OPERATIONAL RANGE ASSESSMENT PLAN

Slides:



Advertisements
Similar presentations
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
Advertisements

HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
THE CONCEPTUAL SITE MODEL A Visual Journey Though Data and Time October 29, 2013.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
EMS Checklist (ISO model)
Background Presenters Work done in preparation for WHS changes
Overview of the EPRI Groundwater Assessment Program
Opportunities Exist to Strengthen FHWAs Coordination Guidance and Oversight of the Tribal Transportation Program October 30, 2013.
Checking & Corrective Action
International Civil Aviation Organization Establishing and Sustaining an RSOO: Enablers, Obstacles and lessons learnt Meshesha Belayneh Regional Director,
1 Department of State Program Evaluation Policy Overview Spring 2013.
Hayward Water System Public Health Goal Report Alex Ameri, Deputy Director of Public Works Utilities Division Department of Public Works.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
Current Conservation Issues in DoD L. Peter Boice OSD Conservation Team Leader Presented to NMFWA, Dallas TX March 2002.
ISO EMS Policy Statement N.C. Division of Pollution Prevention and Environmental Assistance.
The Office of Information Technology Information Security Administrator Kenneth Pierce, Vice Provost for IT and Chief Information Officer.
Contractor Safety Management
Risk Management Program Quality Assurance Program Plan David R. Taylor US EPA Region 9 Quality Assurance Office.
Environmental Health XIV. Standards and Monitoring Shu-Chi Chang, Ph.D., P.E., P.A. Assistant Professor 1 and Division Chief 2 1 Department of Environmental.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
EVOLUTION OF AIR FORCE ENVIRONMENTAL PROTECTION Thomas Russell, P.E. U.S. Air Force Center for Environmental Excellence Partnership for Peace Conference,
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Implementation of DOE Order 450.1: Self-Declaration and Report Letters Steven R. Woodbury US Department of Energy March 9, 2005.
Basics of OHSAS Occupational Health & Safety Management System
Introduction to SDLC: System Development Life Cycle Dr. Dania Bilal IS 582 Spring 2009.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Environmental Restoration Program Optimization (ERP-O) Ed Brown AFCEE/TDV.
Tier II: Module 1C CERCLA 128(a): Tribal Response Program.
Marine Air Ground Task Force Training Command Marine Corps Air Ground Combat Center 1 MCAGCC Future Plans and Development.
Munitions Response Services EA Engineering, Science, and Technology, Inc. ® Having provided Munitions Response services on hundreds of sites, EA knows.
DOEEPADoDDOEEPADoDDOE EPADoDDOEEPADoDDOEEPA DoDDOEEPADoDDOEEPADoD 1 The Intergovernmental Data Quality Task Force (IDQTF) April 2004 Presented By: James.
Using ISO and EDYS as a Framework for Creating a Sustainable Range Management System 30th Environmental & Energy Symposium & Exhibition April 5 -
1 Probability of Program Success Component Standardization : Status Brief Ms. Jane Rathbun Special Assistant, Program Management Improvement OSD(AT&L)(A&T)(PSA)
Multimedia Assessment for New Fuels: Stakeholders’ Meeting September 13, 2005 Sacramento, CA Dean Simeroth, California Air Resources Board Dave Rice, Lawrence.
1 of 21 Introduction to the EPA 7-Step DQO Process DQO Training Course Day 1 Module 7 (30 minutes) Steps Presenter: Sebastian Tindall.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
MISSION FIRST…PEOPLE ALWAYS…ONE TEAM Fort Lewis Installation Sustainability Program.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Environmental Infrastructure Needs Assessment: GIS Based Decision Support System Southwest Center for Environmental Research and Policy Presented by Rene.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Potential Addition of Vapor Intrusion to the Hazard Ranking System U.S. EPA Office of Solid Waste and Emergency Response February 24, 2011 Listening Session.
What is a Public Health Assessment? “The evaluation of data and information on the release of harmful substances into the environment in order to assess.
SOFTWARE PROJECT MANAGEMENT
By Michelle Hoang Period 2 APES April 30, 2012 The Toxic Substances Control Act of 1976.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AF Environmental Transformation Jeff Domm HQ USAF/ILEV 7 Apr 04.
Environmental Officer Course Introduction Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 12/24/2015.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Statistical office of Montenegro (MONSTAT) & Environmental Protection Agency of Montenegro (EPA) GENEVA, 04 November 2013.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Environmental Management System Implementation. Practices, Aspects, Impacts- Concepts Mission Resource Impact Resource Impact Activities/ Operations Practices.
Unregulated and Emerging Contaminants JSEM August 2004.
Environmental Considerations prior to purchasing Properties Sabine E. Martin, Ph.D., P.G. Center for Hazardous Substance Research Kansas State University.
EPA P-1 Corrective Action Streamlined Consent Orders Bob Greaves Region 3 Deb Goldblum Region 3 Tom Krueger Region 5.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
SABR Updates Amy Yersavich, Ohio EPA VAP Certified Professional Annual Training October 27, 2015.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force The Air Force Military Munitions Response Program For: Mr. William.
Massachusetts Waste Site Cleanup Program _________________________________ Privatized program since 1993 Direct oversight of only the highest priority.
Delivery System Reform Incentive Payment Program (“DSRIP”) New York Presbyterian Performing Provider System.
Improving Chemical Facility Safety & Security RRT Quarterly Meeting July 16, 2015.
Identifying Environmental Aspects EPA Regions 9 & 10 and The Federal Network for Sustainability.
Proposed Plan for No Further Action
Safe Drinking Water Act , CCL and Perchlorate
Document Evaluation Process May 2005 Revision
ENVIRONMENTAL SAFETY & HEALTH DEPARTMENT OF THE NAVY RESPONSIBILITIES
National Environmental Policy Act (NEPA)
“Malaysia’s Presentation on Experiences Using the POPs Toolkit” by Goh Choo Ta Final Regional Workshop Da Nang, Vietnam 2009 Draft Project Implementation.
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
ABCPhD Doctoral Program in architecture, built environment and construction engineering ABCPhD Call4Scholarship 34 RESEARCH TOPIC: Automation, Robotics.
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Presentation transcript:

OPERATIONAL RANGE ASSESSMENT PLAN Ms. Emily McBride & Mr. Adam Cooper Environmental Range Initiatives Office of the Air Force Civil Engineer May 2006

PURPOSE Status Intent Details Implementation This briefing is going to cover 4 main topics. Where the AF plan currently is The Purpose or intent of the plan Some details about the plan And, the implementation approach

STATUS AF Deputy Civil Engineer has required operational range assessments at all Air Force Operational Ranges AF Operational Range Assessment Plan (ORAP) for Tier 1 ranges is complete A comprehensive ORAP for Tier 1, 2, and 3 ranges is underway Three pilot assessments have been conducted and completed Decentralized execution to begin in FY07 This slide illustrates were the AF’s plan is currently The Deputy CE has tasked all the MAJCOMs to conduct assessments at their Operational Ranges The Operational Range Assessment Plan has been completed. This is the guidance that the MAJCOMs and Installations will follow when they conduct their range assessments In developing the ORAP HQ AF conducted pilot assessments at 3 ranges to ensure the plan was viable and effective Decentralized execution is ready to begin. Program responsibility falls at the MAJCOM and Range/Installation Levels. HQ AF does not execute. Our role is to provide guidance and direction This is important when examining external stakeholder communications and reporting. – will talk to later in brief

INTENT The Air Force is committed to sustaining its operational test and training ranges. Operational range assessments are a range management tool that supports range sustainability. This is our goal – the purpose of the program: Sustain our ranges to ensure future availability and capability It is important to note that this is a range management or range sustainment tool. This is not a clean-up program

ORAP DETAILS – PRIORITIZATION AF Operational ranges owned, operated, leased or withdrawn Ranges not Included: Small arms ranges assessed under compliance programs equivalent to the ORAP Indoor ranges / recreational ranges due to definition Tier 1 (Sep 08): CONUS air-to-ground ranges Tier 2 (Sep 10): Overseas air-to-ground ranges, stand-alone EOD ranges, grenade ranges, etc. Tier 3 (Sep 12): Small arms ranges Now were going to discuss some of the details of the ORAP In order to facilitate the development of better guidance and more efficient assessment execution, the ranges were prioritized based on mission criticality and relevance. 3 Tiers – as shown Tier 1 – Majority of acreage / Most mission critical Based on the Air Force submittal to OSD’s 2005 Section 366 report to congress Largest assets in terms of acreage – Most are stand alone assets – Geographically separated from a AF base or installation 17 Tier 1 Range Complexes / 5.72 Million Acres / 81.1% of Inventory acreage Tier 2 – Mostly contained within or adjacent to an existing AF base or installation. 191 Ranges / 1.31 Million Acres / 18.6% of Inventory acreage Tier 3 – Least amount of acreage. Mostly contained within existing AF installations. 109 Ranges / 0.02 Million Acres / 0.3 % of Inventory acreage The dates represent when the assessments will be complete for each of the tiers. ….may be completed earlier, but not later than….allows for more flexible funding.

ORAP DETAILS – MUNITIONS CONSTITUENTS ORAP list of munitions constituents includes: 1,3,5-Trinitrobenzene 1,3-Dinitrobenzene 2,4,6-Trinitrotoluent (TNT) 2,4-diamino-6-nitrotoluene 2,6-diamino-4-nitrotoluene 2,4-Dinitrotoluene (2,4-DNT) 2,6-Dinitrotoluene (2,6-DNT) 2-Amino-4,6-dinitrotoluene 4-Amino-2,6-dinitrotoluene 2-Nitrotoluene 3-Nitrotoluene 4-Nitrotoluene Hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) Methyl-2,4,6-trinitorphenylnitramine, (Tetryl) Nitrobenzene Nitrocellulose (NC) Nitroglycerin (NG) Nitroguanidine Octahydro-1,3,5,7-tetranitro-1,3,5,7-tetrazocine (HMX) Perchlorate Pentaerythritol tetranitrate (PETN) Chromium Lead White Phosphorus List of Munitions constituents that are included in the ORAP’s Master list. Bolded MCs are required by the DoDI 4715.14 Based on Munitions used at a particular range, this list will be modified during the actual assessment process. …..DU as an example List will be modified (MCs added or removed) on a site-by-site basis based on the DQO process

ORAP DETAILS – Conceptual Site Model One programmatic study question: Is there migration / threat of migration of munitions constituents of concern from an operational range to an off-range area that poses an unacceptable risk to human health Qualitative Phase – develop a CSM from existing records Complete CSM - no source / receptor interaction identified, the assessment is over, and an assessment report produced. Incomplete CSM, collect additional data to fill gaps. Develop sampling plan and a qualitative assessment report. Quantitative Phase – gather additional data Sample to fill-in CSM data gaps Issues a quantitative assessment report summarizing all assessment activities This slide lays out the main ORAP process. It is based on the EPA’s Conceptual Site Model and Data Quality Objective processes It also follows the format required by DoDI 4715.14

ORAP DETAILS – QUALITATIVE PHASE Range-wide, Conceptual Site Model, designed to focus qualitative assessment on potential exposure pathways. Sources: How do we expect contamination to be released? Where do these conditions exist? Receptors: Humans in proximity to potential transport/exposure medium (Based on existing EPA guidance for receptor identification). Pathways: Viable conduit for contamination to move to the receptor This outlines the first phase of the ORAP We will try and use as much existing documentation as possible

ORAP DETAILS – QUANTITATIVE PHASE If source/receptor interaction identified during qualitative assessment: Conduct Quantitative Assessment Focus on potential exposure pathways Source/receptor/pathway specific Sampling focused along sentry arcs X 25% 75% Source Sentry Arc Groundwater gradient Sampling point Outlines the second phase (quantitative phase) Sampling will only be conducted where necessary. Sampling will not be conducted unless the decision criteria point to it (ie. Just because we are sampling, does not mean we would sample for an MC that has never been used at the range) Sample first along the identified pathways at the 25% sentry arc If sample shows MC at the 25% sentry arc, sample the 75% sentry arc If sample shows MC at the 75% sentry arc, sample at the range boundary

ORAP DETAILS – RELEASE/RESPONSE Qualitative assessment results = no source-receptor interaction: Assessment report prepared, process documented Reassess in 5 years or sooner Qualitative assessment results = completed source-receptor interaction: Quantitative assessment conducted to better understand if MCs are truly migrating If MC Migration is identified: Respond to MC Migration through an existing AF environmental response program as appropriate Action steps at the conclusion of the processes.

ORAP DETAILS – REPORTING Internal Upon finalization, assessment reports sent to the MAJCOM HQ USAF/A7CVRI issues annual status reports to OSD. External Wing Commander will inform the regulators in accordance with NCP and other applicable state and federal laws. Upon completion of the assessment, final reports are made available to the public. Contractor Performing Assessment Installation / Range Wing Commander MAJCOM The boxes show how information will move internally within the AF Range - MAJCOM - HQ – OSD External Reporting / Outreach Opportunity to work with involved AF parties at the different levels – represented by triangles The Guidance developed by Air Staff does not preclude the regulatory community from working with the local range/installation/MAJCOM POCs. Coordination and cooperation will be based on local and regional relationships. FINAL Assessments will be made available to the public

ORAP IMPLEMENTATION Distribution to MAJCOMs for FY07-08 execution Pilot-tests complete Warren Grove, NJ / UTTR, UT / BMGR, AZ HQ AF programmed to complete 9 additional assessments in FY06 MAJCOM execution subject to funding availability Implementation and Execution 3 Range Complexes already assessed: Equals approx 2 million acres assessed Air Staff is using $ already on contract to execute assessments at 9 additional range complexes. Equals approx 300,000 acres assessed Equals 12 of 17 Tier 1 Range Complexes Completed Dare County Ranges, NC – submitting draft report 15 May Juniper Butte, ID – submitting draft report 15 May Saylor Creek, ID – submitting draft report 15 May Poinsett, SC – need additional data Grand Bay, GA - ? Edwards, CA – submitting draft report 15 May Claiborne, LA – developing draft report Hardwood, WI – developing draft report Smoky Hill, KS – site visit 24 April Remain ranges to be assessed Avon Park, FL Melrose, NM Nellis Test and Training Range, NV Eglin Range, FL Jefferson Proving Ground, IN

United States Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e