System Operations Overview System Changes Physical Constraints Gas Distribution System 2003/2004 Scheduling Guidelines OFOs and Curtailment System Changes.

Slides:



Advertisements
Similar presentations
Transwestern Pipeline
Advertisements

Scott's Winter Forecast ! How do I make a forecast?
Shipper AShipper B Shipper C New 50 MDth/d Firm Load MDO = 100 MDth/d CMQ = 80 MDth/d MDO = 200 MDth/d CMQ = 50 MDth/d Lateral capacity = 300 MDth/d Given:
Bob Mishler Director Business Development January 15, 2008 LLC.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Energy Day Timing Issues and Operational Concerns Pipeline Segment Wholesale Gas Quadrant North American Energy Standards Board Business Practices Subcommittee.
1 Intra-Day Nominations through a Posted Point of Restriction Kathryn Burch Project Manager – Standards and Regulatory Compliance Spectra Energy Transmission.
Maines Dirigo Health Reform: Leading the Way to Universal Coverage? Academy Health State Health Research & Policy Interest Group June 2, 2007 Debra J.
Gravel Push-up Dam Removal, Lower North Fork John Day BPA Project A Cooperative Project of: The North Fork John Day Watershed Council & The.
Speed, Velocity and Acceleration
© Zurich Re Weather Risk Management David Molyneux, FCAS.
Water Distribution Systems – Part 1
1. For one hour, you travel east in your car covering 100 km
Dan Fox Senior Capacity Planning Consultant
Flash Flood Climatology for the Goodland County Warning Area 13 th High Plains Conference August 27, 2009.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
SAVING ENERGY AND IMPROVING COMFORT THROUGH ENERGY EFFICIENCY HOME IMPROVEMENTS JANUARY 28 TH, 2011.
© 2008 ICF International. All rights reserved. NYSERDA Much Colder Than Normal Weather Combination Case Results December 2009 Contacts: Kevin R. Petak.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
WINTER WEATHER INFORMATION. Coldest Temperature By State Alabama -27 Jan. 30, 1966 New Market Alaska -80 Jan. 23, 1971 Prospect Creek Arizona -40 Jan.
June 26, PCWA - Middle Fork Project Project Operations
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
5/10/07 Pipeline CO2 Spec Columbia Gas1.25 ANR Pipeline2.00 Panhandle Eastern2.00 Texas Eastern3.00 Tennessee3.00 Rockies Express Northern Natural Another.
© 2008 ICF International. All rights reserved. NYSERDA Much Colder Than Normal Weather Case Results November 2009 Contacts: Kevin R. Petak (
The Commonwealth of Virginia 2015 State Contracts Meeting – Compass Energy Placeholder.
THE HACKNEY HUB NATURAL GAS STORAGE FIELD Morgan County Ohio.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
®® QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014 We develop, transport and deliver clean.
UGI Choice Program Update Shaun Hart Thursday, February 23, 2012.
Conservation Action Committee April 17, 2014 Drought Watch 2014 Lake Oroville, 2014.
Stan Chapman SVP, Marketing & Customer Services Oct 8, 2013.
Michael Dirrane Director, Northeast Marketing NASUCA 2012 Annual Meeting November 13, 2012.
® July 30 th, 2014 Utah PSC Technical Conference.
® ®® ® IRP Workshop Feb 9, ®  February 9, Workshop - Review of 2014 IRP Order - December 30 and 31 Weather Event - Demand Forecast and 65%
Modeling with sine or cosine functions. Project Overview What do you know about the sine graph? What do you know about the equation of the sine function?
WINTER PREPAREDNESS PLAN ALLIANT GAS. Alliant Gas is the propane gas company that operates as a regulated utility in the towns of Payson and.
Wyoming Pipeline Authority January 24, Rockies Production Growth.
Energy Information Adminisration’s Outlook On Natural Gas Arkansas Public Service Commission “The Future Supply And Price of Natural Gas” June 3, 2003.
Electric/Gas Communications Workshop: Communications with Natural Gas Sector George Snyder Director, Capacity Services, Scheduling & Volume Management.
Review of SONI Power System Operations Alex Baird Grid Operations Manager Real Time.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS GAS LOAD FORECAST.
WINTER PREPAREDNESS ARIZONA WINTER PREPAREDNESS ARIZONA.
California Gas System Overview
Natural Gas Outlook The Tennessee Regulatory Authority Natural Gas Symposium August 19, 2003 Roy Kass Energy Information Administration (EIA)
Operations Update ERCOT Board Meeting March 18, 2003.
Climate & Weather Review. A wind that moves from north to south is called a: Polar wind 2.Arctic.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
California Independent System Operator ISO Department of Market Analysis1 ISO Department of Market Analysis Analysis of Day Ahead Congestion Costs, Curtailments,
CEC Workshop January 24, 2003 January 24, 2003 Chris Price Market Development Wild Goose Storage Inc.
Weather Differences Nov/Dec Wind - Days with Gusts >=10mph Year Oct Nov Dec Jan Feb Mar
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
The Commonwealth of Virginia 2016 State Contracts Meeting – Compass Energy Placeholder.
1 Supply, Demand, and Storage Overview West Gas Offsite September 10, 2001 Phil Polsky.
1 Gas Supply Preparations September 22, 2004 Columbia Gas of Maryland, Inc. Gas Supply Preparations September 22, 2004 Scott Phelps Director of Gas Procurement.
What is the Outlook? Aggregation of IRPs and other planning docs.
Customer Select Supply/Storage
Biodiesel Usage at Metro Transit
2016 Market Conditions Conference Dominion East Ohio Market Outlook
Customer Select Supply/Storage
Average Monthly Temperature and Rainfall
Constructing Climate Graphs
Mammoth Caves National Park, Kentucky
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
HOW TO DRAW CLIMATE GRAPHS
A Climate Study of Daily Temperature Change From the Previous Day
Technical Committee Meeting January 27, 2012
System Operational Update and Review December 4, 2018
Manager, Supply Resource Planning
2019 NATURAL GAS OUTLOOK WORKSHOP Presentation to the OPUC
Presentation transcript:

System Operations Overview System Changes Physical Constraints Gas Distribution System 2003/2004 Scheduling Guidelines OFOs and Curtailment System Changes Physical Constraints Gas Distribution System 2003/2004 Scheduling Guidelines OFOs and Curtailment

2 System Changes CG&E/ULHP Peak Day coverage for 2003/2004 is 1,010,000 dth Peak Hr. Coverage for 2003/2004 is 46,855 dth C.G.T. (South) limited to 25,000 dth/hr No Hourly Flexibility on TET or ANR Limited Flexibility on Texas Gas Lost Flexibility on F/L A due to customer growth Peak Day coverage for 2003/2004 is 1,010,000 dth Peak Hr. Coverage for 2003/2004 is 46,855 dth C.G.T. (South) limited to 25,000 dth/hr No Hourly Flexibility on TET or ANR Limited Flexibility on Texas Gas Lost Flexibility on F/L A due to customer growth

Physical Constraints CG&E For RFT and FT Deliveries 55% South 45% North (Dec - Feb) Based on Peak Day Design March - Nov there are currently no restrictions between North and South deliveries ULH&P FT Deliveries must be in the South For RFT and FT Deliveries 55% South 45% North (Dec - Feb) Based on Peak Day Design March - Nov there are currently no restrictions between North and South deliveries ULH&P FT Deliveries must be in the South

INDIANA OHIO TET TGT OHIO RIVER CGT ANR LAWRENCEBURG STATION BROOKVILLE STATION SPRINGBORO STATION DICKS CREEK FERNALD STATION COLD SPRING STATION ALEXANDRIA STATION RED LION LEBANON BUTLER UNION RD. MILLVILLE TRENTON AREA 6 AREA 7 CG&E-ULH&P-LGC PENDLETON COUNTY * * * * * * * * * * COLUMBIA "E" L I N E CENTERVILLE STATION AND. FERRY STATION CALIFORNIA STATION /TET LIBERTY RISING SUN STATION GUILFORD STATION BRIGHT STATION HARRISON VENICE STATION F & ROSE EAST. AVE 3 M I LE T/L "A". T/L "AA". T/L "W". T/L "C148". T/L "CG4". T/L "V". T/L "AM7". ERLANGER T/L "AM 4". T/L "AM". T/L "AM 7". CNG * FOSTER TET - Texas Eastern Transmission CGT - Columbia Gas Transmission TGT - Texas Gas Transmission KO - Kentucky-Ohio Transmission CNG - Consolidated Natural Gas ANR - American Natural Resources CVG Null Gas Flow Null Huntsville Norwood 150 psig 225 psig MAOP 175 psig 120 psig 200 psig 175 psig 355 psig 500 psig F/L SS". F/L WW". Blanchester

5 INDIANA OHIO TET TGT OHIO RIVER CGT ANR LAWRENCEBURG STATION BROOKVILLE STATION SPRINGBORO STATION DICKS CREEK FERNALD STATION COLD SPRING STATION ALEXANDRIA STATION RED LION LEBANON BUTLER UNION RD. MILLVILLE TRENTON AREA 6 AREA 7 CG&E-ULH&P-LGC With C-314 PENDLETON COUNTY * * * * * * * * * * COLUMBIA "E" L I N E CENTERVILLE STATION AND. FERRY STATION CALIFORNIA STATION /TET LIBERTY RISING SUN STATION GUILFORD STATION BRIGHT STATION HARRISON VENICE STATION F & ROSE EAST. AVE 3 M I LE T/L "A". F/L "A". T/L "AA". T/L "W". T/L "C148". T/L "CG4". T/L "V". T/L "AM7". ERLANGER T/L "AM 4". T/L "AM". T/L "AM 7". CNG * FOSTER TET - Texas Eastern Transmission CGT - Columbia Gas Transmission TGT - Texas Gas Transmission KO - Kentucky-Ohio Transmission CNG - Consolidated Natural Gas ANR - American Natural Resources CVG Huntsville Norwood 150 psig 225 psig MAOP 175 psig 120 psig 200 psig 175 psig 355 psig 500 psig Blanchester F/L "A". F/L C-314". 700 psig MAOP F/L WW". F/L SS". 150 psig New Texas Gas Tap New System Station

South Nomination Guidelines Columbia Gulf /C.G.T./Tennessee/KO Transmission Delivery Point Capacity –522,000 dth/day maximum –Dec - Feb RFT & FT marketers will have to deliver 55% of their supply in the South –I.T. customers may have firm capacity on pipelines but not behind city gate - curtailable on peak days or capacity constraints Columbia Gulf /C.G.T./Tennessee/KO Transmission Delivery Point Capacity –522,000 dth/day maximum –Dec - Feb RFT & FT marketers will have to deliver 55% of their supply in the South –I.T. customers may have firm capacity on pipelines but not behind city gate - curtailable on peak days or capacity constraints

North Nomination Guidelines Texas Gas/ Texas Eastern/ANR Delivery Point Capacity –280,000 dth/day maximum total (includes Lebanon Lateral) –Dec - Feb RFT & FT marketers will have to deliver 45% of their supply in the North –CG&E has 100,000 dth/day of station capacity available at Dicks Creek served from Texas Easterns Pipeline –Best delivery point for I.T. customers Texas Gas/ Texas Eastern/ANR Delivery Point Capacity –280,000 dth/day maximum total (includes Lebanon Lateral) –Dec - Feb RFT & FT marketers will have to deliver 45% of their supply in the North –CG&E has 100,000 dth/day of station capacity available at Dicks Creek served from Texas Easterns Pipeline –Best delivery point for I.T. customers

ANR/Texas Eastern (Lebanon Lateral) Scheduling Guidelines FT and RFT Marketers have 50,000 dth/d available Nov-Mar Capacity Request Form must be completed Deliveries for I.T. Customers Nov - Mar is best effort day to day Apr - Oct 20,000 dth/d max FT and RFT Marketers have 50,000 dth/d available Nov-Mar Capacity Request Form must be completed Deliveries for I.T. Customers Nov - Mar is best effort day to day Apr - Oct 20,000 dth/d max

Operational Flow Orders I.T. Customers When warmer than normal weather occurs, especially in Nov and Dec (storage injection limits are at minimum) –Gas nominated must be at or below usage for the day When colder than normal weather occurs, (may be issued when average temperatures are below 20 degrees) –Gas nominated must be at or above usage for the day When warmer than normal weather occurs, especially in Nov and Dec (storage injection limits are at minimum) –Gas nominated must be at or below usage for the day When colder than normal weather occurs, (may be issued when average temperatures are below 20 degrees) –Gas nominated must be at or above usage for the day

Curtailment I.T. Customers Curtailment may start at a low temp of about 0 degrees with 4 levels of curtailment. Other factors to consider –wind speed –day of week –temperature lag –Gulf freeze offs Curtailment in the eastern part of the system may occur at warmer temperatures. Curtailment may start at a low temp of about 0 degrees with 4 levels of curtailment. Other factors to consider –wind speed –day of week –temperature lag –Gulf freeze offs Curtailment in the eastern part of the system may occur at warmer temperatures.