Towards an Enhanced Telluric Compensation Methodology

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

SWITCH-MODE POWER SUPPLIES AND SYSTEMS Silesian University of Technology Faculty of Automatic Control, Electronics and Computer Sciences Ryszard Siurek.
Magnetic field.
General Characteristics of Gas Detectors
Stray and Telluric Current Correction
Corrosion and Cathodic Protection
Electric current DC Circuits AC Circuits. Lecture questions Electric current DC Circuits. Ohm's law Resistance and conductance Conductivity of electrolytes.
Maxwell’s Equations The two Gauss’s laws are symmetrical, apart from the absence of the term for magnetic monopoles in Gauss’s law for magnetism Faraday’s.
Chapter 31 Faraday’s Law.
Co-Axial Cable Analysis. Construction Details Question 1 What is the fundamental equation relating the magnetic field surrounding a conductor and the.
STRAY CURRENT CORROSION
Climate and The Ocean Chapter 17.
Fusion Physics - Energy Boon or Nuclear Gloom? David Schilter and Shivani Sharma.
Sub-THz Component of Large Solar Flares Emily Ulanski December 9, 2008 Plasma Physics and Magnetohydrodynamics.
Electromagnetic Wave Theory
The birth of quantum mechanics Until nearly the close of the 19 th century, classical mechanics and classical electrodynamics had been largely successful.
The sun and our solar system Grade 9 Science Space Part 2.
Earth Sciences Sector Towards Reducing the Space Weather Impacts on Vulnerable Infrastructure (ground technology) L. Trichtchenko, D.H. Boteler Geomagnetic.
BRIEF ON THE REPORT OF CIGRE WG B4-45 –
Motion The base SI units for length, time, and mass are meters, seconds, and kilograms Movement in relation to a frame of reference is called relative.
1 Faraday’s Law Chapter Ampere’s law Magnetic field is produced by time variation of electric field.
Electromagnetic Methods (EM) Measurement of varying electromagnetic fields Induced by transmitter antennas, recorded by receiver antennas Alternative measurement.
Chapter 4 Linear Wire Antennas ECE 5318/6352 Antenna Engineering
Basic Cathodic Protection Measurement and Monitoring- IR Considerations Western Regional Gas Conference 2008 Tempe, Arizona By Paul Sedlet, Accurate Corrosion.
There will be one last homework assigned today. It will not be due until the day of the final, Dec 13. I will also put some practice problems on line today.
Direct current (dc) generators Split ring (commutator) does the job of reversing polarity every half cycle.
Space Weather Major sources of space weather ● Solar wind – a stream of plasma consisting of high energy charged particles released from the upper atmosphere.
General electric flux definition
Chapter 31 Faraday’s Law.
Astronomy and Space Ms. Woodard. DAY 1 Objective Objective – I can explain how the universe formed and the laws governing it.
AC vs. DC The production of and use of electricity is an expensive business.Therefore the most efficient use of the resource is required. The most efficient.
Parts of a Wave. Physical Science EOCT Review Domain IV Waves, Electricity and Magnetism.
Chapter 4 Earthquakes Map is from the United States Geological Survey and shows earthquake hazard for the fifty United States.
Generator and Transformer. Moving Conductor If a straight conductor is moved in a path perpendicular to a magnetic field, a current is induced in the.
Objectives Explain how radiant energy reaches Earth.
Generator and Transformer. Moving Conductor If a straight conductor is moved in a path perpendicular to a magnetic field, a current is induced in the.
Midterm Jeopardy Categories: Five. Daily Doubles: Two.
Chapter 21 Electromagnetic Waves. General Physics Exam II Curve: +30.
Corrosion control measurements Incorrect assumptions are making pipeline corrosion control impossible.
The Sun.
Ch. 26.1: Our Sun!.
Geology 5660/6660 Applied Geophysics 16 Apr 2014 © A.R. Lowry 2014 For Fri 18 Apr: Burger (§5.11) Last Time: IP (Induced Polarization) Induced.
Electric Potential Energy of the System of Charges
Solar Properties Has more than 99% the mass of our solar system Has more than 99% the mass of our solar system Diameter: 1,390,000 km Diameter: 1,390,000.
Technician License Course Chapter 2 Radio and Electronics Fundamentals
The final will be Thursday, May 8:00 AM. It will be 40% comprehensive and 60% what we have covered since the last exam. It will be open book/note.
Techniques for Nuclear and Particle Physics Experiments By W.R. Leo Chapter Eight:
Lecture 28: Currents and Magnetic Field: I
Catalogued parameters… Current sheet normal vector and velocity, derived using a timing analysis. Later used to calculate an accurate measure of current.
ICORR Technologies, Inc.
Monday, January 30th Key Question: How do the layers of the atmosphere affect us? HW: Read Chapter 15, Section 2, take notes and answer Self Check questions.
Pearson Prentice Hall Physical Science: Concepts in Action Chapter 21 Magnetism.
Study Guide Answers. Electric Field It can travel through empty space and matter.
1 Discussion about the mid-term 4. A high voltage generator is made of a metal sphere with a radius of 6 cm sits on an insulating post. A wire connects.
Electric Potential 2 q A C B r A B r path independence a a Rr VQ 4   r Q 4   R.
What is a geomagnetic storm? A very efficient exchange of energy from the solar wind into the space environment surrounding Earth; These storms result.
Basic Definitions Specific intensity/mean intensity Flux
HVDC Transmission.
Geology 5660/6660 Applied Geophysics 13 Apr 2016 © A.R. Lowry 2016 For Fri 15 Apr: Burger (§5.11) Last Time: IP (Induced Polarization) Induced.
Chapter 28 The Sun Section 2 Solar Activity Notes 28-2.
Introduction High Voltage!!.
Unit 9 Section 2: Solar Energy and the Atmosphere
Electromagnetic Methods (EM)
Applied Geophysics Fall 2016 Umass Lowell
Criteria for Cathodic Protection
Automatic Picking of First Arrivals
PRESENTATION ON AC & DC INTERFERENCE
Current Attenuation and ACVG Surveys Gary Moss
CHAPTER 6 Stray Current Interference.
Applied Electromagnetic Waves Notes 5 Poynting’s Theorem
Presentation transcript:

Towards an Enhanced Telluric Compensation Methodology Chijioke Ukiwe & Shamus McDonnell Hunter McDonnell Pipelines Services Inc. Presented at AUCSC 2011 by Gord Parker, C.E.T., CP2 Edmonton, Alberta, Canada

This Work This paper is a progress report of an ongoing R&D project to develop an enhanced Telluric and AC interference compensation methodology. Research commissioned by Spectrum XLI Partial funding from the Government of Canada This presentation was previously delivered at the NACE Northern Area Western Conference.

Telluric Current A telluric current (from Latin tellūs, "earth") is an electric current which moves underground or through the sea. The currents are extremely low frequency and travel over large areas at or near the surface of Earth. Telluric currents are also observed in the Earth's crust and mantle.

Telluric currents are primarily induced by changes in the outer part of the Earth's magnetic field, usually caused by interactions between the solar wind and the magnetosphere or solar radiation effects on the ionosphere.

Some Telluric Current Facts The magnitude varies, but can be in the order of 100's to 1000's of Amperes. Local variations in the conductivity of the Earth's crust affect the density of these currents as they follow the path of least resistance.   This effect can be used to detect the presence of low-conductivity ore bodies beneath the crust in geological surveys. Along with the currents induced in the Earth's crust, any man-made conducting objects on or beneath the Earth's surface will also have large currents induced in them.   This can cause power grid systems to trip from the overload. High sun-spot activities can buffet the Earth's magnetic field, causing fluctuations which in turn induces telluric currents on earth conductors, increasing the likelihood of such interruptions.

How do telluric currents affect pipelines? Magnetic field Earth’s geo-magnetic field The sun emits energy & Particles Voltage swings in CP systems during close interval survey CIS Induced electric field The DSTL theory proposes that telluric currents are produced when an induced electric field, caused by changing magnetic field outside the earth, drives an electric charge along the pipeline, which causes a movement of charges from end and a build-up at the other. Induced electric currents on pipelines Source: space weather Canada

V Telluric currents: economic importance = Possibility of Corrosion Voltage Time V Test Post CSE Difficulty to pipeline integrity assessment – if uncorrected could result in incorrect interpretation and improper adjustment of CP system Pipeline = Possibility of Corrosion Pipe-to-soil potential measurement

Telluric on pipe-to-soil potentials: practical example 5 Seconds grid 2 Seconds CP Interruption Cycle 40 Second Telluric Current Cycle Low frequency Temporal Voltage swing = DV at t for any pipeline location Telluric current frequency varies; cycle times of a few seconds to minutes.

AC Interference on pipe-to-soil potentials Multiple Voltage swings superimposed on the pipe-to-soil Potential: High frequency AC 50/60 Hz Low Frequency telluric 1/40th Hz 4 second grid 2 second CP Interruption Cycle

Telluric characteristics: Temporal AND Regional effects At the same moment in time Telluric Magnitude 500mV 400mV 300mV 100mV PIPELINE DISTANCE C D A B Regional Effects on pipeline structures on telluric variation: Valves, bends, rectifiers, anodes, insulating flanges Telluric Potential Variation up to ~100 mV/Km at same moment

Telluric characteristics: Temporal effects 2. Space weather effects At a given location along the pipeline, PSP changes with time 20+ mV/sec > 100mV / cycle telluric effect has been recorded!

What is “Telluric Compensation”? Voltage Time Time Voltage Exclusion of “Noise” on PSP Data during CIS

Basis for Telluric Compensation Stationary PSP data (from stationary data logger (SDL)) summed over time yields “stable” average PSP Comparable regional effects of telluric on PSP within several kms SDL PSP data can be used to correct for any PSP variation in close proximity PSP PSP

Average PSP? Use statistics carefully, considering duration of temporal effects, and size of data pool. Using data from a short time period, other than the actual survey period can result in error. There are three kinds of lies: lies, damned lies, and statistics. Benjamin Disraeli (1804 - 1881)

+ - Current Field Practices for Telluric Compensation Real-time telluric compensation; based on stationary reference electrode placed at start of survey. Data Logger + - V V SRE Telluric Pipe-to-soil potential variations are corrected real-time

X Current Field Practices for Telluric Compensation 1. Real-Time Compensation: pit-falls Unreliable representative average PSP Difference in regional telluric effects on pipe can render correction useless X High Telluric magnitude at A Error in compensation increases away from Stationary electrode SRE Suppressed Telluric magnitude at B A B

X Current Field Practices for Telluric Compensation Single Stationary Data Logger Compensation Post Processing For Compensation Reliable representative average PSP during survey Difference in regional telluric effects on pipe can render correction useless X Differences in regional telluric currents at A & B affect correction method A B SRE + SDL Suppression of Telluric magnitude at B

3. Multiple SDL Telluric Correction Current Field Practices for Telluric Compensation 3. Multiple SDL Telluric Correction A B C Approximately linear telluric profile at any Given time, “t” within pipe section, AB

Multiple SDL Telluric Correction: Underlying Assumptions Based on Distributed Source Transmission Line (DSTL) Theory SDL placement spacing ~ 6 – 8 km Electrical continuity of telluric currents = uniformity of soil and pipeline characteristics Statistical average PSP is calculated from pool of readings that span entire survey period.

Multiple SDL Telluric Correction SDL-B SDL-A

Multiple SDL Telluric Correction Enhancements Field work Enhancements Easier and faster Data Post-processing 3-4 SDLs Waveform Log = Strategic SDL Positioning And more reliable results!

Enhanced Telluric Compensation: unique advantage ~ capturing FULL telluric variation trend along pipeline Telluric Magnitude Pipeline A B C D

4 SDL Telluric Compensation Method: example

4 SDL Telluric Compensation Method: Practical safeguard against error! PSP Variation (mV) 496.1 500.0 502.3 503.5 SDL Placement (miles)

Enhanced Telluric Compensation: Fast Interruption cycle Telluric Variation can exceed 50 mV per second times cycle length = significant! Use of Fast Interruption Cycle of about ~1 second = ON:OFF (~3:1) = <50mV per cycle (simple 1 potential / cycle correction) Longer cycle makes it necessary for independent Telluric correction for ON and Instant Off PSP; different magnitude at start of cycle and end of cycle!

Multiple SDL Telluric Correction Enhancements: (2) Post-processing (a) Continuous waveform logging of the PSP Need to ensure the same readings are selected from both survey data and SDL – if different technologies used, errors can result

Multiple SDL Telluric Correction Enhancements: (2) Post-processing (b) Simple moving average system on SDL data before telluric compensation Careful and thorough Choice of each ON and OFF PSP data before Telluric correction using Simple moving averages Of telluric and high Frequency AC interferences

Multiple SDL Telluric Correction Enhancements: Final Post-processed data

… Even further telluric enhancements Recent advances in research holds promise for the use of telluric trends to forecast telluric magnitude over longer sections of pipelines = more strategic SDL placements and time of survey. Ability to compensate for high frequency interference; 50/60 Hz AC using high frequency stationary data loggers.

Conclusions The use of 3 ~ 4 Stationary data loggers to track telluric pattern and ensure accurate compensation Fast cycles are preferred to avoid under/over-compensation to either ON or OFF pipe-to-soil potential data Continuous waveform logging can enhance data accuracy Advanced statistical approaches can enhance post-processing and hence, overall pipeline integrity

The Authors are grateful to the National Research Council of Canada Acknowledgement The Authors are grateful to the National Research Council of Canada for financial support through an Industrial Research Assistantship fund

Questions?