSOs calculate available firm capacity based on long term assumptions and scenarios  In the period running up to real time TSOs have more certainty about network conditions, e.g.  Can release additional firm capacity to the market day-ahead Envisaged Approaches

4 GRI NW SG Meeting Brussels – 26 November 2010 Incentivisation  TSOs: Incentive mechanism that compensates the additional financial risks coming along with providing additional capacity is needed  TSOs sees incentive mechanism as prerequisite for further steps  The German case: Regulatory framework did not foresee the possibility of compensating additional financial risks through incentivisation  Other frameworks have in this regard more flexibility

5 GRI NW SG Meeting Brussels – 26 November 2010  The legal/regulatory framework in Germany (cf. ordinance “Access to gas transmission networks”) changed since prerequisites were identified  Amendement of ordinance “Access to gas transmission networks” (GasNZV; entered into force September 2010)  Gives the german regulator possibility of incentivisation  Particularly relevant in STC context: GasNZV, §10  TSOs may apply measures in order to offer capacity on a short-term basis beyond the already offered technical capacity (“additional capacity”). They are especially entitled to buy firm capacities back from capacity holders as far as this is necessary in order to ensure secure operation of the network.  TSOs have to use revenues generated through the application of measures for cost- recovery of such measures at first. In case revenues exceed the costs, TSOs are allowed to keep 50% of such revenue while 50% are booked on a settlement account. In case costs exceed the revenues, TSOs are obliged to bear 50% of the difference between costs and revenues while 50% are booked on a settlement account. Amendment of german framework

6 GRI NW SG Meeting Brussels – 26 November 2010  German TSOs welcome new ordinance with respect to the possibility of compensating additional risks  Incentivisation issue is not perceived as an obstacle anymore, but other concerns were raised:  How is the technical available capacity approved by NRA? -is still unclear how an approval procedure of technical capacity will concretely look like  such an approval procedure won´t be developed at short notice  Interference with other national/european processes -Obligation to develop one single capacity platform, auction design, merger of entry/exit zones resulting from GasNZV; determination process by BNetzA (bundling, restriction of renomination rights)  in light of limited resources prioritization needed -Cf. Comitology procedure on Congestion Management Procedure  Interference with bilateral initiatives -Cf. Link4Hubs, Gatrac, etc. Reaction by TSOs

7 GRI NW SG Meeting Brussels – 26 November 2010  Determination and commitment by all relevant parties including TSOs, NRAs, and shippers is key to realize a concrete pilot  Described environment is not supportive for a pilot at this stage  Where is added value of such a pilot, if similar products are already marketed? Cf. Link4Hubs  But still valuable lessons learned during this project:  Measures on oversubscription, capacity buy-back and short-term calculation have been intensively discussed and their interactions and dependencies with other measures like restriction of renomination rights were extensively reviewed; lead to substantial gain in knowledge and increased mutual understanding  Introducing of a incentivization mechanism in some regulatory frameworks; amendment of regulatory framework will have positive effects on offered capacity  Discussed measures in STC project found their way into recommendations on congestion management procedures Achieved goals / Lessons learned

8 GRI NW SG Meeting Brussels – 26 November 2010 Thank You!