Coil TQ 36 size measurements F. Nobrega/ R. Bossert 6-8-10 1.

Slides:



Advertisements
Similar presentations
FIGURE 7.1 Elements of the final control operation.
Advertisements

AP Physics C Montwood High School R. Casao
Adders Used to perform addition, subtraction, multiplication, and division (sometimes) Half-adder adds rightmost (least significant) bit Full-adder.
RWTÜV Fahrzeug Gmbh, Institute for Vehicle TechnologyTÜV Mitte Group 1 GRB Working Group Acceleration Pattern Results of pass-by noise measurements carried.
Capacitance and Dielectrics
Cost Behavior, Operating Leverage, and Profitability Analysis
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
Objectives: Generate and describe sequences. Vocabulary:
Fraction IX Least Common Multiple Least Common Denominator
WHAT DO THEY ALL MEAN?. Median Is the number that is in the middle of a set of numbers. (If two numbers make up the middle of a set of numbers then the.
Writing Pseudocode And Making a Flow Chart A Number Guessing Game
Operations of Polynomials
1 1  1 =.
1  1 =.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
Addition Facts
Lecture 2 ANALYSIS OF VARIANCE: AN INTRODUCTION
Multiplication and Division
Applicable for Persons Registered under Article 10
Chapter 3 Resistance.
Biostatistics Unit 5 Samples Needs to be completed. 12/24/13.
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
Demand, Supply, and Markets 1 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for.
TQM05 (coil #36) Test Summary 1. TQ coil #36 in a mirror structure Coil #36 tested with a radiation resistant impregnation material 0.7-mm diameter Nb.
PP Test Review Sections 6-1 to 6-6
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Cable Protection Matching Protection Devices to a Cable.
EXAMPLE 1 Multiple Representations Gardening
Chapter 32 final exam review Charge originates from protons and electrons in atoms. Electric force—caused by interactions between charges. F = k q 1 q.
Synchronous Machines (AC Generators)
1..
Quantitative Analysis (Statistics Week 8)
Fraction IX Least Common Multiple Least Common Denominator
Adding Up In Chunks.
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Copyright © Cengage Learning. All rights reserved.
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
Copyright © 2010 Pearson Education, Inc. All rights reserved Sec
Tutorial: Understanding the normal curve. Gauss Next mouse click.
Partial Products. Category 1 1 x 3-digit problems.
Using Lowest Common Denominator to add and subtract fractions
9. Two Functions of Two Random Variables
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
EE 369 POWER SYSTEM ANALYSIS
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
1 Tests to Determine Lengths during Reaction of LQ cable R. Bossert, F. Nobrega, N. Andreev, G. Ambrosio, I. Novitski
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Measuring Fabric Thickness due to Binder, Pressure, and HT T. Holik QXF coil WG meeting Wednesday, March 11, 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
HQ Mirror Assembly R. Bossert
Presentation transcript:

Coil TQ 36 size measurements F. Nobrega/ R. Bossert

TQ coil 36 contains 54/61 cable made at LBNL and has 2 layers of butt lap 3 mil e-glass insulation. The purpose is to test the e-glass insulation system, both mechanically and electrically, for the future LQ coils. Azimuthal measurements of the coil were taken after curing, in a small measuring fixture as shown below. (impregnated coil section shown in fixture). Measurements of the coil at various pressures (5, 10, 15 and 20 MPa) are taken and compared to a steel master of the coil design size. 2

A plot of the measurements (size with respect to nominal coil size), together with all previously measured TQ coils, is shown below. 3 * All coils except were measured at four pressures. Coils were only measured at 10 MPa, because this is the measurement used to determine reaction cavity size. Measurements at other pressures for these coils were derived from average MOE of the other coils. x *

The most relevant point on the plot is that of coil TQ36 at 10 MPa. We expect to shim the reaction mold cavity to mils ( microns) larger than the coil azimuthal size at 10 MPa. This allows the coil to grow by that amount in the reaction mold without exceeding a pressure of 10 MPa. TQ cured coils varied between -150 and -475 microns at this pressure, (as can be seen from the plot) and the mold cavity was always set at zero, so many of the TQ coils were probably subjected to higher pressures during reaction. A study showed no significant correlation between the cured size and performance, although coil 19, which reached the highest %SSL of any TQ coil, was in fact the smallest after curing. 4 x 10 MPa TQ19

Coils 34 and 35, which were used in the last two mirrors, were significantly larger than the previous two coils due to the double overlap e-glass on coil 34 and the core on coil 35. The reaction molds on both these coils were shimmed by 20 mils larger than their respective cured coil measurement at 10 MPa, and both coils performed very well. (Incidentally, note that there are two measurements for coil 34, "TQ34" and "TQ34r". This is because we cured coil 34 twice, the second time at a higher pressure of approximately 45 MPa, as opposed to the normal 35 MPa, and the TQ34r measurement is after the re-curing.) 5 x 10 MPa TQ34 TQ34r

We were hoping that TQ36 would fall in the normal range of TQ coils, but unfortunately, it looks similar to coil 34. It measures +55 microns at 10 MPa. This means, if we are to use our mil rule, we need to shim the mold cavity to be about 20 mils larger than nominal. This works for a mirror coil, but will make the coils too big for use in a real magnet unless something else is removed which would change the field components. So this is not good news for the LQ coils. The current plan is to react and pot coil TQ36, section it and do electrical tests to qualify it for the next LQS. There are several options: 1.Still use this insulation system, but find a way to reduce other areas of the cross section, for example: a)removing the extra insulation currently placed at the poles (5 mils) b)reduce poles and or wedge size 2.Manufacture the cable smaller by an amount equivalent to the mil difference (this is about 1 mil per turn). 3.A combination of 1 and 2. 4.Consider a different insulation system, either the braided S-2 glass supplied by Arup, or a version of the e-glass with a 40% or less overlap. (needs qualification) Option 4 will require more ten-stack insulation tests, with the alternate systems. This can begin soon with either system. Fermilab has about meters of cable with the braided insulation supplied by Arup. 6