Microsoft Project Assigning Resources to Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
Advertisements

Microsoft Project Tutorial for Chapters 6 & 7
Resource Leveling with Microsoft Project PMI Baltimore Chapter Aberdeen, MD December 8, 2011.
Microsoft Project Notes Amir. Tasks Types Fixed Unit tasks – Unit refers to assignment Units as percentages. A resource can be assigned to a task 100%
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
OPSM 639, C. Akkan Before starting this section SAVE AS YOUR EXISTING MS PROJECT FILE AS -part3-1 -part3-1.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Resource Planning. 51 Resource Planning Estimating Schedule Activity Resource Requirements Determining what resources will be required (labor, equipment,
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Projmgmt-1/15 Depaul University Adding Resources In MicroSoft Project Instructor: David A. Lash.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Resource and Task Assignments Lesson 3. Skills Matrix SkillsMatrix Skill Assign work resources to tasks Make individual resource assignments Assign multiple.
Understanding Microsoft Project: Behind the Scenes Presented by Genea Mallow, PMP Director of Education, MPUG Senior Consultant, Milestone Consulting Group,
Project Management Software Application PRM 705 Lecture 19.
Schedule Leveling Tips and Tricks MS Project Professional 2010 Lloyd C. Miller III, PMP Director of Delivery Assurance.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Evaluation#3 MS Project Objectived u In this lab you will learn: – how to add the resources into tasks. –How to review resource assignment information.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
1 Managing Resource Utilization using Microsoft Project Leveling Presented by Larry Christofaro, PMP, MCITP February 29, 2008.
TUTORIAL 4 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 04/11/2012 Introduction to MS Project 2007.
MPA Best Practices – The Healthy Project Schedule June 7, 2006.
Advanced Scheduling In MS Project Provided by FrontRange MPUG.
Ahmad Al-Ghoul. Learning Objectives Explain how to begin working in your project by Gathering Information, Determining detail tasks, Determining detail.
Microsoft Project – Tutorial 4 Assigning Resources to Tasks Switch to the Gantt Chart View Then click the Assign Resources button on the Standard toolbar.
Project Management & Microsoft Project. MS Project Task Types n nFixed Units, Fixed Duration, Fixed Work n nUsed to calculate duration of tasks and subsequently.
Creating Effort Driven Schedules.  Objectives Understanding Your Job and the Tools Job Understanding Task Types Six Steps to an Effort Driven Project.
Project Management Software Application PRM 705 Lecture 32 1.
© The McGraw-Hill Companies, Software Project Management 4th Edition Resource allocation Chapter 8.
OPSM 301 Operations Management Class 19: Project Management: MS Project Koç University Zeynep Aksin
Microsoft Project 2007 Class Schedule of Topics. Topics Day 1 Review of MS Project Basics 1:00 – 1:30 Constraints 1:30 – 2:15 Dead Lines 2:15 – 2:30 Identify.
Prof. Roy Levow MS Project 2007, #2.  Many types of resources  Individual person by name  Individual people identified by job or function  Groups.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
The Formal Mechanics of Project Management Work Breakdown Structure Capabilities Resources Resource Requirements Resource Assignments Scheduling and Critical.
CS-411W VII – Resource Planning and Allocation. Definition Resource – any person, item, tool, or service that is needed by the project that is either.
© 2008 Sterling Commerce. Confidential and Proprietary. How to Get Along with Project Using Microsoft Project so that it actually works for you, not against.
Assignment-Level Tracking Field Calculations in Microsoft® Office Project Kelly Jones PMO Manager, Information Systems Sharp Healthcare.
How to keep Microsoft Project from being the Project 1/8/2003.
A Recipe for Preparing a Schedule that Works Ulla Merz prepared for MPUG phone: (303)
1 Microsoft Project 2003 Introduction. 2 Overview Microsoft Project is a specialized database that stores and presents thousands of pieces of data. Examples.
Project Management Software Application PRM 705 Lecture 16 Mian Wasim Irshad.
1 Copyright © 2015 Pearson Education, Inc. Module 1 Workshop 2 Creating a Detailed Project Plan Series Editor Amy Kinser by Kristyn Jacobson.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Concepts of Working with Tasks.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Celeris Systems Microsoft Project Association March 7, 2007.
E. M. Hanna; 7/31/03 DXI Management Consulting 1 Resource Leveling.
Resource and Task Assignments Lesson 3 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
VA Primavera P6: Activities and Milestones Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Fine-Tuning Resources Lesson 6 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
Understanding the Scheduling Formula and Critical Path Calculation PMI Scheduling Forum October 5, 2010 Presented by: Ric Albani, PMP, PMI-SP, MCTS.
 Tata consultancy services Production Planning WORK CENTERS.
Planning and Scheduling Your Project Using Microsoft Project 2003 Sridhar Pandurangiah Director - Engineering
MODULE 6 – RESOURCE LEVELING
OPSM301 MS Project Tutorial
Microsoft Project 101: How to Build a Project Plan
In this tutorial you will:
Project Management © 2004 D. J. Foreman.
Project Management © 2004 D. J. Foreman.
Scheduling is Difficult
Project Management © 2008 D. J. Foreman.
Daniel T. Renier President, Twin Cities MPUG
IEEE Aerospace Conference 2019 Rob Richards, Ph.D.
and Forecasting Resources
Pacific International Maritime Conference 2019
Presentation transcript:

MS Project

Terms Duration Work Resource Resource Units Effort-Driven Fixed Duration Fixed Units Fixed Work Over-allocation Leveling

Duration & Work Duration - The total span of working time or elapsed time required to complete a task. Work - The total effort required to complete a task.

Resources Resources are the people, equipment and supplies used to complete tasks in a project. Resources that are assigned to tasks but do not create work are known as material resources. Resource Units indicate how much of a resource's available time, according to the resource calendar, is being used to work on a particular task. In a project schedule, resource effort is expressed as assignment units or sometimes just as units.

Duration = Work ÷ Resource Units Scheduling Formula Duration = Work ÷ Resource Units

Fixed Units As the task's assigned units remain constant, an increase / decrease in assigned work will result in a corresponding increase / decrease in task duration. Fixed Units is the default task type for new tasks.

Fixed Work Duration = Work ÷ Resource Units If assigned work should remain constant, then as a task's duration goes up assigned units will go down (and vice versa). If assigned units are greater than max units, a resource over-allocation will arise. Duration = Work ÷ Resource Units or Duration = 1 ÷ Resource Units

Fixed Duration Duration = Work ÷ Resource Units For a constant task duration, as assigned work is increased so will assigned units. Decrease the units and the work will correspondingly reduce. Duration = Work ÷ Resource Units If assigned units are greater than max units, a resource over-allocation will arise.

Effort-Driven Only comes into play after the initial resource assignments have been made Work stays constant When resources (manpower) are assigned or removed from a task, Microsoft Project will extend or shorten the duration of the task to accommodate change in resources This is the default option for new tasks

Over-allocation Situation when more hours of a resource are allocated than are available Identifying Over-allocated Resources Special leveling indicator Resource Usage View – over-allocated resources are red Over-allocation can be resolved by leveling project

Leveling Resolving resource conflicts or over-allocations by delaying or splitting certain tasks. During leveling, assignments are rescheduled according to the resource availability profiles, assigned units, and resource calendars, as well as the task's duration and constraints. It is instigated either automatically or (more commonly) by the command level now. Tools | Level Resources . . . (hour by hour)