Www.cmar.csiro.au/staff/oke/ GODAE OceanView Observing system Evaluation Task Team Report Peter Oke 1 and Gilles Larnicol 2 1 CSIRO Marine and Atmospheric.

Slides:



Advertisements
Similar presentations
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Advertisements

By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 GlobModel The GlobModel study, initial findings and objectives of the day Zofia Stott 13 September 2007.
Data assimilation in the ocean
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
28 NOVEMBER 2011 SUSTAINABLE WATER MANAGEMENT PLAN TASK 1 – DETAILED WORK PLAN.
A-16 Portfolio Management Implementation Plan Update
© S Haughton more than 3?
GODAE OceanView Observing System Evaluation Task Team (OSEval TT) Session Introduction Peter Oke CSIRO Marine and Atmospheric.
- 1 - Heinrich Knottenberg ET WISC: WIS Development in 2006.
Introduction Objective: Develop regional ocean forecasting capability AU$15M co-investment for Phase 1 Partners: Bureau, CSIRO, Navy Launched 2003, Phase1.
GODAE OceanView-CLIVAR Workshop, Santa Cruz, June 2011 GODAE OceanView and its Task Teams Centre for Australian Weather and Climate Research; Wealth.
GOVST-III Meeting, ESA HQ, Paris, November 2011 GODAE OceanView Project Office Report 2011 Kirsten Wilmer-Becker, Met Office.
WGISS-24, DLR, Oberpfaffenhofen, Germany, Oct 15-19, 2007 Slide # 1 “CL Key Climate Data from Satellite Systems” Ivan Petiteville, CEOS WGISS-24,
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Other MAGDAS I Stations 2006 HER ABJ ILR AAB FYMLAQ TIR LKW DVS SMA EUS ANC GLY WAD MGD CST 2006 Jan. Feb. Mar. Apr. May Jun. Jul Aug. 5V1v1 9.
OSEval-TT Community papers Talk Outline  Engagement  Summary of community papers  Types of studies  Types of analyses  Questions asked 
OSE meeting GODAE, Toulouse 4-5 June 2009 Interest of assimilating future Sea Surface Salinity measurements.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Observing System Evaluation Task Team Peter Oke 1 and Gilles Larnicol 2 1 CSIRO – Centre for Australian Weather and Climate Research 2 Collecte Localisation.
GOVST-III Meeting, ESA HQ, Paris, November 2011 Inter-comparison and Validation Task Team (IV-TT) Report for GOVST Matt Martin, Fabrice Hernandez.
GOVST-V Meeting, Beijing, China, 13 – 17 October 2014 GODAE OceanView V Strategic Plan Introduction and Outlook on Related Discussions for the Week Andreas.
SMRCP-TT Report Recap Membership GOV Review Discussion Next steps.
GOV Technical Workshop OSE-IV - Santa Cruz, USA, June 2011 Fabrice Hernandez (Mercator Océan, Fr) and Matt Martin (Met Office, UK) GODAE OceanView.
GOVST-V Meeting, Beijing, China, 13 – 17 October 2014 GODAE OceanView V Meeting Topics and Objectives Andreas Schiller, Fraser Davidson and Kirsten Wilmer-Becker.
Real-time system Expert Team on Operational Ocean Forecast Systems GOVST, ESA-HQ, Paris 2011.
IGST, Washington DC, June 1-3, 2008 Our suggestions Our ambitions What we should keep from GODAE Core activities Working groups Relationship with ET-OOFS.
2 nd OSE Workshop, Toulouse, 4-5 June 2009 Eric Dombrowsky & Andreas Schiller Kirsten Wilmer-Becker Mike Bell and Pierre-Yves Le Traon Status of GODAE.
First GODAE OceanView Science Team Meeting, Mercator-Ocean, Toulouse, 8-10 June 2009 Eric Dombrowsky & Andreas Schiller Kirsten Wilmer-Becker Mike Bell.
GOVST-III Meeting, ESA HQ, Paris, November 2011 GODAE OceanView Work Plan Review 2011 Kirsten Wilmer-Becker, Met Office.
Observing System Evaluation Task Team Report Peter Oke and Gilles Larnicol CSIRO and CLS.
GOV- CLIVAR workshop, 13 th -17 th June OSEVal Task Team WorkPlan Gilles Larnicol (CLS), Peter R. Oke (CSIRO)
GODAE OceanView Observing system Evaluation Task Team Report Peter Oke 1 and Gilles Larnicol 2 1 CSIRO Marine and Atmospheric.
Y. Fujii 1, S. Matsumoto 1, T. Yasuda 1, M. Kamachi 1, K. Ando 2 ( 1 MRI/JMA, 2 JAMSTEC ) OSE Experiments Using the JMA-MRI ENSO Forecasting System 2nd.
GOVSTIII – Paris - November 2011 Eric Dombrowsky 1, Andreas Schiller 2, Kirsten Wilmer-Becker 3 1 Mercator Océan; 2 CSIRO; 3 the Met Office
GOVST-3, Paris, November 2011 GOVST Symposium, Review etc. Andreas Schiller, Eric Dombrowsky and Kirsten Wilmer-Becker.
Observing System Evaluation (OSEval) Breakout Session Peter Oke, Gilles Larnicol Santa Cruz, California, USA, June 2011.
The end users perspective – who are we doing this for? (e.g., climate science and data assimilation efforts) Peter Oke et.
First GODAE OceanView Science Team Meeting, Mercator-Ocean, Toulouse, 8-10 June GODAE OceanView: Task Teams and International Relationships Andreas.
GODAE OSE workshop: Towards Routine Monitoring. Pratical informations Coffee breaks: 2 are schedulled oustside at 10h30 and 15h30. Lunch : a cold buffet.
1 st GOVST Meeting, Mercator-Ocean, Toulouse, 8-10 June 2009 GODAE OceanView Membership Eric Dombrowsky (Mercator Ocean, France) Andreas Schiller (CSIRO,
CLIVAR PERSPECTIVE  Re-analysis and Seasonal Forecasting activities are common ground between the GODAE GOV and CLIVAR communities. This intersection.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Real-time Ocean Reanalyses Intercomparison Project for Quantifying Impacts of Tropical Pacific Observing Systems on Constraining Ocean Reanalyses for ENSO.
IGST 12 – August 2007 – St Johns GODAE-OOPC OSSE/OSE meeting Paris, November The GODAE initial requirements and a strategy for a global observing.
GOVST-III Meeting, ESA HQ, Paris, November 2011 Report from GODAE OceanView Patrons meeting 2011 Mike Bell co-chair GOV Patrons group.
Objectives Review work done on impact studies, OSEs and OSSEs over the past years Identify robust and common features Understand differences in assimilation.
Meeting/workshop at named location, date GODAE OceanView (GOV) Leading the Scientific Development and Implementation of Ocean Forecasting Systems.
Real-time Ocean Reanalyses Intercomparison: Ocean/Climate Monitoring Using Ensemble Ocean Reanalysis Products Y. Xue1, M. Balmaseda2, Y. Fujii3, G. Vecchi4,
Jan 2016 Solar Lunar Data.
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Real-time Ocean Reanalyses Intercomparison: Ocean/Climate Monitoring Using Ensemble Ocean Reanalysis Products Y. Xue1, M. Balmaseda2, Y. Fujii3, G. Vecchi4,
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
GODAE Final Symposium, 12 – 15 November 2008, Nice, France
GODAE Final Symposium, 12 – 15 November 2008, Nice, France
Presentation transcript:

GODAE OceanView Observing system Evaluation Task Team Report Peter Oke 1 and Gilles Larnicol 2 1 CSIRO Marine and Atmospheric Research; 2 CLS November 2011 “The most exciting phrase to hear in science, the one that heralds the most discoveries, is not ‘Eureka!’, but ‘That’s funny…’ ”, Isaac Asimov ( )

GOV OSEVal-TT organisation Co-Chairs:  Peter Oke (CSIRO)  Gilles Larnicol (CLS) Core Members:  Magdalena Balmaseda (ECMWF)  Laurent Bertino (NERSC)  Gary Brassington (BoM)  Jim Cummings (NRL)  Yosuke Fujii (JMA/MRI)  Pat Hogan (NRL)  Villy Kourafalou (Univ. Miami)  Daniel Lea (UKMet)  Matthew Martin (UKMet)  Avichal Mehra (NOAA)  Pavel Sakov (NERSC)  Anthony Weaver (CERFACS) Associate members:  Mike Bell (UKMet)  Eric Dombrowsky (Mercator)  Fabrice Hernandez (Mercator)  Eric Lindstrom (NASA)  Andreas Schiller (CSIRO)

Observing System Evaluation Task Team (OSEval-TT) 33 Routine Monitoring of the GOOS Routine Monitoring of the GOOS Delayed-mode OSEs and OSSEs for short-range and seasonal forecast systems Design and evaluation of new and future observation system components Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Capacity Building

Framework for Ocean Observing: where GODAE OceanView fits 44 Contributed by E. Lindstrom, OOPC Chair, NASA GOV OSEval-TT

Observing System Evaluation Task Team (OSEval-TT) 55 Routine Monitoring of the GOOS Routine Monitoring of the GOOS Delayed-mode OSEs and OSSEs for short-range and seasonal forecast systems Design and evaluation of new and future observation system components Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Capacity Building

Capability building: GODAE and GOV OSEval Workshops 1 st GODAE OSE/OSSE workshop (November 2007, UNESCO, Paris)  OSEval-TT established 2 nd GOV OSEVal-TT workshop (June 2009, CLS, Toulouse)  Initiation of Routine Monitoring activities  OSEval-TT work plan (draft) GOVST meeting (November, 2010, JMA, Tokyo)  Initiation of NRT OSEs (2 groups committed; 1 group delivered)  OSEval-TT work plan (final; GODAE OceanView and CLIVAR GSOP workshop on Observing System Evaluation and Inter-comparisons (June 2011, Santa Cruz, CA, USA)  Extension and expansion of NRT OSEs (4 groups committed; 4 may participate)  Concept of “Observation Impact Statement” introduced

Observing System Evaluation Task Team (OSEval-TT) 77 Routine Monitoring of the GOOS Routine Monitoring of the GOOS Delayed-mode OSEs and OSSEs for short-range and seasonal forecast systems Design and evaluation of new and future observation system components Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Capacity Building

Delayed-mode OSEs and design experiments 88 Altimeter SST XBT Moorings ForecastorBGFAnalysisorForecast Altimeter SST T/S XBT Moorings Evaluation / Validation Assimilated observations Assimilated and with-held observations T/S

Delayed-mode OSEs and design experiments Observing System Experiments (OSEs) –Assimilate real observations –Systematically with-hold observation types 99 Altimeter SST XBT Moorings ForecastorBGFAnalysisorForecast Altimeter SST T/S XBT Moorings Evaluation / Validation Assimilated observations Assimilated and with-held observations T/S

Delayed-mode OSEs and design experiments Observing System Experiments (OSEs) –Assimilate real observations –Systematically with-hold observation types  10 ForecastorBGFAnalysisorForecast Evaluation / Validation Assimilated “observations” Simulated observations Observing System Simulation Experiments (OSSEs)  Assimilate pretend “observations” … from a model  Systematically include different observation types … including future observation types

Delayed-mode OSEs and design experiments  Many examples of research in this area at the GODAE OceanView – CLIVAR GSOP workshop … refer to GOV-CLIVAR WS report  11

Observing System Evaluation Task Team (OSEval-TT)  12 Routine Monitoring of the GOOS Routine Monitoring of the GOOS Delayed-mode OSEs and OSSEs for short-range and seasonal forecast systems Design and evaluation of new and future observation system components Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Capacity Building

Responses to “observing system events”  Continuation of Jason-1 data processing in inter-leaved orbit (June 2009)  UKMet and BoM provided a demonstration of the impact of Jason-1 data in inter-leaved orbit during recent outages  13 Contributed by G. Brassington, BoM

Responses to “observing system events”  Continuation of Jason-1 data processing in inter-leaved orbit (June 2009)  UKMet and BoM provided a demonstration of the impact of Jason-1 data in inter-leaved orbit during recent outages.  Extension of life of Jason-1  CLS provided results to OSTST  14 Contributed by G. Larnicol and G. Dibardoure, CLS

Responses to “observing system events”  Continuation of Jason-1 data processing in inter-leaved orbit (June 2009)  UKMet and BoM provided a demonstration of the impact of Jason-1 data in inter-leaved orbit during recent outages.  Extension of life of Jason-1  CLS provided results to OSTST  Availability of Cryosat-2 data  GODAE OceanView Chairs and Patrons applied pressure to space agencies  15

Responses to “observing system events”  Continuation of Jason-1 data processing in inter-leaved orbit (June 2009)  UKMet and BoM provided a demonstration of the impact of Jason-1 data in inter-leaved orbit during recent outages.  Extension of life of Jason-1  CLS provided results to OSTST  Availability of Cryosat-2 data  GODAE OceanView Chairs and Patrons applied pressure to space agencies Too ad hoc – we need to be more organised 2010 GOVST  proposition of NRT OSEs  16

NRT OSEs  Routinely run parallel forecast at operational centers and with-hold a different data each month:  Quantify the impact of each data type on forecasts  Multi-system approach  Rotating data types each month  UKMet have participated  Australia and France have indicated that they will participate  China and Canada have indicated that they may participate  17 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Argo XBT TAO Jason-02 All altims SST Jul 2011 Aug 2011 Sep 2011 Oct 2011 Nov 2011 Dec Microwave SST Argo XBT TAO Jason-2

Observing System Evaluation Task Team (OSEval-TT)  18 Routine Monitoring of the GOOS Routine Monitoring of the GOOS Delayed-mode OSEs and OSSEs for short-range and seasonal forecast systems Design and evaluation of new and future observation system components Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Provision and management of Observation Impact Statements (OIS) based on OSEval evidence Capacity Building

Provision of Observation Impact Statements (OISs)  19

Provision of Observation Impact Statements (OISs)  20

Provision of Observation Impact Statements (OISs) Actions:  Agree on NRT OSE schedule  Agree on metrics  Agree on content of OISs  Agree on method of dissemination  21

Summary  GODAE OceanView OSEval-TT are committed to supporting observation agencies/teams in demonstrating the impact of observations on forecast and analysis products  Many groups are undertaking research activities to:  quantify the impact of past observations; and  contribute to the design of future observing systems  Recent initiatives have motivated operational centers to develop capabilities for quantifying the impact of current observations in NRT  DFS, analysis sensitivity, forecast sensitivity  The OSEval-TT has developed the idea of “Observation Impact Statements”  We need agreement on the details  Seek resources?  22