________________________________________________________________ What price do you put on pump run rate and production efficiency on your horizontal wells?

Slides:



Advertisements
Similar presentations
QUICK QUIZ 14.1 (end of section 14.2)
Advertisements

________________________________________________________________
TexChem Group International LLC
A force applied over a surface is pressure.
Scotch Marine Boiler Design
Service Delivery 3 Pumps.
V-backed stainless steel screen pump intakes: The following Evolution Oil Tools inc product is a screen assembly to prevent large solids from entering.
Edit this text for your title
Heat Exchangers Design Considerations. Heat Exchangers Key Concepts Heat Transfer Coefficients Naming Shell and Tube Exchangers Safety In Design of Exchangers.
CO2 CascadeComp_Studi Galileo  1 Semi-Hermetic Compressors for CO 2 Cascade Systems Hermann Renz Bitzer Kuehlmaschinenbau GmbH  Germany.
Environmental Drilling By: Josh Humphreys October 8,2006.
Basic Refrigeration Cycle
Blitzfire Deck Gun Ground Monitor
Evolution Oil Tools Inc. (EOT) was formed in January of 2011 Headquarters in Calgary, Alberta, Canada Manufacturing, Assembly and Testing shops are in.
Experiment 8 : Minor Losses
Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
AIR FLOW IN DUCTS Shaharin Anwar Sulaiman
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Hydraulics.
INFLATABLE DST EQUIPMENT
Adaptive Product Technology for Coalbed Natural Gas (CBM)
Fluid Mechanics 06. Energy, Work and Power Work:- Work is force acting through a distance when the force is parallel to the direction of motion. Energy:-
Hydraulic Drives and Actuators. Description A hydraulic drive consists of three major parts: The generator (such as a hydraulic pump) driven by an electric.
Pumps for Slurry © 2012 Dr. B. C. Paul Note – These slide illustrate a solution approach using Sysel, a program developed by GIW and contain screen shots.
SECTION 1 MONEY Produce a mind-map on the topics covered so far Some key elements - Financial Capability (centre point) - Personal Lifecycle - Needs &
Reciprocating Electric Submersible Pump (RESP)
Drilling Engineering – PE311 Rotary System
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Oil Pressure Problems What to look for.
Gas Transportation through Pipelines
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydraulics For The Long Term
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems
Assignment No. 1 [Grup 8] Figure below shows a portion of a hydraulic circuit. The pressure point B must be 200 psig when the volume flow rate is 60 gal/min.
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
Day 1 Please get a computer up and running. Launch molecular workbench Objectives: –Explain the difference between heat and temperature –Explain the three.
Batch Pumping – A New Method to Solve Downhole Liquid Holdup Bill Elmer 2005 Beam Pumping Workshop.
HVAC523 Circulator Pumps.
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
SIZING PNEUMATIC SYSTEMS. Introduction Pneumatic systems are sized to meet output power requirements. The air distribution system is sized to carry the.
Introduction to Vibrations and Waves
Artificial Lift Systems
Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Project-2 Investigation of Artificial Lift Techniques in Horizontal Gas.
SAMPLE SLIDES OF THE 2-DAY SEMINAR FOR ENGINEERS As you will notice there are few words on these slides, your trainer will provide you with his experience.
How to Maintain High Producing Efficiency in Sucker Rod Lift Operations Lynn Rowlan.
 On average, home heating uses more energy than any other system in a home  About 45% of total energy use  More than half of homes use natural gas.
Valves In Industry (Part 3)
Petroleum Engineering 406 Floating Drilling
HVACR116 – Trade Skills Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Urban Storm Drain Design: Laterals. Sizes Laterals carry water from inlets into junction boxes, where it leaves by a trunk line. The HGL of laterals can.
AIR FLOW IN DUCTS Shaharin Anwar Sulaiman
OILGEAR PVV PUMPS PVV 200 Performance Curves.
ARTIFICIAL LIFT METHODS
REDA Production Systems
Production Engineering II
Valves.
DESIGN OF SHELL AND TUBE HEAT EXCHANGER
Natural Gas Processing I Chapter 2 In-feed System
Copyright SwissFlow B.V.
Artificial Lift System And Sucker Rod Pumps
New Oil and Gas Drilling and Production Technologies
Shell Exploration & Production
Mechanical Separation
Mohr Separations Research, Inc.
PO 2430 Applied Fluid MEchanics
Air-conditioner -IDU Air-conditioner 2D Simplified model for Analysis.
________________________________________________________________
Presentation transcript:

________________________________________________________________ What price do you put on pump run rate and production efficiency on your horizontal wells? We were burning out pumps about every second day, due to the Gas Separators getting clogged up, at a rig time and pump cost of about $20,000 - $25,000 each time! After we installed the Eccentric Intake on those same wells, we were getting about 6 months without rig expense, replacing parts and down time and even then the production string was pulled for other reasons, not due to gas separator clogging. We have had this product in over a dozen of our slant wells for 2 years now with great success! Completion Supervisor Bonnyville, Alberta The Eccentric Intake from Evolution Oil Tools can save you $ and increase production! Eccentric Intake

________________________________________________________________ Low pressure horizontal wells High pressure horizontal wells PC systems laying at a high degree of deviation Sucker Rod Pumps laying at a high degree of deviation Horizontal wells with 2 phase gas flow Applications: Key Considerations: Regular slots are 1 slots positioned in a fashion to maintain structural integrity of the outer housing in order to set anchors and no-turn tools below the separator Sand slots are not shown in illustrations but are a 3 slot that runs the length of the inlet portion of the weight bar. The outer housing is built out of a hardened tube to maintain structural integrity. Increasing the length of the tool increases the intake inlet to accommodate higher rates or higher viscosities. Solids like to settle at point of fluid direction change. Sand slot tools are designed to minimize changes in fluid direction. The sand slots have a lessened performance in low viscosity application due to the open cross sectional area which can allow gas to follow the fluid around to the inlet side. The BFI intake is not a separator and will not separate gas entrained in solution or foam. Its sole purpose is to allow the inlet of the pump to drop to the fluid phase flow. Eccentric Intake

________________________________________________________________ Q - What is the most common of the 4 & 6 models and why? A - People typically use the 6ft model as provides less flow restrictions in higher viscosity locations. The price difference is minimal, therefore bigger is always better. Q - Which are the differences between the Sand Style & the Regular Style? A - One has smaller side slots in the outer cage. Sand falls out at a velocity change or fluid direction change, so we added larger slots to eliminate any flow path disruption. Q - Does the Sand Style have the same price as the Regular Style? A - Yes. Q - What kind is a typical delivery time for units? A – Delivery time is approximately 2 weeks unless it is a model in stock at a Evolution Oil Tools location. FAQs

________________________________________________________________ Q - What percentage of sand could the 4 & 6 models handle? A - That question is best answered by fluid velocity. If you have enough velocity through the tool than it can carry as high as 30% by volume, but if the velocity is not high enough then it will settle out wherever it can and eventually plug something. The intent of the sand version is not to enable produced sand, but to reduce potential equipment problems when installed in a sandy environment. Q - When would you choose the 4 over the 6 & vice versa? A - This really is determined by viscosity and volumes. As a rule, up to 30,000 cp and 200 M^3/d could use a 4 and anything over those numbers should use a 6 Q - Do you have a 4-1/2 diameter? A - We can build any size or configuration for your application and incorporate the eccentric portion of it. Q - Can this product be used with the Evolution Oil Tools Beam or PC Gas Separators? A – Yes, both. FAQs

________________________________________________________________ Q - What is the recommended landing angle for installation of these? A - Anywhere between 30° to 85° maximum (best results 72° - 78°). Q – Is there any other important information about this product? A - This tool is a great solution for horizontal ALS systems. However I want to be clear on where it is great. When running ALS in horizontal wells or around the bend at any deviation we can run into issues with performance on any piece of equipment. The purpose of this unit is strictly mechanical. It is used to separate free gas from fluid. It will not separate gas entrained in solution as there is not a moving mechanism or function to do so. In Horizontal sections we get two phase flow (gas on the high side and fluid at the bottom). The point is to allow the inlet of the system to always draw off the bottom, so it is in the fluid. This unit has not been able to maintain its efficiency in a system greater than 82 degrees in deviation. I would recommend that the landed angle be less than 82 degrees and make sure that there is a clear understanding that the product does not help in sand separation and knocking gas entrained in solution out of the fluid. FAQs