2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna 12.07.2006.

Slides:



Advertisements
Similar presentations
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
Advertisements

Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
SETSO Task Force Network Access and Congestion Management for the south-eastern European region SETSO Task Force Network Access and Congestion Management.
1 SETSO TF SETSO TF NACMPF SG Congestion Management and NTC.
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Procurement and Resource Adequacy Briefing August 2, 2006 Molly Sterkel, California Public Utilities Commission.
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Towards Regional Independent Operators – a main driver for successful market integration.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
PCR Status report AESAG, September Supported by:
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Actions for establishing a Single Auction Office for CSE 8 th IG Meeting Milan, 3rd June 2008.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
Update on electricity market Baltic Mini Forum 1 October, 2010.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
All Island Single Electricity Market IWFA Update Laura Brien
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
WG FBA Status Report Jerzy Dudzik IG Meeting, 12 th June 2007.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Supported by: PCR Status report AESAG, September
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
ETSO Comments on the draft Congestion Management Guidelines
NWE Day-Ahead Price Coupling
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Supported by: PCR Status report AESAG, September
29th April 2014 Teleconference
12th IEEE PES PowerTech Conference
Presentation transcript:

2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna

2 Commitment of 8 TSOs from CEE-Region Common willingness of 8 TSOs to improve allocation system:  Bring better in line commercial and physical load flows (PTR allocation)  Coordinated Capacity Forecast  Firmness and netting as far as possible from the view of secure grid operation  Foundation of an independent auction office  One stop shop, direct bids between all countries involved

3 Time schedule 5 th April – High Level Meeting: HLM decision of 8 TSOs to establish two Working Group for further development.  2 nd May:1 st coordination Meeting of WG chairmen  19 th May: 1 st WG – Meeting Flow Based Allocation  24 th May: 1 st WG – Meeting Coordinated Auctioning  14 th June: 2 nd coordination Meeting of WG chairmen  20 nd June: 2 nd WG – Meeting Flow Based Allocation  26 th June: 2 nd WG – Meeting Coordinated Auctioning  7 nd June: 3 rd coordination Meeting of WG chairmen 11 th July – High Level Meeting: Presentation of common Working Group report to HLG and HLG decision.

4 Current Status Working Group „Flow Based Allocation“ – chaired by PSE  Development of concept of flow based mechanism – PTDF and Border Capacities  Investigate necessary preconditions and environment  Common network model and common data Working Group „Coordinated Auction“ – chaired by APG  Prepare new approach of commonly owned, independent and transparent auction office  Auction rules for flow based allocation  Principles for distribution of revenues WGs work together, chairs coordinate frequently their work Joint presentation

5 Principles of Design of CEE Auction Office Joint  the same amount of shares of the AO for each TSO  the same rights of access to and control of the AO for each TSO Independent  AO with full legal rights  No subsidiary of a TSO Transparent  Towards national authorities and market participant (clear and easily accessible market information)  auction rules and results  Toward the AO shareholders (clear and easily accessible information for monitoring)  business process

6 General procedures for PTR auctions PTR Auctions TSOs PTR Holder Secondary Market Scheduling Support Risk Management “online” BCs PTDF-coordination Purchase Data Sale Data System Data PTDF, ABCs, Base Cases, Auction Results (historical, actual) Auction Participants Auction Entities AO:IT-related AO: Customer related  Proposed structure is also open for further developments (e.g. OMC)

7 Concept of Common Grid Model for capacity calculation by an Auction Office Capacity Forecast based on  Secure grid operation as first priority  Flow based method  Daily forecast for border capacities provided by common centralised body  Final decision remains with the responsible TSO  Not considering preventive measures to increase capacities (in order to save reserves for necessary re-dispatch during real time trading)  Sensitive data should be updated periodically (e. g. wind and hydro generation)

8 Decisions from HLG Principle support of the HLG for further investigation on PTR-auctions and on a centralised calculation of a grid model, capacities and PDTF matrix Principle support to provide data – as far as they are available General agreement on the content of a common Position Paper Decision on a preliminary optimistic time table (implementation scenario)

9 PTR Allocation - Challenges on technical parameters calculation New centralised approach of common calculation activities necessary (while responsibility for SoS remains with the individual TSOs) Higher complexity of the calculation process (more parties involved – not only regional, huge amount of data,…) If adopted to the specific region strongly affected by external regions creates „ chicken and egg story” More complex information of the offered capacities for market participants (ABC plus PTDF) In contradiction with present UCTE rules on scheduling  has to be modified

10 Position Paper: preliminary Time Table (optimistic) Phase 1Phase 2Phase 3Phase 4Phase 5Phase 6 1) Signing Position Paper 1) Continuation of WGs tasks’ (with support from “scientific” consultant) 2) Draft concept of technical parameter calculation 3) Fixing the principles of distributing the auction incomes 4) Finishing of concept of scheduling support (and impose UCTE to modify OH P.2) 5) Finishing of elaboration of legal framework 6) Adaptation and finishing of Business Plan Identify issues for Regulators for market harmonisation 1) Board approval on concept/methodology of technical parameter calculation 2) Implementation design of technical parameter calculations (contract) Acceptance of Regulators on principles on revenue distribution Notification EC Merger regulation Approval of Regulators on the concept of technical Parameter calculation 1) Acceptance of implementation design 2) Foundation of CEE- AO 3) Finishing of Auction Rules 4) Tender for IT Approval of Regulator on Auction Rules (and on Multilateral Agreement) 1) IT-installation 2) AO staff recruiting 3) Testing phase (Trial operation) Operationalisation of CEE-AO – Starting Phase August 2006 Nov 2006Dec 2006Q1/2007 Q2&Q3 /2007 Q4/2007*

11 Support and decisions from Regulators Support concerning market harmonisation Approval of costs for establishing and running a common AO before establishing the entity. Support according to possible obstacles due to the EC Merger Regulation 139/2004. Acceptance of principles on revenue distribution Approval of Regulators on the concept of techn. Parameter calculation To proceed with the process according to the shown time table support and decisions from Regulators are necessary!

12 Outlook Serious time constraints  Capacity forecast (common grid model, IT etc.)  Data to asses external effects from adjacent regions  Decisions in Supervisory Boards of TSOs necessary  Legal procedure according EC Merger Regulation 139/2004  Future Guidelines not entered into force until now  Changes in scheduling nomination procedure necessary (UCTE OH)  Approval of regional regulators for financing the CEE-AO Preparation to prolong current solution (AO: CEPS) with changed auction rules – but to change to new system as soon as possible

13 Challenging exercise, but all participating TSOs are giving their highest commitment to it and are stating their willingness to make a further step forward to a transparent market integration in the CEE region.