Managing Capacity.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
Job Order Costing Chapter 4.
Multicriteria Decision-Making Models
Part 3 Probabilistic Decision Models
Cost Behavior, Operating Leverage, and Profitability Analysis
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
Create an Application Title 1Y - Youth Chapter 5.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
The 5S numbers game..
Decision Making and Relevant Information
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
EE, NCKU Tien-Hao Chang (Darby Chang)
Introduction to Cost Behavior and Cost-Volume Relationships
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Target Costing and Cost Analysis for Pricing Decisions
Briana B. Morrison Adapted from William Collins
Cost-Volume-Profit Relationships
MCQ Chapter 07.
1 of 59 PART III The Core of Macroeconomic Theory © 2012 Pearson Education, Inc. Publishing as Prentice Hall CHAPTER OUTLINE 11 Aggregate Demand in the.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
PRODUCTION AND OPERATIONS MANAGEMENT
Managing Capacity Chapter 8
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Capacity and Constraint Management
Capacity and Constraint Management
Chapter 5 Capacity Planning For Products and Services
Managing Capacity Chapter 6.
Strategic Capacity Planning for Products and Services
1 2 Teeth and Function 3 Tooth structure 4 Dental Problems.
Regression with Panel Data
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Biology 2 Plant Kingdom Identification Test Review.
Chapter 1: Expressions, Equations, & Inequalities
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
Before Between After.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
Subtraction: Adding UP
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Determining How Costs Behave Chapter 10.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 A Monetary Intertemporal Model: Money, Prices, and Monetary Policy.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Fundamentals of Cost Analysis for Decision Making
Clock will move after 1 minute
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
A Real Intertemporal Model with Investment
Product Costing in Service and Manufacturing Entities
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Physics for Scientists & Engineers, 3rd Edition
Queuing Analysis Chapter 13.
Select a time to count down from the clock above
9. Two Functions of Two Random Variables
1 DIGITAL INTERACTIVE MEDIA Wednesday, October 28, 2009.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Quiz Number 2 Group 1 – North of Newark Thamer AbuDiak Reynald Benoit Jose Lopez Rosele Lynn Dave Neal Deyanira Pena Professor Kenneth D. Lawerence New.
©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 1 Capacity Decisions Defining.
Chapter 6 Managing Capacity
Managing Capacity. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 2 Capacity.
Presentation transcript:

Managing Capacity

Chapter Objectives Be able to: Explain what capacity is, how firms measure capacity, and the difference between theoretical and rated capacity, Describe the pros and cons associated with three different capacity strategies: lead, lag, and match. Apply a wide variety of analytical tools to capacity decisions, including expected value and break-even analysis, decision trees, waiting line theory, and learning curves. © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Capacity Decisions Defining and measuring capacity Strategic versus tactical capacity Evaluating capacity alternatives Advanced perspectives Theory of Constraints Waiting lines Learning curves © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Defining and Measuring Capacity Measure of an organization’s ability to provide goods or services Jiffy Lube  Oil changes per hour Law firm  Billable hours College  Student hours per semester © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Consider: Capacity for a PC Assembly Plant: Controllable Factors (800 units/shift/line)×(% Good)×(# of lines)×(# of Shifts) Controllable Factors 1 or 2 shifts? 2 or 3 lines? Employee training? Uncontrollable Factors Supplier problems? 98% or 100% good? Late or on time? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Strategic versus Tactical Capacity One or more years out “Bricks & Mortar” Future technologies Tactical: One year or sooner Workforce level, schedules, inventory, etc. © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Capacity versus Time Capacity Time Days or weeks out Months out Planning & Control Limited ability to adjust capacity Detailed planning Lowest risk Tactical Planning Workforce, inventory, subcontracting decisions Intermediate-level planning Moderate risk Strategic Capacity Planning “Bricks & mortar” decisions High-level planning High risk Capacity Time Days or weeks out Months out Years out © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Capacity Strategies: When, How Much, and How? Demand Leader Excess Capacity Lost Business Laggard © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

How? Make or Buy (e.g., subcontracting) One extreme: “Virtual” Business Walden Paddlers (Marketing) Hardigg Industries (Manufacturing) Independent Dealers (Direct Sales) General Composites (Design) © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Evaluating Capacity Alternatives Economies of scale (EOS) Expected value analysis (EVA) Decision Trees Break-even points (BEP) © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Economies of Scale Total Cost for Fictional Line: Fixed cost + (Variable unit cost)×(X) = $200,000 + $4X Cost per unit for X=1? X=10,000? X = 1: $200,004 X= 10,000: $24 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Fixed & Unit Cost Scenarios Page 214 in text. Common Carrier: Fixed cost = 0, unit cost = $750 Contract Carrier: Fixed cost = $5,000, unit cost = $300 Private Carrier: Fixed cost = $21,000, unit cost = $50 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Indifference Point Compares capacity alternatives — at what volume level do they cost the same? Suppose one option has zero fixed cost and $750 per unit cost; the other option has $5,000 fixed cost, but only $300 per unit cost. $0 + $750X = $5,000 + $300X What is the volume, X, at the indifference point? X = 11.11 or about 11 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Expected Value Analysis Forecasted demand or volume is uncertain, allows consideration of the variability in the data

Capacity cost structure Data Requirements Capacity cost structure (alternatives?) Expected demand (multiple scenarios?) EVA Product and service requirements (e.g. time standards) © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Expected Value Analysis Pennington Cabinet Company 2000 jobs per year (20% likelihood) 5000 jobs per year (50%) 7000 jobs per year (30%) Each job = $1,200 revenue © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

We Know: Average job requires: 2 hours of machine time 3-1/3 hours of assembly team time Machines and teams work 2000 hours per year Each machine and team has yearly fixed cost = $200K 3 different capacity scenarios (see next slide!) © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Number of Machines and Teams Number of Hours Available Each Year Effective Capacity   Number of Machines and Teams Number of Hours Available Each Year Maximum Jobs per Year Machines Teams Current 3 5 6,000 10,000 3,000 Expanded 9 18,000 5,000 5,400 New Site 7 12 14,000 24,000 7,000 7,200 Effective capacity is limited by machine capacity What is the effective capacity of each capacity alternative? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Alternate Demand Scenarios Current Level Expanded New Site Demand Revenue Fixed Expenses 2,000 $2,400,000 $1,600,000 $2,800,000 $3,800,000 5,000 $3,600,000 $6,000,000 7,000 $8,400,000 What is the expected contribution if demand = 5000 AND we decide to move to a new site? Why does revenue for current capacity max out at $3.6 million? $2,200,000 Cannot handle a demand greater than 3,000 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Net Revenue Table Demand Current Expanded New Site 3,000 $800,000 ($400,000) ($1,400,000) 5,000 $2,000,000 $3,200,000 $2,200,000 7,000 $4,600,000 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Expected Value of Each Capacity Alternative: Current capacity level (20%) × $800K +(50%) × $2000K +(30%) × $2000K = $1,760,000 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Expected Value of Each Capacity Alternative: Expanded capacity level (20%) × – $400K + (50%) × $3200K + (30%) × $3200K = $2,480,000 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Expected Value of Each Capacity Alternative: New Site capacity level (20%) × – $1400K + (50%) × $2200K + (30%) × $4600K = $2,200,000 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Conclusions for Pennington Which alternative would you choose if you wanted to minimize the worst possible outcome (Maximin)? Maximize the best possible outcome (Maximax)? Why is it important to know effective capacity? How could this help future capacity decisions? Maximin: Current site at $800,000 Maximax: New site at $4,600,000 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Visual tool for evaluating choices using expected value analysis Decision Trees Visual tool for evaluating choices using expected value analysis Allows use of different outcomes and different probabilities of success for each

Decision Tree Requirements Decision points represented by Choose the best input — the highest EVA, lowest cost, least risk, etc. Outcome points represented by Summation of all inputs (outcomes) weighted by their respective probabilities. No choice can be made at these points Trees drawn from final decision to the outcomes affecting that decision, then on to lower level decisions that might affect the those outcomes, then the lower level outcomes affecting those lower level decisions, and so on © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Ellison Seafood Example Here the probabilities affecting the demand level are the same for the three options considered. But the decision tree does allow them to be different, can you think of situations where this might be true? Refer students to the text, Example 8.3, Figures 8.4 and 8.5, for this discussion Different probabilities because of location differences, market size differences, product mix differences, technology differences, etc. © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Decision Tree Criteria Book example illustrates selecting highest revenue option. Other option choices can be on basis of: Using total cost for outcomes (useful when selling price is not known) Using estimated risk for outcomes Outcomes reflecting a desired result (choose highest EVA) Can you think of an example? Outcomes reflecting undesirable results (choose lowest EVA) Can you think of an example? Desirable examples: Market share, potential market size, product volume times price, projected reliability, project completion time… Undesirable examples: yield loss, projected failure rate, holding costs, quality costs, time-to-market, etc. © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Break-Even Point (BEP) Considers revenue and costs, at what volume level are they equal? Suppose each unit sells for $100, the fixed cost is $200,000 and the variable cost is $4 BEP  $100X = $200,000 + $4X What is the breakeven volume, X? BEP: X = 2,084 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Self Test EBB Industries must decide whether to invest in a new machine which has a yearly fixed cost of $40,000 and a variable cost of $50 per unit. What is the break even point (BEP) if each unit sells for $200? What is the expected value, given the following demand probabilities: 250 units (25%), 300 units (50%), 350 units (25%) BEP at ($200 - $50)X = $40,000, that is, X = 266.667 = 267 Net for 250 units = <$2,500> Net for 300 units = $5,000 Net for 350 units = $12,500 EMV = 0.25 x (-$2,500) + 0.5 x $5,000 + 0.25 x $12,500 = $5,000 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Advanced Perspectives Theory of Constraints Waiting lines Learning curves

Theory of Constraints Concept that the throughput of a supply chain is limited (constrained) by the process step with the lowest capacity. Sounds logical, but what does this mean for managing the other process steps?

Theory of Constraints Pipeline analogy Which piece of the pipe is restricting the flow? Would making parts A or D bigger help? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Dealing with a Constraint Identify the constraint Exploit the constraint Keep it busy! Subordinate everything to the constraint Make supporting it the overall priority Elevate the constraint Try to increase its capacity — more hours, screen out defective parts from previous step, … Find the new constraint and repeat As one step is removed as a constraint, a new one will emerge. Which piece of the pipe on the previous slide would be the new constraint if Part C was increased in diameter? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Waiting Lines Waiting lines and services Waiting Line Theory Waiting and customer satisfaction Factors affecting satisfaction Waiting Line Theory Terminology and assumptions Illustrative example © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Waiting at Outback Steakhouse... Waiting outside or in bar Waiting to get food... Leaving restaurant Waiting to pay bill ... © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Key Points Waiting time DECREASES value-added experience On the other hand, adding serving capacity INCREASES costs Businesses must have a way to analyze the impact of capacity decisions in environments where waiting occurs © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Waiting and Customer Satisfaction Cost of service Cost of waiting Lost customers COST Waiting time © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Cost of Waiting = f(Satisfaction) Factors Affecting Satisfaction Firm-related factors Customer-related factors © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Firm-Related Factors “Unfair” versus “fair” waits Uncomfortable versus comfortable waits Initial versus subsequent waits Capacity decisions © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Waiting Line (Queuing) Theory Application of statistics to allow us to perform a detailed analysis of system Utilization levels, line lengths, etc. Terminology and assumptions © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Terminology and Assumptions I © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Terminology and Assumptions II Single-Channel Single-Phase Multiple-Channel Single-Phase © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Terminology and Assumptions III Complex service environment ... How would you describe this? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Terminology and Assumptions IV Population: Infinite or Finite Arrival rates: Random or constant rate Random rates typically defined by Poisson distribution for infinite population Service Rates: Random or constant Random service rates typically described by exponential distribution Priority rules (aka “Queue Discipline”) Permissible queue length © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Example A single drive-in window for Bank Arrival rate Service rate 15 per hour, on average Service rate 20 per hour, on average How many channels? Phases? What kinds of questions might we have? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

 = arrival rate = 15 cars per hour Drive-In Bank  = arrival rate = 15 cars per hour  = service rate = 20 cars per hour Average utilization of the system:  =  = 0.75 © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Drive-In Bank Probability of n arrivals during period T is: e.g., probability of only 4 arrivals during a 45-minute period is: Note: Discuss with students about need to keep time references to the same period. Here, since l is in cars per hour, 45 minutes must be converted to 0.75 hours. © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Drive-In Bank Average number of cars in the system: (waiting plus being served) © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Drive-In Bank Average number of cars waiting: © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Drive-In Bank Average time spent in the system: (waiting plus being served) (How do we know the answer is in hours?) © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Drive-In Bank Average time spent in the line: (How do we know the answer is in hours?) © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Suppose l is now 19 cars per hour Question? What happens as the arrival rate approaches the service rate? Suppose l is now 19 cars per hour

One Answer: Average number of cars waiting: Implications? What are we assuming here? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Other Types of Systems (Discussed in the supplement to Chapter 8) Single-channel, single-phase with constant service time Example: Automatic car wash Multiple-channel, multiple-phase (hospital) Usually best handled using simulation analysis © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Self Test I Look back at the drive-in window example. How can we have an average line length > 1 while the average number of cars being served is < 1? Similarly, what happens as the arrival rate approaches the service rate? Suppose the teller at the drive-in window is given training and can now handle 25 cars an hour (a 25% increase in service rate). What happens to the average length of the line? Length of the line for a service rate of 25 cars per hour is 225/[25(25-15)] =0.9 cars, a decrease from 2.25 cars © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Self Test II Look back at the Outback Steakhouse example. What kind of queuing system is it? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Question? How can capacity change, even when we do not hire new people or put in new equipment?

Learning Curves Recognize that people (and often equipment) become more productive over time due to learning. First observed in aircraft production during World War II Getting more emphasis as companies outsource more activities © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

A Formal Definition 80% learning curve - For every doubling of cumulative output, there will be a set percentage improvement in time per unit or some other measure of input 1 2 4 8 16 Output Time per unit 10 hrs. 8 hrs. 6.4 hrs. 5.12 hrs. 4.096 hrs. 80% learning curve - Where does the name come from? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

A Formal Definition (cont’d) Where: Tn = time for the nth unit T1 = time for the first unit b = ln(learning percent) / ln2 Explain to students that ln represents the natural logarithm © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Example Reservation clerk at Delta Airlines First call (while training) takes 8 minutes Second call takes 6 minutes What is the learning rate? How long would you expect the 4th call to take? The 16th? The 32nd? Learning rate = 6min/8min = 75% Using Table 8.6 in textbook: Learning rate = 6/8 = 75% 4th call is 0.563 x 8 min = 4.504 minutes 16th call is 0.316 x 8 min = 2.528 minutes 32nd call is 0.237 x 8 min = 1.896 min or 0.75 of 16th call time = 2.528 x 0.75 = 1.896 min © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Key Points Quick improvements early on, followed by more and more gradual improvements The lower the percentage, the steeper the learning curve Practically speaking, there is a floor Estimates of effective capacity must consider learning effects! © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

How could learning curves be used in long-term purchasing contracts? Another Question . . . How could learning curves be used in long-term purchasing contracts?

Johnston Controls I Johnston Controls won a contract to produce 2 prototype units for a new type of computer. First unit took 5,000 hrs. to produce and $250K of materials Second unit took 3,500 hrs. to produce and $200K of materials Labor costs are $30/hour © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Johnston Controls II The customer has asked Johnston Controls to prepare a bid for an additional 10 units. What are Johnston’s expected costs? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Johnston Controls III Labor learning rate: 3500 hours / 5000 hours = 70% Materials learning rate: $200K / $250K = 80% © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Johnston Controls IV “Additional 10 units” means the third through twelfth units. Total labor for units 3 through 12: = 5,000 hours × (5.501 – 1.7) = 19,005 hrs 5.501 is sum of nb for 12 units 1.7 is the sum of nb for the first two units Refer to Table 8.6 in textbook for 70% learning curve data © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Johnston Controls V Total material for units 3 through 12: = $250,000 × (7.227 – 1.8) = $1,356,750 Refer to Table 8.6 in textbook for 80% learning curve data © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Johnston Controls VI Total cost for “additional 10 units”: = $30 × (19,005 hours) + $1,356,750 = $1,926,900 What if there is a significant delay before the second contract? © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Self-Test Assume that there WILL BE a significant delay before Johnston Controls makes the next 10 units. Assuming that Johnston has to “start over” with regard to learning, estimate total cost for these additional 10 units. Assume same learning curve percentages, but start anew. Hence, using sum of nb for first 10 units, hours will be 5,000 x 4.932 = 24,660 and hours cost will be $30 x 24,660 = $739,800 Materials cost will be $250,000 x 6.315 = $1,578,750 Total cost will $2,318,550 compared to cost of $1,926,200 if we order right away, a savings of $392,350! © 2008 Pearson Prentice Hall --- Introduction to Operations and Supply Chain Management, 2/e --- Bozarth and Handfield, ISBN: 0131791036

Case Study in Managing Capacity Forster’s Market