We need a moratorium Give us the time to find a solution We have an incompatible land-use puzzle to solve The southwestern portion of Buffalo County is.

Slides:



Advertisements
Similar presentations
KEVIN B. PAGE VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION VIRGINIAS RAILROADS A STAKEHOLDER IN TRANSPORTATION DEVELOPMENT.
Advertisements

U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Freight, Goods and Services Plan & Economic Impact on Central Florida.
Missoula Planning Summit Milestone 14 August, 2008 Missoula, Montana.
Utility Course Case Studies CEA and Road Builders Workshop Joe Mah, M.Eng.P.Eng.
Impacting Local Government Updating Functional Classification Using GIS September 12, 2013 Bentonville, Arkansas.
Communities In Motion Blueprint for Good Growth Preferred Growth Scenarios March – April 2005.
House Community & Military Affairs Subcommittee Presented by: Mike McDaniel, Chief of Comprehensive Planning, Division of Community Development Tuesday,
Art of Negotiation So you want to be a good negotiator?
About Wired65 $5 million grant awarded by the U.S. Department of Labor’s Workforce Innovations in Regional Economic Development (WIRED) initiative. Includes.
Localized Programming Models for Small Cities: A Case Study of Tehachapi, CA 2012 ITE Western District Annual Meeting Santa Barbara, CA June 27, 2012 Localized.
Unit One: Lesson Nine. Connecting back to Lesson 1 – Circle of regions Dividing Michigan in to regions The Upper Peninsula and Lower Peninsula Other Michigan.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
OSG Analysis on the Gloucester County Rail Line Study State Planning Commission December 3, 2008.
Community GPU Forums California Native Plant Society, Monterey Bay Chapter Carmel Valley Association Citizens for Responsible Growth Coalition to Protect.
2015 FLAP GRANT APPLICATION
Lec 15 LU, Part 1: Basics and simple LU models (ch6.1 & 2 (A), ch (C1) Get a general idea of urban planning theories (from rading p (A)
Norman W. Garrick Transportation Forecasting What is it? Transportation Forecasting is used to estimate the number of travelers or vehicles that will use.
CE 515 Railroad Engineering Armstrong Chapter 8: Railroad Operation – Moving From Here to There “Transportation exists to conquer space and time -”
Planning for One Transportation System – Marine Highways Kevin Schoeben Deputy Director Office of Planning and Programming Illinois Department of Transportation.
Burnet County Comprehensive Plan. What Is the Comprehensive Plan? This is a county strategic plan that will focus on the areas where the county government.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
January 25, SMART GROWTH IN RURAL IDAHO TOWNS.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Study conducted for the Coalition of Alabama Waterway Associations by Troy University Center for International Business and Economic Development.
Settlement Patterns.
UW Cooperative Extension Land Use Education Programs Comprehensive Planning Overview March 15th Osceola WI Polk County UWEX-Cooperative Extension.
Compact for a Sustainable Ventura County A project of the Ventura County Civic Alliance and the Ventura Council of Governments.
Presented by Christopher Msipu Phiri.  Location ◦ South Central part of Africa ◦ Landlocked Country with eight neighbors  Size ◦ Km2  Population.
Container Port Element City of Tacoma Planning and Development Services January 17, 2014.
Exurban Growth in the United States During the past 30 years, many families have left city centers and moved to "bedroom communities." These areas offer.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
Arctic Mining Northwest Alaska Northwest Arctic Borough.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
X-33 Environmental Impact Statement: A Study in “Velocity” Or How Fast Can You Do an Environmental Impact Statement?
Highway Functional Classification Chapter 16 Dr. TALEB M. AL-ROUSAN.
Rappahannock-Rapidan Regional Visioning Process Counties and Towns of Culpeper, Fauquier, Madison, Orange and Rappahannock Bruce Dotson Tanya Denckla Institute.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
AMAL CITY OF HOPE BY KENMORIA CONSULTANCY TEAM. SITUATION Introduction Introduction Old city was a mini centre for mining of “Kolatone”, a special additive.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
FREIGHTSUPPORTIVE LAND USE PLANNINGGUIDELINESFREIGHTSUPPORTIVE PLANNINGGUIDELINES FHWA Talking Freight Series May 18/05 Video Seminar on Context Sensitive.
FOR CLERKS AND RECORDERS  Planning Commission – public meeting and a public hearing  City Council – public hearing  Must contain: - a map of expansion.
CEMEX Open Discussion March 10, Outline Background Background Issue Issue Proposed Actions Proposed Actions.
Historical Research and Existing Data ESP 178 S. Handy 2/27/07.
The Questions Before The Storm. Standish Comprehensive Plan Update Committee 2004 Survey Development The following questions were suggested at the Standish.
Rappahannock-Rapidan Regional Visioning Process Counties and Towns of Culpeper, Fauquier, Madison, Orange and Rappahannock Bruce Dotson Tanya Denckla Institute.
Transportation Forecasting The Four Step Model. Norman W. Garrick Transportation Forecasting What is it? Transportation Forecasting is used to estimate.
Florida’s Strategic Intermodal System (SIS): A Change in Transportation Planning Presented by: Alan J. Rukin.
Measure 60 Cycle Transport Improvements Katerina Oktabcova Usti nad Labem Municipality.
Why Plan? Unprecedented pressure for growth and change To identify development and preservation areas over next 20 years To recommend types of land uses.
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
TOWN OF JUPITER Abacoa Property Owner’s Association Annual Meeting November 17, 2010.
Steve Horenstein CASE STUDIES OF COMPREHENSIVE PLAN PROCESSES AND RESULTS : Comprehensive planning as an economic development tool; Striking the right.
WITH SPECIAL THANKS TO. TOWN OF CALMAR LNEDA PRESENTATION Brought to You By: ED MELESKO Director of Public Works & Land Development.
Moving Forward Together Highway 18 Master Plan Department of Planning and Development Office of City Planning City of Jackson, Mississippi Tony Yarber,
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Transportation for Everyone Community Transportation for the Contoocook River Valley February 2007 Posted 2/14/07.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Downtown Valdosta Truck Traffic Mitigation Study
Central Polk Parkway PD&E Study
Regional Roads Committee
Transit Leadership Academy (MTTA)
Purchasing Made Easy with Amazon Business
Coordinate Operations Standard
Presentation transcript:

We need a moratorium Give us the time to find a solution We have an incompatible land-use puzzle to solve The southwestern portion of Buffalo County is primarily scenic river and coulee country where the focus is on recreation and tourism. In the northeast are the rolling sand hills that actually extend across much of central Wisconsin up into the northwestern lakes region where the economic emphasis is more on agriculture and small industry. This map shows the proposed and approved haul routes from the sand mines in the county. This is why the County Board and the Board of Adjustments need to consider haul routes in addition to conditions immediately adjacent to the proposed mines. The implications for a very large proportion of the county are enormous and need to be considered when granting mine applications. This map shows how the stakes in this win/lose conversation get even higher if the Coulee Country moves from being a transportation corridor to being a transportation hub and processing center. Purchase agreements for land to build a rail spur and processing facility at the intersection of Wisconsin highways 88 and 35 are already being put in place. If that facility goes forward as planned we not only become the transit provider for local sand, but regional sand will most likely start flowing into the county as well. We face becoming a transportation corridor… Or a processing hub

Questions that need to be asked, and answered Are we to become a transportation corridor? What are the implications when multiple mines are approved that all use the same haul route? Who makes the determination this mine is the last one we can approve without overloading the route? How are the needs of the many (residents and people who work in Coulee Country) balanced with the needs of the few (mine operators and the businesses that provide them services)? What happens when one of the destination rail-loading locations reaches capacity? Winona officials have already told local residents that the switching facility in Winona is at capacity and that they cant load any more trains there. Does the traffic all divert to Wabasha? What are the impacts on towns along those routes as traffic patterns change? What is the implication of locating processing facilities at the applicant location – doesnt this effectively lock in a preferred haul route for sand out of that plant long after the actual mining at the site is completed? Loading a road with extra truck traffic for 5 years is quite a different thing than setting up a scenario what that route would be used for decades or even generations. Are we to become a transportation and processing hub? With across the river rail transfer facilities reaching capacity, what are the implications for communities along the Highway 35 corridor if Buffalo County becomes a rail-transfer option on the Wisconsin side of the Mississippi? Will Buffalo County become a destination for sand mine operations in neighboring counties as well as mines located here? Again, what is the point at which it will be decided that the roads through towns like Alma, Fountain City and Nelson are at capacity? Who will make those decisions? How will they be decided? How will they be enforced? Will there be any way to limit traffic to a predetermined level if much of the transportation load is generated outside the county? Will we have open transparent decision-making or furtive hasty deals? When do the many get to participate in a process to try to arrive at a solution to this problem? Isnt the charter of the Board of Adjustments to look after the public interest, the purpose and intent of this ordinance and substantial justice to all parties concerned? How is this goal met by a pell-mell rush to approve mines without taking the time to put the impacted parties together in an open, transparent way to try to work out a solution that is acceptable to all? Prepared and submitted by Mikey OConnor For more information, or to join the BuffaloCounty list go to: