Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration.

Slides:



Advertisements
Similar presentations
Evaluation at NRCan: Information for Program Managers Strategic Evaluation Division Science & Policy Integration July 2012.
Advertisements

User Guide TE Connectivity Data Collection Tool (DCT) January 2012.
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
Implementation of a Validated Statistical Computing Environment Presented by Jeff Schumack, Associate Director – Drug Development Information September.
28 April 2004Second Nordic Conference on Scholarly Communication 1 Citation Analysis for the Free, Online Literature Tim Brody Intelligence, Agents, Multimedia.
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Quality, the assurance of improvement. Quality, the assurance of improvement. Using ISO in AQU Catalunya Núria.
2 Slovenia Signed Contract of Confidence for the period Compliance assessment for one programme for the new period Experience of a Certifying.
1 Item 4.5 LSSIP Development and SES Reporting Reference: Action Paper SCG/10/AP06 Danny DEBALS LSSIP Manager SCG/10 – 25 February 2009.
The RCP Health Research Support Service (HRSS) The approach to transitioning the HRSS Governance Framework : Presentation for the National Information.
MINAP: DATA HANDLING PROCEDURES & DATA ACCESS Data Management Group, 13 July 2009.
2006 Objectives & the LMP Slip Past, Present and Future Market Forum, 26 January 2006 James Willison, Andy Brookes.
1 The Aon approach to reform May 2007 Nigel Roberts.
Market Reform in 2005 Progress Against MRG Objectives Andy Brookes Market Forum 15 December 2005.
1 Market Reform Forum Update 24 February 2005 Andy Brookes.
Reform Update Market Forum, 22 March 2006 Andy Brookes.
Copyright © Questionmark Corporation and/or Questionmark Computing Limited, known collectively as Questionmark. All rights reserved. Questionmark.
Project Procurement Management
EuSEC Tool Vendors Challenge Adie Ditchburn Jon Chard 19 Sep 2006.
Plant Engineering Life Cycle Conference 2005; 11 April Dalip Sud The Application of ISO Part 4.
Atos, Atos and fish symbol, Atos Origin and fish symbol, Atos Consulting, and the fish symbol itself are registered trademarks of Atos Origin SA. June.
EMS Checklist (ISO model)
Oracle Project Accounting/Contracts Presentation
Contents Introduction and Background The Objective Recommendations
Welcome to the Contract Lifecycle Management (CLM) module To move from one screen to the next please click the Next button on the bottom of the page or.
ICT Transformation Programme. Background April 2009 report by external consultancy on IT within the University May 2009 approval of report by SLT and.
“The Honeywell Web-based Corrective Action Solution”
New Products for © 2009 ANGEL Learning, Inc. Proprietary and Confidential, 2 Update Summary Enrich teaching and learning Meet accountability needs.
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
Web Enabled Vendor Data Collection on BP Angola Block 18 Project Howard Chipperfield, Information Manager BP c o n t e n t e n g i n e e r i n g.
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Milan Zoric, ETSI.
Get Started in e-Business. Aim This presentation is prepared to support and give a general overview of the ‘How to Get Started in e-Business’ Guide and.
AS ICT Building MS-Access Databases. Creating a Combo Box Drop Down List 1.When creating a Field requiring a Drop Down list in a Table, select the Lookup.
# 1 October 2003 Petroleum Reserves & The Needs of Financial Reporting Michael Lynch-Bell Partner in Charge Energy, Chemicals & Utilities, Transaction.
1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
Unlocking the potential from UKCS low deliverability reservoirs Colin Cranfield (DTI) Pete Naylor (ECL Technology)
Sedex: Registration and Account Set Up Instructions
Investigating Earth Systems
How the University Library can help you with your term paper
Provincial Budget Analysis Intergovernmental Relations
Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
DHHS ACCOUNTABILITY TEMPLATE Procurement Reform Road Show Fall 2014.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
© ChevronTexaco 2005 Standards & Information Management Adrian Goulding IM/IT Manager OF-LCIM (Europe) “How a Standard approach to Information Mangement.
ESourcing Presentation Richard Price Contracts Officer.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
David Warne Independent Manufacturing Consultant.
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Application Architecture Sample Presenter’s Name Presenter’s Title Organization,
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Drilling Data Management System
OSF/ISD Project Portfolio Management Framework January 17, 2011.
1 Global MSD INITIATIVES Global Business Process Standardisation SCITe a) S & OP, b) OCI GAME COE Management Information Refinery Management System MSD.
Construction Work Packaging
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
IT Requirements Management Balancing Needs and Expectations.
1 Information Handover at UniStar Lessons Learned Presented By: Bob Renuart UniStar.
Title of Presentation Name Date 2011 Presentation Template.
TERMINOLOGY TECHNOLOGY MANAGEMENT Increasing linguistic quality with our.
ST Quality WG I. Béjar Alonso Group Leader’s meeting 6th July.
ETendering Project Portal Jaroslav Konya March, 2012 Sharepoint Collaborative Portal.
Engineering Documentation
Construction Work Packaging
Integration of BIM in Lithuania
LCI – Supply Chain Collaboration
2016 Procurement Framework Contract Management
Product Development Scenario Overview
Your Facility Your Information
Definitions EPC EPCM Design/Build Contract Lump Sum
Presentation transcript:

Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

2 Background Block 18 – 6 deepwater fields operated by BP FPSO – Floating production, storage & offloading vessel 300m Long, 250kbbls / day EPCm contract with Kellogg Brown & Root, UK FPSO Hull built by Hyundai Heavy Industries, Korea First Oil Q BP investment of $3.3b

3 Learning Cycle Planning Standards Specifications Doing Contracts Data Collection Tools Reflecting Assurance Audit Linking Cleansing Correction Vision Planning

4 GPP Information management (Planning) Define Statement of Requirements during early stages of project (pre-feed) Agree standards i.e. ISO Agree project data and document requirements Write the requirements in to the contract Handover requirements (Responsibilities / Accountabilities) Detailed standards (numbering / handover) Clear Data Model Early Visibility of Data

5 Core Data Model

6 Data Collection (Doing) ICT Phasset Oracle Data Vault Document Vault Documentum KBR Oracle Data Vault Supplier Electronic Documents SDRL Document Register EIHS Templates and SDRL Data Requirements Import or Data Entry Document Posting/ Review Suppliers Propid P-H Document Meta-Data Engineering Data & Relationships Supplier SDRL Documents - Processes V

7 Close collaboration with: (Reflecting) KBR – EPCm Contractor Pearson-Harper – Validation and Content & Data Collection Tool Aveva – 3D Model & Engineering Portal People Process Technology

8 The Learning Cycle (Revised)

9 What is your paradigm? Electronic Data & Documents Single window Global Access

10 Status of deliverables

11 Conclusion Write requirements in to the contract (2 Years 3 months to polish the data) Comprehensive information set available for HUC and Operations (required detail in EIHS) Confidence the information set will be complete for 1st Oil (data has been validated) Any electronic system is only as good as the data entered (consistency and cleansing) Angola has only scratched the surface of possibilities Have a Vision People Process Technology

12