Applications of Money-Time Relationships

Slides:



Advertisements
Similar presentations
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Advertisements

26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Capital Budgeting Net Present Value Rule Payback Period Rule
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Chapter 10 - Capital Budgeting
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Chapter 17 Investment Analysis
Chapter 5: Evaluating a Single Project
Comparison Methods Part 2. Copyright © 2006 Pearson Education Canada Inc Introduction Chapter 4 introduced the Present Worth and Annual Worth.
TM 661 Engineering Economics for Managers
Lecture 4 Rates of Return. Summary of comparison methods we know so far: Present worth Future worth Annual worth Still to come: Rate of return Cost/benefit.
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
FIN 40153: Advanced Corporate Finance EVALUATING AN INVESTMENT OPPORTUNITY (BASED ON RWJ CHAPTER 5)
Capital Budgeting Investment Rules
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
Fin 351: lectures 3-4 Time Value of Money Present value of future cash flows or payments.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
Chapter 10 - Cash Flows and Other Topics in Capital Budgeting.
FINAL EXAM REVIEW Spring Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present.
AEC 422 Fall 2014 Unit 2 Financial Decision Making.
Intro to Engineering Economy
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Rate of Return Analysis: Multiple Alternatives Consider the following: You have $20,000 to invest in either alternative A or alternative B. Your MARR is.
Investment Decisions and Capital Budgeting
Multi-Period Analysis Present Value Mathematics. Real Estate Values Set by Cash Flows at different points in time. Single period Analysis revisited 
Finance 2009 Spring Chapter 4 Discounted Cash Flow Valuation.
Comparing Projects Using Time Value of Money
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Analysis of Engineering Business Decisions
Class 3 Investment Decisions and Capital Budgeting.
The Capital Budgeting Decision Chapter 12. Chapter 12 - Outline What is Capital Budgeting? 3 Methods of Evaluating Investment Proposals Payback IRR NPV.
1 Capital-BudgetingTechniques Chapter 9. 2 Capital Budgeting Concepts  Capital Budgeting involves evaluation of (and decision about) projects. Which.
Evaluating a Single Project
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
Chapter 8 Long-Term (Capital Investment) Decisions.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Net Present Value and Other Investment Criteria By : Else Fernanda, SE.Ak., M.Sc. ICFI.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Discounted Cash Flow Valuation Chapter Six.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
8-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 8 Rate of Return Multiple Alternatives © 2012 by.
Chapter 6: Comparison and Selection Among Alternatives
Chapter 5: Evaluating a Single Project
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Chapter 6: Comparison and Selection Among Alternatives
Chapter 5: Evaluating a Single Project
Chapter 6: Comparison and Selection Among Alternatives
Capital Budgeting Techniques FHU3213
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Chapter 6: Comparison and Selection Among Alternatives
Chapter 5: Evaluating a Single Project
Capital-Budgeting Techniques.
Chapter 5: Evaluating a Single Project
Chapter 6: Comparison and Selection Among Alternatives
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Chapter 6: Comparison and Selection Among Alternatives
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Presentation transcript:

Applications of Money-Time Relationships And Methods For Evaluating Investments

Overview Minimum Acceptable Rate of Return (MARR) Two kinds of choice problems: Choose ALL the profitable projects? Choose ONE most profitable project from many alternatives (mutually exclusive alternatives)? Methods for comparing mutually exclusive alternatives You actually already know these methods. They are just renamed slightly. PW Present Worth uses PV present value (also called NPV or Net Present Value) AW Annual Worth uses AV annuity value FW Future Worth uses FV future value In each method, the MARR should be used as i% Rates of Return Calculating IRR (Internal Rate of Return) The IRR is the i% where PV=0. Calculating ERR (External Rate of Return) A bit more complicated. Covered after IRR. Direct use of IRR and ERR do not allow comparison of mutually exclusive alternatives The  method for comparing mutually exclusive alternatives

Tunnel Construction Example ($ figures in million hk$)

Tunnel Construction Example We are going to consider two problems A. Choose all profitable projects. B. Choose most profitable project. We will assume MARR = 6%

Choose all the profitable projects Several equivalent ways to identify all the profitable projects. Given a MARR% requirement, Find all projects where IRR > MARR% OR Find all projects where PW>0 at i%=MARR% Find all projects where AW>0 at i%=MARR% (assumes repeatability)

Choose most profitable project Constraints besides money (management time, difficult to obtain resources or equipment, land) may mean that not all projects can be funded. Most profitable means the highest $ amount. Find project with highest PW (or AW) given i%=MARR%. Important: Do not compare IRR%. IRR% can be misleading. Seek the highest $ amount, not the highest % return.

Tunnel life cycle The company builds the tunnel. We will treat this as a year 0 cost. The company operates the tunnel for L years, and receives an annual revenue from vehicle tolls. There is also an annual cost for salaries, repair, etc. After a useful life L years, the company sells the tunnel for a “salvage value” $S

Let’s look at the raw data again We have the annual cost but not the annual revenue. We are going to need to know the annual revenue. Annual revenue = Fare x Yearly Traffic. Is yearly traffic = Daily Traffic x 365? (no! the planners tells us it is less, they guess x325)

Now we have revenue, but need a way to evaluate the projects In the next slide, we’ll choose the PW (present worth) method and see how to apply it to the problem.

Present worth method Although the tunnel project is simple, drawing a cash flow diagram cam help to avoid mistakes. Initial Cost C0 Year 1 Year L Salvage Value $S Cash flow of $A/year for L years, Where $A = Annual Revenue – Annual O&M Cost Find $PW?

Present worth calculation Initial Cost C0 Year 1 Year L Salvage Value $S Cash flow of $A/year for L years, Where $A = Annual Revenue – Annual O&M Cost Find $PW? PW = -C0 + A * (P/A,i%,L) + S * (P/F,i%,L)

Organizing the data Arrange items according to life cycle (initial cost, annual O&M, salvage) Calculate PW of each class of items Add the PWs to get the total PW for each project

Organizing the data: 1 Arrange Life cycle: Initial costs, then annual costs, then salvage

Organizing the data: 2 calculate each PW Each PW is calculated with the standard formula. The initial cost is Year 0 and is thus a PW. The other costs need a conversion factor.

Organizing the data: 3 Add

Conclusions from PW analysis The Sha Tin, and 2 Lantau projects are profitable because PW > 0 at MARR=6%. Of the profitable projects, the Sha Tin project is the MOST profitable. It produces the highest Present Worth. The Tsuen Wan project is not profitable at MARR=6%

Rates of Return The IRR is the most common rate of return The IRR is the i% where Present Worth = 0 It is usually algebraically difficult to solve for IRR%, so Use a spreadsheet and improved guesses to solve Or use a graph

Spreadsheet method for IRR% Double click the spreadsheet, then play with i% until PW=0 for each project. The results are the Rates of Return IRR%.

IRR% results All except Tsuen Wan are above the 6% MARR. A project is profitable when IRR>MARR But the highest IRR% may not give the highest PW.

Some problems with IRR Does not allow comparison of projects Why not? Compare Can be ‘patched up’ with delta method. Easy to define, but Difficult to calculate Trial and error, graphing, Newton’s method To solve f(I)=0, use I**=I*-(f(I)/f’(I)) Assumes project revenues are reinvested at IRR%, which can be unrealistic if IRR% is very high.

We need a volunteer The volunteer needs to have $100 in notes and $1 in coins. There is no chance of losing money.

We need a volunteer Investment A costs $1 and earns a 100% rate of return during this class. Investment B costs $100 and earns a 20% rate of return during this class. Choose which investment you prefer

Of course $1 x 100% = $1 profit $100 x 20% = $20 profit The lower IRR% may give a higher profit, if the required dollar investment is higher.

Delta method Choose the highest IRR investment, in this case A. Then look at cash flow Investment A -$1, then +$2 Investment B -$100, then +$120 Delta = (B-A) has cash flows of -$99, then + $118 The IRR of Delta is about 20%. If 20% is over your MARR, then you should spend the extra money (the $99) to go from investment A to investment B. You will then earn $19 more profit.

Other IRR complaints Too hard to calculate Unrealistic when high ERR, or external rate of return, tries to solve these problems. It does NOT solve the project comparison problem.

ERR External Rate of Return Procedure - Project life is L years. Determine which periods (years, months) have net revenue and which periods have net costs Find FV (future value) of all net revenues, at MARR% Find PV (present value) of all net costs, at MARR% Find the E% that solves (FV of Revenues) = (PV of costs) * (P/F,E%,L) Or E% ={ [(FV of Rev)/(PV of Costs)](1/L)-1}

Odds and Ends MARR – where does it come from? Annual worth method often worthwhile when projects repeat

MARR The MARR is usually given to you in textbook problems. In real life, where does it come from? Usually upper management decision, involving: Rates of interest on borrowed money Supply and demand for money in the company Expectations of investors Return on companies stock Return on stock index for the industry Project Risk (though adjusting MARR upwards for risk can be a bad move – since it weights present results over future)

Next Week: Annual Worth method Useful for projects that repeat or when an annual value is desired for comparison to other projects with annual values. [Our tunnel comparisons did not repeat – the company planned to sell the tunnel] Main technical step is the annual capital recovery (CR) amount. Annual CR = (Initial Cost) (A/P,i%,L) – (Salvage Value) (A/F,i%,L)

Summary To find the most profitable project or investment: compare PW (or sometimes AW) using i%=MARR% Do not compare IRR of projects; misleading To find all the profitable projects or investments: All of these methods produce equivalent answers Compare IRR to MARR Compare ERR to MARR Look for positive PW, using i%=MARR% Look for positive AW, using i%=MARR%