Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Adobe Upper Reach 5 Conceptual Plan Issues December 9, 2003 Workshop.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

Westland-Ramos Fish Passage and Habitat Restoration Project BPA Project No September 23, 2004 Westland Irrigation District.
Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to.
Past and Current Initiatives in Pinellas County to Coordinate Planning between the School Board and Local Governments 1996 – Interlocal Agreement and Comprehensive.
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Brief Synopsis of Project Hickahala Creek Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS Designed by Submar,
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Design of Open Channels and Culverts
Examples for Mitigation Category 1 and 2 Streams.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Using Barriers with the Wind Erosion Prediction System
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Upper Brushy Creek Water Control & Improvement District
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Interim Headwater Drainage Feature Guideline: Protecting HDFs through Urbanization Laura C.R. Del Giudice, B.Sc., M.F.C., Senior Planning Ecologist.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Arroyo.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Planning and Community Development General Plan EIR: Preliminary Alternatives City Council February 10, 2014.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
City of Bellingham Habitat Restoration Master Plan TAG Meeting December 5, 2012 ESA | VEDA Environmental | Northwest Ecological Services.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Becky Houdek - Assistant Planner Minnehaha Creek Watershed District Minnehaha Creek Reach 14 Feasibility Study Insert photo.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Public Meeting May 15, 2007, 6-9 pm Millville Grange Palo Cedro, CA.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
11/31/08 South Feather Power Project (FERC Project No. 2088) PM&E Proposal January 31, 2008 Plumas National Forest, Oroville, CA.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Post-Flood Training - Municipal Officials/Contractors Rick Weidenbach, Executive Director Delaware County Soil & Water Conservation District Scotty Gladstone,
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
 Beginning in the late 1980’s significant loss of forest cover and channelization in the area of Block 72, lead to increased total and peak flows being.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
ND Downstream Watersheds Comprehensive Detention Planning
Little Rapids Habitat Restoration St
General theory “Water seeks it’s own level”, i.e. if there is a hydraulic connection, total energy will be uniform throughout the fluid “Inverted siphon”
Water Reclamation Plant Feasibility Study Update May 28, 2014
2016 SFEG Restoration Update
Land Use and Zoning Committee Special Workshop
Measure A Financial Oversight Committee August 7, 2013
MPO School Transportation Working Group
Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS
Histon Road LLF Resolutions and Programme
Presentation transcript:

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Adobe Upper Reach 5 Conceptual Plan Issues December 9, 2003 Workshop

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Modeling of Flows At minimum, provide capacity to convey what flows under W. Edith Ave. Bridge Downstream of W. Edith Ave. Bridge: –Accommodate Flows A, B1, and B2 –Partially accommodate Flows A, B1, B2 and allow for overland flow on Rogez/Astiz property parallel to creek

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Top of Bank Boundaries Before moving forward, there must be agreement on allowable top-of-bank margin for proposed project –Line 1 – twice width of existing creek –Line 2 – matches width of creek d/s of Robleda Drain –Line 3 – Swansons 1% top-of-bank

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Top-of-Bank Boundaries (contd) Middle line seems to be good working top- of-bank target Can land between Line 2 and Line 3 be potentially used for mitigation planting?

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Width of Creek Channel Upper Reach 5 should not be wider than lower Reach 5, within limits of good channel design Can creek be made deeper to minimize channel width w/out compromising downstream and upstream portions or acceptable creek design?

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Channel Relocation Removal of oxbow near Theis property is OK Creek channel can be moved 5-10 feet toward LAH side if needed to protect trees on Los Altos side

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Banks ACWG proposal includes gabion or rock rip rap for creek banks to minimize channel width Regulatory agencies may have issues with these options and may require mitigation for installing such hardscape

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Mitigation Mitigation may be required for: –Adding hardscape to channel –Loss of riparian habitat along top-of-bank due to channel widening Ratio of mitigation varies based on value of lost habitat Mitigation ratios? 1:1, 2:1, 3:1

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Mitigation (contd) Regulatory agencies prefer mitigation to be done at site of impacts District has strong interest in mitigating for impacts on site Minimize channel width and use portions of Rogez/Astiz properties for mitigation plantings

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Transplanting Trees District will evaluate this work In the interest of cost-efficiency, this criterion may be difficult to achieve

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Proposed Conceptual Approach Detailed hydrology to determine Flows A, B1, and B2 Assume rock rip rap or gabion banks with slopes of 1:1 or 1.5:1 Develop appropriate channel bottom slope –Match existing downstream invert and desired invert under W. Edith Bridge –Drop structures to allow for fish passage

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Proposed Conceptual Approach (contd) Determine minimum width of channel to convey flow (A) coming under W. Edith Bridge Determine minimum width of channel to convey portion or all of overland flows B1 and B2

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Proposed Conceptual Approach (contd) Follow CEQA process to determine impacts of project and develop mitigation proposal Maintain continual interaction with ACWG and City/Town while developing alternatives

Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting NEXT STEPS Draft Proposed Project Plan (PPP) – January 28, 2004 Review, discuss, modify PPP – February 23, 2004 Prepare for District Board consideration – March 2004 Present PPP to Board – April 6,2004 Incorporate into Capital Improvement Program