Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers

Slides:



Advertisements
Similar presentations
Use of Tracers as a Leadership Tool
Advertisements

Site Safety Plans PFN ME 35B.
Life Safety and You. Life Safety is comprised of: Codes Standards Regulations Documentation LIFE-SAFETY-Refers to the joint consideration of both the.
Biggest Pitfalls and Best Practices: Life Safety
Emergency Preparedness and Response
Fire and Environmental Safety Health, healing and hope.
1. 2 Earthquake effects on health care facilities 2.
Customer Service.
2014 National Patient Safety Goals
1 1 EMERGENCY ACCREDITION TEAM. TRAINING and ORIENTATION Did you receive any training of the following : BLS and Other life support. fire and safety.
Tulane University - Office of Environmental Health & Safety (OEHS) FIRE SAFETY – RESIDENTIAL FACILITIES For all staff members in Housing and Residence.
EOC: Semi-Annual Review of DOH Survey Citations, The Top 10!
© Copyright, The Joint Commission 2015 National Patient Safety Goals.
Emergency Action Plans
Utility Management Providence Health System - Oregon Environment of Care.
SAFETY AND SECURITY. SAFETY These are hazards in any establishment and their prevention is of tremendous importance. The housekeeper, along with other.
Annual Evaluation of the Environment of Care (EOC) Program
Randy Benson Executive Director Rural Healthcare Quality Network.
What is it? Alarm Fatigue Alarm fatigue occurs when clinical personnel fail to respond appropriately to alarms due to excessive or inability to understand.
1 © ECRI Institute 2011 Wake up! This is alarming! ALARM FATIGUE Kara Polichetti.
Interim Life Safety Measures Eleven Administration Actions of Interim Life Safety Measures ÷Ensure free and unobstructed exits. Personnel receive additional.
RHQN Members Conference Call September, 2012 Semi-Annual DOH Survey Update The Environment of Care Randy Benson Executive Director Rural Healthcare Quality.
The Life Safety Surveyor Facility Tour
January 16, 2014 Brad Keyes, CHSP Changes to the 2014 Acute Care & Critical Access Hospital Manuals on Life Safety Compliance.
Cancer Center Training 2012 Cancer Center Training 2012 “Defend in Place” Strategy for Fire Alarm Activations Cancer Center Building #7559.
DOH Survey Citation Update; What’s New, What’s Hot, What’s Not!
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Randy Benson Executive Director Rural Healthcare Quality Network.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
Department of Patient RelationsMeasuring to Achieve Patient Safety General Information Session.
BY: GROUP 2 Food Safety Regulations and Standards.
The Nurse’s Perspective and responsibilities
Tracer Methodology Presented by the Accreditation Matrix.
EGRESS AND FIRE PROTECTION
1 The Karmanos Cancer Center’s ENVIRONMENT OF CARE 2009.
Part 3: Meeting the Facility Tour Challenge Preparing for the Life Safety Specialist Facility Tour and Documentation Review Healthcare Engineering Consultants.
The Second Survey Point of Vulnerability How Should I Prepare for the Facility Tour? Healthcare Engineering Consultants.

JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
Alarm Fatigue: Improve Alarm Management & Patient Safety in 2014 Patton Healthcare Consulting 1.
MEDICAL EQUIPMENT AND UTILITES MANAGEMENT Louis Stokes Cleveland, Department of Veterans Affairs Medical Center JCAHO Environment of Care Series Fiscal.
JCAHO Accreditation/Survey Process for Ambulatory Surgical Center (ASC) By F O HSCI 547 Fourth Assignment.
C A & Courtemanche & Associates HEALTHCARE SYNERGISTS.
What’s New for 2008? Healthcare Engineering Consultants Does the Joint Commission Manual Have Major Changes for 2008?
Changes and Challenges for “EC” in 2009 Presented by: Gary D. Slack, PE, CCE Healthcare Engineering Consultants Joint Commission.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Department of Quality and Regulatory Affairs Barbara Ann Karmanos Cancer Center The Karmanos Cancer Center Regulatory Readiness (for Non Clinical Staff)
Understanding TJC 2009 Life Safety Code Chapter
Weekly Survey Prep Tip 9/30/13 Staying Survey Ready.
Add name of trust / organisation in box 1 and name of trainer in box 2. Delete THIS box.
The Accreditation Survey On-Site Agenda George Mason University College of Nursing and Health Science Regulatory Requirements for Health Systems Summer.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
What you will learn in this session 1.The characteristics of fire, smoke and toxic fumes 2.Fire hazards involved in the working environment 3.Significant.
RANDY BENSON, PH.D. COMMON DOH SURVEY CITATIONS. Environment of Care and State Fire Marshal DOH is Very Busy DOH Was Running Days Behind Schedule.
COMMON DOH SURVEY CITATIONS UPDATE RANDY BENSON WHS HEALTHCARE QUALITY SERVICE JANUARY 2016.
RANDY BENSON CONSULTANT HEALTHCARE QUALITY SERVICE How To Keep The Fire Marshal Happy.
© 2016 Cengage Learning ®. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
NANCY CHOBIN, RN, AAS, ACSP, CSPM, CFER CHOBIN & ASSOCIATES CONSULTING HOT TOPICS IN STERILIZATION AND DISINFECTION.
SteriTite Instructions for use
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
BY: JESSICA ODOM Importance of Alarm Fatigue. Objectives Participants will be comprehend the history and background associated with alarm fatigue Participants.
Alarm Management Quality & Risk 2014.
Safety and Infection Control: Reporting of Incident / Event / Irregular Occurrence / Variance & Safe Use of Equipment Lorelei Sepulveda 1.
CIHQ - All Rights Reserved 2017
Fire Door Inspections Qualified Training
Clinical Alarm Systems - NPSG Goal # 6 -
MINNESOTA STATE FIRE MARHSAL DIVISION HEALTHCARE TEAM
Alaris Pump Alarms Management
Chemical Purchasing.
Presentation transcript:

Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA

Speaker Jennifer Cowel, RN MHSA TJC Experience: Former TJC Hospital Surveyor and former Director of Service Operations in Accreditation in Central Office Accreditation and regulatory compliance consultant Vice President and Principal Patton Healthcare Consulting 630-664-8401 JenCowel@PattonHC.com

Alarm Fatigue & Top Scored What, Me Worry? Alarm Fatigue – JC Online Aug 2011 Issue highlighted at TJC Executive Briefings 4 of the top 5 scored standards were in EC or LS In 2011 - LSC days increased Surveyor Focus on industry trends Alarms have led to Immediate Threat

2012 Decision Categories PDA Contingent Accreditation Accreditation with Follow-up Survey (AFS) Accredited Ex: Immed Threat to Life or falsification or fail to clear RFIs after two tries when in CONT Ex: Failed AFS after 2 tries, or No License, etc Ex: Too many RFI’s CoPs non compliant. Ex: Compliant or cleared all RFIs w/ ESC Perspectives 11/2010

Alarm Fatigue A Growing Problem FDA article reports 566 patient deaths between 2005 – 2008, related to alarms The numbers are self reported and are likely to be higher Twenty-five years ago, few, if any alarms on equipment Today – increasing equipment and increase in type & # of alarms 566 reports of patient death related to the alams on monitorin gdevices.

Alarm Fatigue A high-profile Problem A patient on cardiac monitor died after V-Fib, dysrhythmia processing turned off Perinatal monitor did not audibly alarm fetal distress, only visual, went unnoticed A patient stopped breathing but staff just didn’t hear the monitor The monitor detected it, but neither v-fib or asystole would have sounded an alarm as that aspect of monitoring had been suspended

10 Years of TJC Focus Sentinel event alert in 2002 focus on clinical ventilator alarms Introduced NSPG Moved clinical alarms to standards ‘05 Participating in fall summit by AAMI, ACCE, ECRI Problem continues to grow The summit is to identify specifi actions

What is Alarm Fatigue? Or Crying Wolf Alarm fatigue occurs when clinical personnel fail to respond appropriately to alarms due to inability to understand the critical nature or priority of the alarm. Staff become desensitized after experiencing and handling so many. Alarms are ignored or turned off.

Taking a Good Thing Too Far Go beyond the visual/audible alarm, to cell phone, pager alerts, dashboards, nurse call systems Beyond the basics – bed alarms, chair alarms, IV, call button, hand sanitizer. Study of alarms in critical care units 900 to 1300 alarms per day, per unit. Alarms every 66 seconds Study conducted by childrens national medical center and vendors published in AAMI. Recorded tens of thousands of alarms in in 30 day period. Johns hopkins study in 2005 observed 16,934 alarms on one unit in 18 day time period.

Understanding the Issues FDA published results of 216 manufacturer reports on monitor related deaths TJC analyzed sentinel events for monitor related causes

Common Causes Staff are overwhelmed by the # of alarms Staff don’t respond or hear alarms Staff turn-off or turn down alarms Alarm settings not returned to original setting after a patient move Alarm not properly relayed to wireless or paging system

Common Causes Nuisance Alarms reduce sensitivity As many as 99% of ICU alarms are false, or non-critical alarms No routine replacement of batteries, leads to excessive “low battery” alarms Put a “ring” on it - The solution to many problems or RCAs is to add an alarm on it to prevent recurrence. Alarms just become back ground noise Children’s national hospital demonstrated that 85 – 99% of alarms were false positive. We are inundated with information and alarms, most of which is meaningless. Put a ring on it – alarms for call bells not answered, for chairs, for hand sanitizer,

Causes – Cont. The Sound of the Alarm Med Equipment companies create their alarm to fetch attention, the beeping is intended to irritate Sounds of alarms do not differentiate a ‘notification’ from a critical event. Sounds are difficult to learn, differentiate which alarm Difficulty learning > 6 alarm signals

Causes – Cont. Alarm noise contributes to sound level in unit, disrupts sleep and environment of healing Users can turn alarms off, change parameters, reduce volume. Alarms are not tailored to the individual patient Nurses block out noise to focus on task Medication mangement – don’t want disrutions, nurse tune out to improve complex tasks. FDA report on device related deaths

Concrete Steps to Improving Safety/Effectiveness of Alarms How many alarms are tolerable to staff to avoid fatigue? Anesthesiology Today study suggests 2 – 4 per patient/day Reduce Thresholds for alarms, use evidence based approach. Define when a clinician needs to go to bed side

Reducing False Positives A Johns Hopkins Study: lower SpO2 alarm from 90& to 88% reduced alarms by more than 50% Place delays on alarms, delay alarm by 15 seconds. Journal of Emergency Medicine (JEM) study. Reduced false positives by 80% Get to only the alarms staff care about

Improving Safety of Alarms Cont. Equipment maintenance Reduce low battery alerts by replacement Deactivate or limit overrides Routine testing of alarms Selection of equipment Vendors with meaningful alarm sounds Implement intelligent escalation of alerts Involve staff in equipment selection Test alarms, are they audible? Alarm when disconnected? Have appropriate parameters?

Improving Safety of Alarms Cont. Alarm Notification Alternatives Consider central surveillance room with monitor watchers than notify care givers Consider alarm integration systems that directs alarms to devices worn by staff

Improving Safety of Alarms Cont. Staff Training Train staff on meaning of all alarm sounds Train staff to check patient before silencing any alarm Train staff on new equipment Train staff on proper alarm placement, skin preparation, ensure competence In a january 2011 publication “preventing medical errors, FDA recommende several thing to avoid alarm-related injuries.

Improving Safety of Alarms Cont. Develop and implement policies Who can change alarm settings Who needs to be monitored What are default settings Who is responsible for performing clinical alarm monitoring rounds Develop audit tool to measure compliance with established policies Develop and complete check list at shift change for patient alarm settings In a january 2011 publication “preventing medical errors, FDA recommende several thing to avoid alarm-related injuries.

Top Scored EC & LS Standards Surveyors see these everywhere, low hanging fruit These are seen by both the LSC surveyor and the clinical surveyors Prevent them from seeing these at your organization and create an impression on day 1

Exits and Cluttered Corridors (LS.02.01.20 -57%) Hospital maintains means of egress Easy to find issues, educate on: Blocked or locked egress doors Corridor clutter, storage in hallways Linen carts and latex carts will be scored Exit signs – burned out, enough, proper location, “No Exit” signs posted

Fire Protection Features (LS.02.01.10 - 57%) Building & fire protection features minimize the effects of fire, smoke and heat. Fire and smoke doors labeled, correct type, close, label visible, under cut, door gaps, adhesive tape over latch Penetrations are sealed with correct material – IT cables biggest offender. Consider a work permit and inspection

Fire Doors, cont Inspect and maintain fire doors Appropriate fire rating on doors and frame Door positively latches Door had a closure No gaps > 1/8 inch, or undercut >3/4 inch Resulted in ITL if multiple problems

Fire Protection Equipment (EC.02.03.05 – 42%) Hospital inspects, tests & maintains fire safety equipment. Includes testing of: fire alarms boxes, smoke detectors, sprinklers, portable extinguishers, magnetic release devices, tamper switches & water flow devices. If outsourced to a vendor keep the report, read the report and act on problems! Make sure reports are tied to an inventory of devices Check closed areas of the building as well when doing all tests.

Fire Extinguisher Dating (EC.02.03.05 cont.) Month, day, year and initials of inspector required per NFPA 10-1998 They will review the tag If bar coded, they will review documentation Required monthly Check closed areas of the building as well when doing all tests. – this means every 30 days!!!! Not during the month *** jkc check!!!

Fire Protection Equipment (EC.02.03.05 – 42%) Hospital inspects, tests & maintains fire safety equipment. Includes testing of: fire alarms boxes, smoke detectors, sprinklers, portable extinguishers, magnetic release devices, tamper switches & water flow devices. If outsourced to a vendor keep the report, read the report and act on problems! Make sure reports are tied to an inventory of devices Check closed areas of the building as well when doing all tests.

Medical Gas (EC.02.05.09 – 20%) Hospital inspects, tests & maintains medical gas and vacuum systems. Get vendor reports, fix problems noted Gas shut off valves must be labeled with rooms they shut off. Staff must know who can shut these off and when. Alarms must be working. Has led to ITL

Provide/Maintain Fire Systems and Equip (LS.02.01.35 33%) Sprinklers 18 inch rule Sprinkler pipes can not support other items like cables or wires Sprinkler head clean and free of obstruction, collar flush

Medical Gas (EC.02.05.09 – 20%) No parking zone! Get vendor reports, fix problems Gas shut off valves must be labeled with rooms they shut off. Staff know who can shut these off Alarms must be working. Led to ITL Test & inspect & maintain medical gas and vacuum per policy

Safe, Functional Environment (EC.02.06.01 – 20%) Areas scored here: furnishing and equipment are in good repair, the environment meets needs of patient. Ripped mattresses, cracked ceiling tile, mold, broken wheel chair In behavioral health units do environmental risk assessment for suicide risks. Either fix or implement other safety interventions such as increase monitoring. Document and keep your risk assessment. ( or scored at EC.01.01.01)

Safety and Security (EC.02.01.01 – 15%) Hospital manages safety and security risks Complete risk assessments on areas of potential risk Scored in sensitive areas such as Labor and Delivery, Pediatrics Trace your own policies, do staff stop you or surveyor when they enter area? See unsecured O2 scored here JKC

Strategies for Success Preparing Clinical Areas Rollout the Clinical Area Checklists Email them out, assign, implement, collect them back, analyze compliance Involve/educate clinical & frontline staff Everyone knows who to call to get fixed Identify areas to improve, fix it, then reassess Make LS an every day expectation!

Strategies for Success Do Mock Surveys Conduct mock tracers in clinical areas Do EOC System Tracer during your Mock survey Use the documentation checklist “show me where this is documented” Look for missing dates, think medication refrigerators when doing this!

Strategies for Success Review your eSOC quarterly for updates, completion of projects Validate that ILSM evaluations exist on paper for each PFI on the eSOC Work with facilities staff and learn the language

Strategies for Success Make use of the PPR to document compliance Record the name and location of each report that documents compliance Helps during on-site survey! When in doubt, get clarity from SIG

Survey Process Preparation Before your next survey prepare for and/or practice the following: Day one documents – surveyor planning session Environment of Care system tracer Document Review session * Emergency Management system tracer LSC building tour * Tools and check lists for the document review session and check list for the building tour are in your packet and will be described at the end

Now That You Know… fix it Options for managing self identified deficiencies in LS.02.xx.xx – LS.04.xx.xx Correct it immediately Fix in 45 days in corrective maintenance – document it. If it takes >45 days, create a Plan for Improvement (PFI) in your e-SOC Consider equivalency request to TJC waiting until they announce how the data will be used will be too late.  You will have a tail wind of 12 or months of outliers you will have to live with. Overview: When an [organization] finds that it is out of compliance with Standards LS.02.01.10 – LS.04.02.05 the hospital either resolves the deficiencies immediately or manages it through one of the following options:␣ A maintenance management process that documents the deficiency and corrective resolution within 45 days␣ A Plan For Improvement derived from the Statement of ConditionsTM␣ A Life Safety Code Equivalency approved by The Joint Commission

Validate ID on the extranet Institute your calling tree Managing the Onsite Survey … GOOD MORNING, WE ARE HERE FROM THE JOINT COMMISSION Validate ID on the extranet Institute your calling tree Everyone or their back up initiates the pre-planned action. Rooms are freed up, Documents are rolled in, opening conference starts. Optional information shows great things only

Institute the Action Plan Everyone in Position

Please visit and bookmark www.pattonhc.com QUESTIONS? JenCowel@PattonHC.com Please visit and bookmark www.pattonhc.com