Blue Gold Which commodity, if you owned it all, would allow you to rule the world…?

Slides:



Advertisements
Similar presentations
The Original Insulated Concrete Form Over 55 years of satisfied customers.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Background images courtesy of abc.com 1,000, , , ,000 64,000 32,000 16,000 8,000 4,000 2,000 1,
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Text Chiller Plant Optimization that Reduces Energy Consumption 20-50%
1 Nia Sutton Becta Total Cost of Ownership of ICT in schools.
Jubail Industrial City A $45 Billion Super Project
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Future Value, Present Value and Interest Rates.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 Changing Profile of Household Sector Credit and Deposits in Indian Banking System -Deepak Mathur November 30, 2010.
New Jersey Industry and Occupational Employment Projections
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
2.11.
Liquidity Management Techniques
Who Wants To Be A Millionaire? Addition & Subtraction Word Problems.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Filtersorb SP3 & Scale Prevention
Exam 2 Practice Problems
Copyright © Cengage Learning. All rights reserved.
TYRONE ENVIRONMENTAL GRP.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Energy Efficiency: Benefits to Apartment Owners & Tenants
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Key Concepts and Skills
Break Time Remaining 10:00.
Find the total of 5 hours 10 minutes 3 hours 23 minutes 6 hours 39 minutes Click for solution + hours minutes7214 More than 60 minutes? YES: convert 60.
The basics for simulations
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Water Distribution Systems – Part 1
CM 4120 Julie King Original Presentation by Todd King and I edited it.
Jar Testing of Chemical Dosages
Mental Math Math Team Skills Test 20-Question Sample.
WATER CONSERVATION ISO
Improved Boiler System Operation with Real-Time Chemical Control
PRETON PRESENTATION PRINT COST SAVING (PCS) TECHNOLOGY PRETON - PRINT AND SAVE February 2006.
MCQ Chapter 07.
The Time Value of Money.
1 Time is Money: Personal Finance Applications of the Time Value of Money Barbara ONeill, Ph.D, CFP.
Copyright © Cengage Learning. All rights reserved. OPTIMIZING LOT SIZE AND HARVEST SIZE 3.5.
15. Oktober Oktober Oktober 2012.
Employer pays monthly fees for all employees Key disadvantage = Pay regardless of usage 100 employees x $15/m = $1,500/month 100 employees x.
Copyright © Cengage Learning. All rights reserved.
Chapter 2 Energy and Matter
8.4 Percent Concentration
Blue Gold Which commodity, if you owned it all, would allow you to rule the world…?
We are learning how to read the 24 hour clock
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Risk, Return, and the Capital Asset Pricing Model
Essential Cell Biology
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
A SMALL TRUTH TO MAKE LIFE 100%
Energy Generation in Mitochondria and Chlorplasts
Cost-Revenue Analysis for Decision Making
Chapter 16 Homework Day 2.
Why do I need water treatment. Breakdown of utilities.
Chemical BacComber Scale and Bacteria Control Comparison Between
Sustainable Management Resources Inc Join SMRI as we work on: “Creating a Sustainable New Economy” SMRI, San Diego CA, ~ ~ Steve Kaplan ~
By: Jim Kibby Fouling and ROI Tools (Return On Investment)
Presentation transcript:

Blue Gold Which commodity, if you owned it all, would allow you to rule the world…?

Water is a finite resource. There are NO substitutes..!!!  1) 69.3 gallons per day per US resident  2) Only 2% of all water is freshwater  3) All the lakes around Mexico City have dried and it is now sinking into the cavernous remains of its reservoirs  4) California runs out of water in 20 years  5) New Mexico runs out of water in 10 years  6) Ga tried to expand it’s border into Tn to secure water

Top Water Consumers  Thermoelectric Power by far the largest  Irrigation for crop production is next  The supply of potable water to the public is third

 Cooling Tower water use typically accounts for 10 to 45% of a facility’s total potable water consumption.  In Florida it can be as much as 75% of total water consumption in a commercial building  A typical 350,000 SF building can consume 8 million gallons of water annually Of that, 6 million gallons consumed by HVAC and up to 50% of that is wasted via bleed off. Public Supply %11

Up to 50% HVAC water use is dumped down your building’s drain every year. Thousands of dollars are going with it. Cooling Tower Bleed Off

Proper Water Treatment ◦ Protects equipment ◦ Extends equipment life ◦ Minimizes water and energy costs

Results of Improper Water Treatment ..

ZeroTek CG Solution’s Zero Bleed Tower Treatment Program CG Solution’s Zero Bleed Tower Treatment Program

What is ZeroTek ? Water softener Water softener Multi-media water filter Patented Green Chemistry

 With our patented chemistry, ZeroTek allows you to TURN OFF the bleed line and SAVE the water going down your drain.  Amazing amount of SAVINGS in water, energy and $$$.  No Scale formation. Any scale present is Dissolved away.  Returns system to Manufacturer’s Original Specifications as a result of scale removal.  Huge energy savings on scaled systems.  Corrosion rates are as good or BETTER than what you are currently experiencing.  System is totally AUTOMATED, for low or no labor hours.  Adds Points For USGBC LEED Building Certification. From Traditional To SofTek

Efficiency Scale Thickness - Inches % Increase in Power Cost Increase in Power Costs Based on 100 ton unit Operating 10 hours per day 25 days per month COST OF SCALE

 2007 water cost is $1.25.  2007 campus is operating on 1200 tons.  2010 water cost is $1.54.  2010 campus is operating on 2250 tons.  Less water is being consumed in June 2010 than June  Dollar Savings of $5,500 June 2010 over June Water Cost Savings Profile Profile

Profile Profile  2,250 Tons of Cooling operating at 40% per year = 900 Tons  24 hours per day  7 days per week  From 3.5 cycles of concentration to 21 cycles of concentration  120 ppm of Total Hardness to 0 ppm

 2.2 million gallons of water saved from the bleed line drain  Amount of Evaporated Water remains the same  370,000 gallons for processing ZeroTek equipment  2 points for USGBC LEED certification  $12 salt cost per day Water Cost Savings Profile Profile

 Water reduction savings $12,500  Sewage Rebate savings $30,500  Annual water savings $43,000  Estimated one-time equipment cost $22,000  Return on investment is less than 7 months. Water Cost Savings Profile Profile

Liquid Assets

Blue Trak 1 Blue Trak 1  Accurate automatic Chemical Controller  Works with or without your current chemical controller  Works in conjunction with ZeroTek Blue Trace  Utilizes Spectrometer technology to maintain accurate control settings  Models available for internet and BAS networks  Candidate for USGBC LEED Innovation, 1 point for building certification

SS-Brom SS-Brom  OSHA Classified as Non Hazardous Biocide  Electrolytic Bromine  Produces oxidizing biocide  Single Drum Treatment Program  No toxic fumes  No spill hazards  Effective against Algae and Legionnella  Candidate for USGBC LEED Innovation, 1 point for building certification DrumlessBiocide Drumless Biocide

ProductCost 20 % polyquat$ % hydantoin$ % DBNPA$ % trisnitro$ % MBT$ % glut$ % quat$ % carbamate$ % polyquat$ % iso$ 3.45 Stabilized bromine BLB-110$ 0.62 Biological Fouling To Determine Biocide dosage Amounts Generic Product Use Costs Standard 15 gallons/ton Cooling Tower System Evaporative 2 gallons/ton CondenserSystem Calculated as $ to treat 1000 gallons of cooling water, based on typical product strength, recommended average dosages, and prices as supplied by ProChemTech Electrolytic Bromine$ 0.28

Valencia Community College West Campus Electrolytic Bromine$ 0.28

ZeroTek Equipment

ZeroTek

ZeroTek Equipment

ZeroTek Liquid Assets  Water Softener to remove the total hardness from the make up to the cooling tower to prevent and remove scale deposition  Multi-media filter to pasteurize the recirculating condenser water  BlueTrak controller to automatically maintain proper inhibitor levels to prevent system corrosion  Mini-Brom non-hazardous biocide to prevent biological fouli ng

Formed by a group of highly dedicated, experienced, water treatment professionals in 1986, CG Solutions/ProChemTech has emerged as the world leader in zero blowdown technology. We furnish a complete single source, patent pending, technology package including water softeners, bypass filters, electrolytic bromine filters, biocide, and special water treatment chemistry required to operate a cooling system. CG Solutions manufactures its product line using state of the art technologies, superior consultants and a dedication to quality, providing complete laboratory analysis and expert technical assistance. Dedicated to delivering superior products and quality equipment, while adhering to the highest ethical standards. “Performance, Not Promises” Thank you for Your Interest in ZeroTek

Contact Information Gale A. Thompson LEED AP Ph: Fx: Web: