Washington Laboratories (301) 417-0220 web: www.wll.com7560 Lindbergh Dr. Gaithersburg, MD 20879 RF Exposure and Modular Equipment Considerations.

Slides:



Advertisements
Similar presentations
INTRODUCTION TO Wi-Fi TECHNOLOGY.
Advertisements

Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Overview of RF Exposure Regulations for North America.
AND OTHER ACCESS RESTRICTIONS
CONFIDENTIAL R.S.I. CORPORATION University Based Safety Training Personal Monitors.
“THE RF SAFETY PROGRAM and TRAINING REQUIREMENTS”
China Certifications (CCC/SRRC/MII) CCC – Safety and EMC/EMI
RF Safety Program - Guidelines for Compliance - Understanding
GSC: Standardization Advancing Global Communications For Information and Discussion Standardization development in the IEEE is carried out under the oversight.
How To Review a TCB Application
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD William H. Graff, American TCB Updates for Test Reporting.
How to Set Up, Secure and Manage A Network
Effectively applying ISO9001:2000 clauses 6 and 7.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD /6/61 Wireless Product Testing William H. Graff, AmericanTCB.
Airmux-5000 General Availability Releases 3.4
Pieter Robben ACB MIC MRA Workshop 2014 update. MIC MRA Workshop 2014 The workshop took place on February 2014 Approximately 150 attendees A broad.
Faculty of Computer Science & Engineering
M ULTISPECTRAL S OLUTIONS, I NC. Ultra Wideband RFID Technology Rob Mulloy Vice President & COO Multispectral Solutions, Inc. Multispectral Solutions,
Wireless Networks Review Question.
Doc.: IEEE /249 Submission May 2001 Zyren, Webster, Halford Intersil FCC Further Notice ET Docket Zyren, Webster, Halford Intersil.
March 2006 Slide 1 doc.: IEEE /138r0 Submission DRAFT - I Project: IEEE P Working Group for Wireless Personal Area Networks Submission Title:
Doc.: IEEE /1062r2 Submission Zhendong Luo, CATR September 2010 RF Feasibility of 120 MHz Channelization for China Date: Authors: Slide.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Cellphones and Licensed Radio Reports.
FCC Actions To Support Development of WISPS Julius P. Knapp Deputy Chief Office of Engineering and Technology Federal Communications Commission.
CTIA Industry Standards for Estimating Battery Life
ACB Module Assessment and Integration FCC and IC Michael Derby ACB Europe7 April
5/9/2015TCB Council1 TCB Sharing of FCC KDBs Michael Derby TCB Council Chairman 9 th April 2014.
August 8, 2005USCEL - August FCC Update William Hurst Chief, Technical Research Branch Federal Communications Commission Office of Engineering and.
RF Safety By Bob Buus, W2OD. Certification 6) Amateur Applicant/Licensee certifies that they have READ and WILL COMPLY WITH Section 97.13(c) of the Commission’s.
Slide 0 National Spectrum Managers Association Unlicensed Devices – An Update Mitchell Lazarus May 22, |
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15C Report.
1 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Module Approval Explained 04/18/02 Jeffrey Schiffer.
ESTeem Training Class ESTeem Overview. ESTeem Product Categories Licensed Serial – Long Range Application – Exclusive Use of FCC Frequency – PLC Emulation.
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February.
Radio Frequency Safety. Purpose Provide: Basic Technical Understanding Overview of FCC Regulations and Compliance Issues Hazard Recognition Skills Awareness.
March 17, Radiation Shielding Update and Guidance Don Parry, MHP, CHP Region I Physicist Michigan Department of Community Health Radiation Safety.
Joint Industry Canada/RABC Stakeholder Discussion - Ottawa, ON
Technician License Course Chapter 9 Lesson Module 21 Radio Frequency Exposure.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15B Report.
January 2005 Abbie Mathew, NewLANS Slide 1 IEEE /054r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to List a Test Site.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Desert William H. Graff President and Director of Engineering,
Regulatory Impact on Deployment in the United States - or - Non-commercial deployment of un- licensed radio networks will be more successful than.
Performing a Site Survey. Wireless Site Survey RF Frequencies (Licensed & Unlicensed) What market each RF Frequency serves? Types of Spectrum Analyzers.
Using License Exempt Spectrum for Wireless Broadband Ronald Repasi, Deputy Chief Office of Engineering and Technology Regional Educational Workshop On.
Doc.: IEEE COEX-02/011r0 Submission March 2002 Jim Lansford, Mobilian CorporationSlide 1 Simultaneous Transmission: Some comments from FCC Jim Lansford.
The Association of Electrical and Medical Imaging Equipment Manufacturers Nurse Call Systems & Emergency Call Systems Overview of ANSI/UL 1069 and ANSI/UL.
Doc.: IEEE j Submission May 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Office of Engineering and Technology Agenda Meeting January 15, 2004.
Radiation Safety Plan Recommended by OSHA Elements of Plan  Site Specific Issues  Personnel Training  Safety Procedures  Definition of Controlled and.
They are not the same Dennis Ward ATCB. The FCC has a requirement that Applications for certification through the TCB program must contain test reports.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Doc.: IEEE /1171r0 SubmissionRich Kennedy, MediaTek Summary of FCC Administrative Changes Proposed in NPRM FCC Date: Authors:
Using License Exempt Spectrum for Wireless Broadband Ronald Repasi, Deputy Chief Office of Engineering and Technology Regional Educational Workshop On.
Forced firmware lockdown? Christian
March 14, 2002 (revised 2/13/2002) 1 Version of CISPR 22 used in the United States by the FCC William S. Hurst Office of Engineering and Technology Federal.
NO ACTIVITY C SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)
Doc.: IEEE /0077r2 Submission January 2009 Peter Ecclesine, Cisco SystemsSlide 1 TV white space update 1 Date: Authors:
Doc.: IEEE j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
17/03/2016 Summary of FCC’s RF Exposure Proceeding Presented By: Bill Belt, TIA 1GSC-9, Seoul SOURCE:TIA TITLE:Summary of FCC’s RF Exposure Proceeding.
August, 2012 MBANS FCC Rules Summary Information document for SRD/MG on the FCC adopted MBAN rules under part 95 MedRadio service on 24 May 2012.
FCC Regulations for Spread Spectrum Devices
平成30年6月 November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Technical requirements for 950MHz.
Test Requirements and Procedures
GSM Base Station Antennas
RF Safety for the Radio Amateur
TRTR Briefing September 2013
Project: IEEE P Working Group for Wireless Personal Area Networks
April 24, Study Group 1 A Regulatory Framework for Use of TV Channels by Part 15 Devices John Notor, Cadence Design Systems, Inc.
November 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [UWB Coexistence Issues] Date Submitted:
July 2011 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal in Response to Task Group j.
Presentation transcript:

Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD RF Exposure and Modular Equipment Considerations

RF Exposure Rules SAR and MPE Estimation Summary Based on current interpretations of US radio law by FCC Based upon the TCB Exclusion List and various interpretations by FCC Based upon experience of ATCB

RF Exposure: SAR or MPE ? Questions to ask: oIs device used at less than 20cm to the body? And is the device above the Low Threshold conditions in the TCB exclusion list of July 17, 2002? oIs the device listed in (c)? If the answer to either of the above is YES than SAR evaluation is required

Definitions and Nomenclature oHost-independent: certification for device to be installed and expected to comply in any applicable host – unfeasible for portable exposure conditions oModule: Transmitter operating (usually) internally as part of another device or product oFull Modular Approval: Part 15 Tx module that meets eight criteria of DA , e.g., EMC tested stand-alone (stand-alone SAR is undefined), FCC ID label on host, etc. A full Modular approval with unlimited SAR configurations is not allowed.

Definitions and Nomenclature oLimited Modular Approval (LMA): LMA is used with SAR testing on an Unlicensed module to allow SAR tests to be applied to more than one model. oLicensed module: Certification for Licensed Tx daughter-board or Tx box, installed in RF category Mobile or Fixed conditions only. Antenna might be specified with limit on gain. oDedicated host: Tx intended for OEM integration or permanent installation into a specific host product; also covered by 3-host method for integral-antenna plug-in cards. Applies specifically to Part 15 modules above 100mW

Portable Devices oOperate less then 20cm from any user or bystander oUsually involves body worn or ear or face held devices oSAR Testing required if above the low threshold limit in July 17, 2002 TCB Exclusion List oSome devices are specifically required by law to have SAR testing as a condition of Certification, regardless of RF Pout. oExample: Cellphones; a PCMCIA card

Safety Rule References on Human Exposure oANSI C95.1 oIEEE 1528 oOET 65 oOET 65-C oFCC Part oFCC Part Mobile Devices oFCC Part Portable Devices oFCC Part (b)(4) oFCC Part 15E

Part 15 and RF Exposure The FCC will require a MPE study (RF estimation) for both Mobile and Fixed devices. (i.e and UNII devices). Estimation should be performed with highest gain antenna of each antenna type. For SAR and MPE evaluation, the default limits are the Uncontrolled Environment. It is assumed that users of Part 15 devices have no understanding of radio principals. You cannot evaluate any Part 15 device to the Controlled/Occupational limits.

Part 15 and RF Exposure The vast majority of Low Power Part 15 Intentional Radiators are categorically excluded from Routine Evaluation under the FCC rules. However, the FCC will require a SAR test for RF category Portable devices if the power exceeds 60/f(GHz) if contact with antenna is allowed, or 120mW/f(GHz) if 2.5cm is maintained to the antenna. Example: key fob Tx do not need SAR test

Supplement C: MPE Exposure Limits

Supplement C: SAR Limits

MPE Estimation Formula To Determine Power Density (s): oS=P x G /4piR 2 oFCC requires that RF category Mobile devices calculate power density for 20cm. oCalculation of power density at other distances for Mobile products not allowed. oCalculation of power density for Fixed devices is allowed, as long as distance not shown less than 20cm

Full Modular Approvals (Part 15) By Definition, these transmitters must have own reference oscillator. In addition a separate letter on Applicant letterhead addressing all these items must accompany the filing: 1.RF shielding. 2.Buffered data input/output ports 3.Power supply regulation 4.Permanent antenna or unique connector 5.Tested in stand alone condition 6.Labeled with own ID number 7.Instructions to operator / OEM integrator 8.Must meet RF Exposure requirements.

Limited Modular Approval (LMA) Part 15 If any of the 8 elements on the preceding slide cannot be met, a limited modular approval may be obtained in some circumstances. LMAs define special circumstances where Certification is valid Example 1: Wireless mini-PCI b/g card without voltage regulation Example 2: Wireless mini-PCI b/g card with SAR results which may apply to a specific chassis or model notebook PC host.

Licensed Modules There is officially no such thing as a Licensed Modular Transmitter The Rules of DA do not apply – DO NOT ATTEMPT

Complex Example Notebook PC with built-in Bluetooth, WiFi, and GPRS oAre Part 15 transmitters separately Certified? oAre Part 15 transmitters Modular Approved? oAre any transmitters capable of co-location? oIs BT below 5mw? oAre any transmitters end-user installable? oLabeling?

SAR Testing Updates. oSAR Probes must be calibrated on a yearly basis. The only allowed exception is when the probe manufacturer specifically permits different calibration intervals. oTolerance between RF conducted power measured at the EMC lab and SAR lab must be within 5%. Common spectrum analyzers are good to only 1dB (~25%) oTCBs now allowed to do SAR approval work from 300MHz to 6GHz.

Additional Documents FCC has released specific guidance for SAR testing of WiFi products. FCC is now specifying specific combinations of channel, power, and data rates. FCC has released SAR review to TCBs to frequencies of 6GHz.

Contact Information William H. Graff President and Director of Engineering AmericanTCB, Inc Whittier Ave. McLean, VA mailto: Corporate Phone: (703) Corporate FAX: (703) Direct Mobile: SKYPE: whgraff