Design-Build: RISKS OR REWARDS for the Consulting Engineer?

Slides:



Advertisements
Similar presentations
Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Organization of Primary Entities
Lessons Learned: CM at Risk & Design Build
Project Procurement & Contract Administration Jiwei Ma
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Design/Build Solutions to your construction projects, large and small.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Subcontracting Construction Engineering 380. Subcontracts Owner doesn’t “recognize” subcontractors They are representatives of the contractor Prime usually.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
1 Basics of Government Contracting. Federal Procurement Background The U.S. Government is the world’s largest purchaser of goods and services 2.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
The HA will reinforce the commitment of stakeholders to delivering quality housing at two levels - (a) At the strategic level, we will draw up a Quality.
FIDIC 2005 Beijing Workshop 13 Design - Build Opportunities and Challenges in Australasia Tony Barry, President Association of Consulting Engineers Australia.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
The Art of QBS Qualifications-Based Selection (QBS): Procuring Intellectual Services the Smart Way Claude Paul Boivin, ACEC Canada Title #1.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Honoraria for Design Build Projects Methodology Assessment Matrix.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
P ROJECT D ELIVERY M ETHODS. EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents.
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
Project risk and control. Tender risk Programme and method – Tightness of completion LAD’s Extent of change – Construction method Temporary works Change.
Technical Manager; Bechtel Oil, Gas & Chemicals.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Advise | Design | Integrate | Deliver Subcontractor fee structure – FND Phase 1 Manchester 8 th June 2009.
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Construction “Meet & Greet” Tuesday, July 24, 2012 Purchasing / Facilities Management.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Alternate Project Delivery Systems for Governments.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Army Directorate of Public Works Support Contractor of the Year Building a government contractor for the 21 st century By Carlos Garcia Owner and CEO KIRA.
BIMILACI 2007 Best Practice Procurement of Engineering Services Washington, D.C. May , 2007 Gregs Thomopulos, P.E., FACEC Executive Committee Member,
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
Contractor Review and Prequalification
Light Rail Transit Project
Building a government contractor for the 21st century
Building a Government Contractor for the 21st Century
PROJECT DELIVERY METHODS
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
Joint Parking Task Force Update Procurement & Strategic Sourcing
CHANGING PROJECT DELIVERY SYSTEMS
تاكيد بر اجراي قراردادهاي EPC
Project Delivery Systems
Nepal administrative staff college
PROJECT DELIVERY METHODS
Design-Build Acquisition and Contract Incentives July 19, 2018
Design-Build Acquisition and Contract Incentives May 9, 2019
Delivering Successful Outcomes
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Design-Build: RISKS OR REWARDS for the Consulting Engineer?

Presented at the FIDIC Annual Conference September 7, 2005 Gregs G. Thomopulos, P.E., FACEC

“Many of the old rules for project delivery that held sway in the industry no longer have the same potency as they once did…

“Design-bid-build still has its many followers among owners who believe that they can obtain the very best design and the most cost-effective construction by holding both sides separate…

“ Advocates of design-build believe that the sole-source method of procurement forces the team to iron out many of the project wrinkles on their own because the entire team will be held accountable…

“Still others believe that construction management for fee is the best way of ensuring that the owner gets the best of all worlds because there is an agent inspecting, measuring, observing and protecting the owner’s interest…

“Fans of CM At-Risk believe that the words ‘at ‑ risk’ say it all and force the CM firm to deliver what it promised on time and on budget or face the consequences. ” Engineering News-Record, July 19, 2000

Design-Build is not a new concept. Most of the world’s great structures were built under a Design-Build arrangement by master builders.

Project Delivery Systems  Design-Bid-Build  Construction Management (CM) CM At-Risk CM – Owner’s Representative  Design-Build  Other Variations Build-Operate-Transfer (BOT) Build-Own-Operate-Transfer (BOOT) Program Management

OWNER Design-Bid-Build  Contractual Relationship CE CONTRACTORS

PROJECT START SELECT CE Design-Bid-Build  Project Time Line  Contractual Relationship CONSTRUCTION DESIGN PROJECT COMPLETION BIDDING/ AWARD

OWNER Construction Management At-Risk  Contractual Relationship CM / GC CE

SELECT CE PROJECT START SELECT CM/GC Construction Management At-Risk  Project Time Line  Contractual Relationship CONSTRUCTION DESIGN PROJECT COMPLETION PRE- CONSTRUCTION

OWNER Design-Build  Contractual Relationship DESIGN-BUILDER OWNER’S CE OR IN-HOUSE CE

Design-Build  Project Time Line  Contractual Relationship OWNER’S CE PROJECT START OR IN- HOUSE CONSTRUCTION SELECT DESIGN BUILDER PROJECT COMPLETION DESIGN PRE-CONSTRUCTION

Why Owners Prefer Design-Build  Shorter Project Schedule  Better Cost/Budget Management  Efficiency and Innovation (Contractors’ Means & Methods)  Single Source Responsibility (Avoids Pointing of Fingers)  Risk Sharing (More Risks Passed Down to Design-Builder)  Fewer Claims and Litigations  Fewer Contract Modifications  Opportunity to Package Larger Contracts

How Owners Procure Design-Build Services In the U.S.  Negotiated Procurement Sole Source Selection (Strategic Alliance) Qualifications Based Selection (QBS) Best Value (Price and Technical)  Competitive Procurement Low Bid (Lowest Price Technically Acceptable) Adjusted Low Bid (Mix of Price, Schedule, etc.) Fixed Budget/Best Technical Proposal Best and Final Offer Weighted Matrix

Organization of the Design-Build Team In the U.S.  Integrated Firm (Design and Construction Capability in Same Firm)  Contractor As Prime  CE As Prime  Joint Venture Between the Contractor and CE

“Owners are willing to use alternate project delivery methods but firms worry that clients don’t always understand what they need.” Engineering News-Record, June 19, 2000 Design-Build Risks and Rewards

Risks for the Consulting Engineer  Pre-Proposal Design Cost  Reduced Fee for Share of Profit  Errors and Omissions  Liquidated Damages or Consequential Damages  Performance Guarantee  Participation in Loss  Joint and Several Liability  Client Relationships

Rewards for the Consulting Engineer  Success Fee  Mark-Up on Procurement  Higher Margins on Design Services  Share in Overall Profit

Design-Build “Best Practices” for the CE in the Unites States

 For The CE, Subcontracting Tier Preferred (Some Are Sometimes the Prime)  No Free Pre-Bid Engineering Service  Success Fee on Successful Bids  Design Fees Should Include Additional Margins  Design Fees May Be Reduced for Share in Profits  No “Sharing in Loss” Arrangements  Procurement Services for Additional Fees  Possible Joint Venture With Contractor Best Practices For The Consulting Engineer in Design-Build

Future Market Trends  Transportation - More DOTs Are Following Utah DOT’s Lead  Sports/Recreation Projects  Power Generation and Transmission  Communications  Hotels/Resorts  Medical/Health Care  Commercial Buildings ?

Design-Build: RISKS OR REWARDS for the Consulting Engineer?

Risky Business Has Its Rewards

Thank You