STLE 2012 CBM and Reliability Engineering Conference Achieving Reliability from Data at Cerrejón A Living Reliability Centered Maintenance (LRCM) project.

Slides:



Advertisements
Similar presentations
Slide 1 The basic problem Working Age t PDF f(t) Failures do not happen at fixed times. They occur randomly based on a distribution. Probabilty Density.
Advertisements

Continuous Improvement in CBM
Unit III Module 3 - On Condition Task
Accident and Incident Investigation
1 SMS – Spares Management Software Overview and Case Studies.
Operation & Maintenance Engineering Detailed activity description
© AMD Publishing/ Terry Hill 2005 T. Hill, Operations Management 2e. Palgrave Macmillan ISBN: / X Chapter 14 PROCESS AND DELIVERY SYSTEM.
DATA CONSIDERATIONS Module 3 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
IEC – IEC Presentation G.M. International s.r.l
KPI Familiarisation.
Questions on failure codes 1.Why do we collect information, generally? 2.Why do we collect failure codes, specifically? 3.What is a failure code? 4.How.
Unit III Module 6 - Developing Age Exploration Tasks
Unit I Module 1 - Introduction to RCM
Applying RCM Principles in the Selection of CBM-Enabling Technologies
STEP 1 Develop/update RCM Program Plan STEP 2 New Equipment Design Recommended STEP 2B Complete Level 2 Breakdown STEP 4 Complete Levels 3 and 4 Breakdowns.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
GoldSim 2006 User Conference Slide 1 Vancouver, B.C. The Submodel Element.
Reliability Centered Maintenance From a Data Center Perspective March 2013.
" Copyright 2002, Information Spectrum, Inc. All Rights Reserved." RCM DECISION LOGIC Module 5 UNIT II RCM PROCESS.
Time-Dependent Failure Models
Prof. Seppo Virtanen TUT PURESAFE Final Conference Tuesday 20 January 2015, 14:20 – 14:40 RAMS Methods and Tools: From LHC to FCC.
Overview Lesson 10,11 - Software Quality Assurance
BRIDGING THE GAP BETWEEN THEORY AND PRACTICE IN MAINTENANCE D.N.P. (Pra) MURTHY RESEARCH PROFESSOR THE UNIVERSITY OF QUEENSLAND.
Unit III Module 4 - Hard Time Task
Introduction Before… Next…
Vestas.com Condition Based Maintenance of Vestas Offshore Turbines European Offshore Wind Conference & Exhibition 2009, Stockholm Jacob Juhl Christensen,
RCM - Maintenance Philosophy of the Future?
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Reliability from DATA A framework for technology OMDEC.
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
The use of recorded information
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
TASK PACKAGING Module 1 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
1 Module 8 UNIT III " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." HOW TO PERFORM RCM ANALYTICAL METHODS.
How Aircraft Operators Can Benefit from PHM Techniques Big Sky - Montana 2012 IEEE Aerospace Conference Leonardo Ramos Rodrigues EMBRAER S.A., São José.
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
Reliability Models & Applications Leadership in Engineering
SUSTAINING THE ANALYSIS Module 2 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
COOP Seminar – Fall 2008 Slide 1 HOUSTON COMMUNITY COLLEGE SYSTEM SAIGONTECH SAIGON INSTITUTE OF TECHNOLOGY Software Project Management.
CBM Optimization – Complex items An item is a group of components that is convenient to monitor and analyze together Equipment units, as defined in the.
The nature of data Age data Condition data. 2 There are two major types of data: 1.Age (event) data: 2.Condition monitoring data:
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
1 Under the Covers with EXAKT How it works….. July Ben Stevens
1 EXAKT SKF Phase 1, Session 2 Principles. 2 The CBM Decision supported by EXAKT Given the condition today, the asset mgr. takes one of three decisions:
SELECTING TASK OR OTHER OPTIONS Module 7 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
ON CONDITION TASK Module 3 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
FAILURE FINDING TASK Module 5 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Reliability Centered Maintenance. Condition Monitoring Reliability Vibration Analysis Oil Analysis Performance Analysis Failure Analysis.
OMDEC Partners Conference Toronto Where are we from.
Organizational Process The activities conducted by an educational institution or school is called organizational process Which consist of series of steps.
SKF Course on EXAKT Phase 1 Session 3 Part 2 Cost comparison function Determining the benefits of an improved decision model over an existing one.
Copyright © 2013 LivingReliability All rights reserved. Challenges to Achieving Reliability from Data.
DATA UPDATE 3M DATA / DEGRADER ANALYSIS AGE EXPLORATION DATA ANALYSIS FATIGUE LIFE ANALYSIS FAILURE ANALYSIS (INCLUDING DISTRIBUTIONS / INTERVALS / RATES)
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
PROJECT MANAGEMENT Software Engineering CSE
Stracener_EMIS 7305/5305_Spr08_ Reliability Centered Maintenance Analysis (RCMA) Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering.
EQUATE PETROCHEMICAL COMPANY EQUATE RCM Project Implementation By Khalid Al-Anzi.
Maintenance strategies
Saint- Petersburg State University of Aerospace Instrumentation
Cost Comparison Function
IENG 451 / 452 Stability: Total Productive Maintenance
An-Najah National University
HUMAN RESOURCE GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE
Embry-Riddle Aeronautical University
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
HSE Case: Risk Based Approach.
Unit I Module 3 - RCM Terminology and Concepts
Presentation transcript:

STLE 2012 CBM and Reliability Engineering Conference Achieving Reliability from Data at Cerrejón A Living Reliability Centered Maintenance (LRCM) project Gerardo Vargas, Carbones del Cerrejón Ltda. Juan Carlos Consuegra, Carbones del Cerrejón Ltda. Oscar Hoyos Living Reliability (presenter) Murray Wiseman, OMDEC Inc. Dr. Daming Lin, OMDEC Inc.

Introduction – Main Actors Carbones del Cerrejón – World´s largest export coal mining operation OMDEC – EXAKT CBM Optimizing Software Living Reliability – Consultants in Living RCM (LRCM)

Commonly used terms LRCM: Living Reliability Centered Maintenance CMMS: Computerized Maintenance Management System Event type: How a failure modes life cycle ends? By: Potential Failure (PF) Functional Failure (FF) Suspension (S) PHM: Proportional Hazard Model. Extends Weibull to include CBM data. CBM: Condition Based Maintenance

RCM 1.What are the items functions to be conserved? (The performance requirement)requirement 2.In what ways can these functions be compromised? (The failure or failed state) 3.What causes the loss of function? (The failure mode)loss 4.What happens? (The effects) 5.How does it matter? (The consequences (H, S, O, N)? 6.What maintenance task should be done to avoid or lessen the consequences? 7.What if no appropriate maintenance task can be found?

Introduction - Assertions 1.Without an adequate data sample there can be no Reliability Analysis (RA) 2.Without analysis there can be no systematic verifiable improvement in reliability or in operational economy.

Introduction - What is a sample? Sample Right (Temporary) Suspensions: EF, ES: endings by failure, suspension B: Beginnings Life cycles: Left Suspensions: Calendar Time Work ord. 1, FF RCMREF15 Work ord. 2, FF RCMREF16 Work ord. 3, FF RCMREF16 Work ord. 4, S RCMREF15 Work ord. 5, PF RCMREF15 CMMS Work orders EF15 B15 EF16 B16 EF16 B16 ES15 B15 EF15 B15 Events table

Objective To describe a method wherein completed maintenance work orders capture RA enabling information

Agenda Introduction Objective CBM decisions The CBM model The obstacles The Living RCM solution Results Summary Questions and discussion

CBM Decisions Three decisions whether to: 1.Stop the equipment as soon as possible and perform a specific preventative action as indicated by the monitored data, or 2.Schedule an indicated preventative maintenance action within a specific and safe time period, or 3.Carry on with the normal operation of the equipment until the next CBM inspection and evaluation.

Cerrejon´s requirements for CBM CBM Method: Oil Analysis Failure mode: General Engine Wear RULE: 2090 hours StdDev: 1445 hours The three criteria 1.Optimal 2.Automated 3.Verifiable

CBM optimal model Predictive Model + Hazard model RULE and Confidence interval Decision based on: Probability RULE Scatter Cost model EXAKT Decision based on: Cost and Probability

The obstacles There are two possible reasons for the unsatisfactory performance of CBM decision model. 1.The condition monitoring variables that are available to the CBM program intrinsically bear little or no relationship to the actual failure modes that occur in the fleet. Or, 2.The data sample used to build the predictive model does not distinguish between Failure and Suspension.

Obstacle 1 the CBM variable have no relationship to actual failure modes Low predictability Working age t PDF f(t) Weibull Analysis FE ppm 100 Working age t PDF f(t) High predictability PHM Analysis

Non (low) influential indicators Obstacle 1 the CBM variable have no relationship to actual failure modes

Misreporting suspensions as failures (or potential failures) will weaken the model in two ways: 1.It will inflate the shape parameter causing decisions to be predominantly age based, regardless of intrinsically good (predictive) CBM condition indicators. And, 2.…. Obstacle 2 Mistaking suspensions for failures

2.It will increase the scatter, and consequently confidence in prediction. This point raises a subject that RCM stresses as one of prime importance. What shall be the standard used to declare failure? Obstacle 2 Mistaking suspensions for failures

The Living RCM solution 1.Capturing the right information in the work orders system (CMMS) 2.Generating automatically a sample for RA 3.Motivation, leadership, and training 4.Low and high level performance metrics

1. Capturing the right information in the work orders system (CMMS) Work Order RCM concepts Ellipse - Baseman Free text (updates) What I did? What I found? Event type (FF, FP, S)

Living Reliability Selecting the Event Type determines the entire sample point System Component Function Failure Failure mode Efects RCM as the main language of maintenance. Updates to the RCM Knowledge base 1. Capturing the right information in the work orders system (CMMS)

2. Generating automatically a sample for RA

An LRCM project implementation succeeds based on a realization that personnel respond to the intangibles: 1.Recognition, 2.Empowerment, 3.Interest by management in their activities, and 4.Training. 3.Motivation, leadership, and training

4. High and low KPI´s Performance metrics should point us precisely to what we need to improve currently in our maintenance process. That is, they should trigger a control action. Subsequently they should confirm and measure the extent to which the control action had the desired effect.

4. High level KPI´s High level (lagging) KPIs : provide, at various levels of granularity, such measures as: 1.MTTF, MTTR, Availability 2.Costs, and 3.Yield

Low level KPI´s Low level (leading) KPIs : should measure such indicators as: 1.RCM knowledge added, The number of links between RCM knowledge and work orders, The number of RA performed CBM performance: a.Standard deviation in remaining useful life estimation b.The influence of current CBM variables as reported by the PHM shape parameter

It is the managers job to set low level objectives that: 1.Employees can influence by the way they perform their duties, and that 2.Support the high level organizational targets. The managers job

The results achieved 1.Better analysis (lower shape factor, lower standard deviation ) More confidence in making decisions 2.The maintenance personnel have now a method to register in a precise way the right information inside the W.O. system. 3.More Reliability Analysis 4.Develops, verifies, and continually improves optimal maintenance policies 5.Updates to the knowledge base

The results achieved Improvement in the quality of the information required for RA: Carbones del Cerrejón Fleet 789C Today 90% % of Satisfactory W.O May 40% July 70%

Carbones del Cerrejón Updates in the RCM knowledge base: The results achieved

Summary 1.Use the language of RCM to guarantee the right information from the work order system (CMMS) 2.Add the condition monitoring (CBM) data 3.Apply Reliability Analysis to generate optimal DMs. Age data (CMMS) CBM data Cost data Reliability Analysis (RA) Optimal decision models High availability Low cost

More information Managing LRCM LRCM KPIs LRCM and HSE and Other related topics

Thank you for your attention Do you have any questions? Questions ?