Main Roads and USA Visit SOUTHBANK EDUCATION AND TRAINING PRECINCT 27 June 2008.

Slides:



Advertisements
Similar presentations
Greening Construction
Advertisements

PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30, 2007 PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30,
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Title Heading here Managing Customer Service Expectations Ashley May.
Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
Substantive Change Requesting Commission Approval of Substantive Changes at Institutions MSCHE Annual Meeting December 2009.
1 Setting Standards for Sustainability ASTM International Committee E60 Dru Meadows Chair, Committee E60 Founding Principal, theGreenTeam, Inc. Setting.
Joint ATS-WASC Accreditation Reviews Jerry McCarthy, ATS Teri Cannon, WASC.
Money Follows the Person (MFP) January 28, 2010 Presentation to Families USA 15th Annual Grassroots Meeting Carol Irvin Debra Lipson.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
STOCKPORT Within Greater Manchester Conurbation and 8 miles from Manchester City Centre 293,000 Population Mixed Health Needs Affluent areas to the South.
EDULINK II ACP-EU Co-operation Programme in Higher Education Call for proposals EuropeAid/132023/D/ACT/Multi General outlines Funded by the European Union.
1 Ignacio de Castro WIPO Arbitration and Mediation Center Solving Disputes: The Services of the WIPO Arbitration and Mediation Center WIPO-INSME Training.
1 Solicitations/Advertisements Solicitations/Advertisements
1 Overview of DOC Pharmaceutical Repackaging Efforts Senate Criminal & Civil Justice Appropriations January 14, 2010.
NHS Graduate Management Training Scheme Rob Farace
1 National Conference for Insurance Managers in Higher Education 23rd-24th April 2008 at Aston University Snakes and Ladders – Managing Risk in Higher.
Responsible Management of CO 2 Monash.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
BR Maintain and Updating in Census Year November 2008 Census Center NBS of China.
Local Solutions Year 12 Retention Fund Grant Application Guidelines – Round Two September 2013.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
International House is a vibrant residence and program center of more than 700 graduate students and trainees representing more than 100 countries. It.
……………………The Reality Behind the Recognition Business Excellence.
- 1- Just enough. Just in time. Just for you March 24, 2011 Building a solid foundation: A new approach to ERP acquisition March 24, 2011 Mike Reyna Project.
The Corporate Social Responsibility Market Access Partnerships Project (CSR-MAP) By: Thai Ecotourism and Adventure Travel Association (TEATA) and Partners.
Refurbishing an Existing Research Facility - Recent Experiences Jon Green VP Business Operations.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
Presentation by Florida Citrus Sports Florida Citrus Sports.
CRICOS Provider Code: 00113B AUPN – SUSTAINABLE PROCUREMENT IN UNIVERSITIES Developing a Sustainable Procurement Strategy for your University.
Goals of Workshop District Education Technology Plan Goals 8 goals aligned to State/National Education Technology Plans Strategies to meet challenges.
1 General Services Department State Purchasing Division ePROCUREMENT PHASE II Project Certification – Initiation/Planning Phase October 28, 2009.
1 ECM/EDMS Project HSD, TRD, SRCA September 26, 2007.
Department of Information Technology SHARE New Architecture, Hardware, Disaster Recovery, and System Upgrade Project Update SHARE Service Manager – David.
How to commence the IT Modernization Process?
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
Remote Housing in the Northern Territory DEPARTMENT OF LOCAL GOVERNMENT, HOUSING AND SPORT.
THE COMMONWEALTH FUND Figure 1. Nine of 10 Health Care Opinion Leaders Think Fundamental Change Is Required to Achieve Gains in Quality and Efficiency.
Local Government FM Network Environment and Sustainability Workshop Tuesday 15 July 2008 Kevin McDonald Our mission is to work with the public sector to.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
Richard Veale Accommodation Project Change Manager South Australia Water Corporation Driving Organisational Culture Through Workplace Design – When Moons.
1. Welcome back to CSC- 1st day of class
Weekly Attendance by Class w/e 6 th September 2013.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Berwickshire High School Presentation compiled 15 th October 2009.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
USG Housing P3 Initiative
HEALTH PPPs An introduction Is there a recipe for success?
New Papworth Hospital Bidders’ Day 7 September 2010.
The Croydon Monitoring Report Planning Obligations and Community Infrastructure Levy December 2014.
Madison’s Sustainable Design and Energy Committee: Notes from Portland, Oregon October 3, 2005.
Briefing the Portfolio Committee on Home Affairs: Strategies to use Banks for Smart ID Card applications 21 April
GEORGETOWN UNIVERSITY
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Wellington, New Zealand TETIARY EDUCATION SUMMIT 28 APRIL 2009 ETHICAL LEADERSHIP AND GOOD GOVERNANCE BY EXAMPLE. DRIVING BEST PRACTICE THROUGH EDUCATION,
National PPP Summit INFRASTRUCTURE FORUM April 2008.
An assessment of good practise in relation to the re-use or replacement of the 1960s buildings. How did we achieve it? What makes a design sustainable.
PRESENTATION TO PORTFOLIO COMMITTEE ON SPORT AND RECREATION SPORT INFRASTRUCTURE.
Senior Management Team Away Day Session 1: HMS Business Update Presentation by Paul Worthington Managing Director Friday 19th and Saturday 20th October.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Healthwatch Portsmouth Board meeting 17 October 2018
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
Wauwatosa School District
Sustainable Public Procurement
National Waterways Conference
Executive Sponsor: Tom Church, Cabinet Secretary
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

Main Roads and USA Visit SOUTHBANK EDUCATION AND TRAINING PRECINCT 27 June 2008

Southbank Institute of Technology Queensland’s largest Technical and Further Education (TAFE) institute More than 24,000 students including 2,500 international 400 staff Annual budget of $100 million Located close to Brisbane’s CBD

The case for a redevelopment Spread across three campuses Southbank Kangaroo Point Morningside Need to match facilities to world-class education Buildings unsuited to purpose

In 2003 Buildings not fit for purpose Poor utilization of space IT incompatible Poorly maintained facilities Need for compliance upgrades Inflexible spaces for changing education needs Poor use of energy Inefficient use of ‘footprint’ Inefficient energy and utilities

Buildings not Fit for Purpose

Not IT Compatible

Poorly Maintained Facilities Need for Compliance Upgrades

Inflexible Spaces for Changing Education Needs

Inefficient use of ‘Footprint’

Inefficient Energy and Utilities

The Procurement Process Develop PPP business case Compile PPP business case Expressions of interest Binding bids Contract management Phase 2 Service identification Preliminary assessment Phase 1

Project Scope 38 month construction phase 30 year operation phase $234 million construction $542 NPV (1995) Whole of Life cost – 34 years

Master Plan 11 new buildings 4 refurbished buildings Onsite student accommodation

Project Brief Adaptable Flexible Buildings Buildings for the future in keeping with modern precinct Greater public use of facilities Flexible learning spaces Responsive Teaching and Learning Spaces Opportunity to reconstruct core delivery systems and services Opportunity to introduce a alternative teaching modes e.g. Mode 2 Opportunity to introduce a greater range of learning technologies Cost Effective Operations Efficiencies through one-campus operations Greater efficiency of non-core services in the delivery of core services Affordability Limited to Agency Business Case

Construction Phase $234 million construction Business-as-usual during construction Two construction stages Design Development in conjunction with client Decanting and use of alternative facilities Project team based at Southbank Institute with significant support from other government agencies including: Department of Education, Training and the Arts Department of Infrastructure and Planning Queensland Treasury Department of Works

Construction Timeline To be completed four months ahead of schedule August – Construction begins January Building D annex (new) 29 June - Building H (new) July – winner international Public Private Finance Awards July – Building C (new) 31 October – Building B (refurbished) March - Stage 1 buildings opened by Premier Anna Bligh 14 April – Building E (new) - original schedule 30 June April – Building A (refurbished) 19 May Building F (new) – original schedule October June Building D (refurbished) – original schedule 30 June July – Building G (new & refurbished) – original schedule 11 October 2008

Operations Phase 2008 – 2039 All non-core services accepted by the private partner including; Maintenance Security Grounds Cleaning Porterage Replacement of FF&E

Energy efficient ‘green’ facilities Flexible learning spaces ‘Live’ teaching and learning environments Accredited standards for fitouts to operate commercially Reconstruction of delivery systems and services * Mode ll learning areas * Use of latest technologies Fully IT networked campus Modern Precinct catering to diverse needs Areas for public use * Ground floor studios * Auditoria * Meeting spaces * Retail Single campus operations Managed risk Value for Money Outcomes Delivered

Resolving Disputes Governance structure for escalation Dispute mechanism

Multi-Level Buildings Efficient footprint and centralised services

63 Bent St Toowong 4066 m: NORM JAGGER ETHICAL LEADERSHIP AND GOOD GOVERNANCE BY EXAMPLE. DRIVING BEST PRACTICE THROUGH EDUCATION, COLLABORATION AND CONSENSUS. MAKING A SUSTAINABLE DIFFERENCE IN THE WORLD.