BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen The Megaports Initiative in Antwerp.

Slides:



Advertisements
Similar presentations
RA (Regulatory Authority) - Nuclear and Radiation Safety Service Ministry of Environment Protection and Natural Resources PERSPECTIVES ON NUCLEAR.
Advertisements

A Service Disabled Veteran Owned Small Business. A FULL SERVICE ELECTRICAL CONSTRUCTION COMPANY.
…excellence through understanding The Impact of EDC on Contract Research Organisations, Current Monitoring and Site Roles Birant Osman MSc Group Manager,
Radioisotope Laboratory Techniques Day 2 Environmental Health & Safety Radiation Control & Radiological Services UNIVERSITY OF FLORIDA RADIATION SAFETY.
Fuel Smart System NIORDC
BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 19 October What is the Megaports Initiative and which are its objectives? The.
PVsurveys Independent Asbestos Surveyors May 21 st 2004 CAW 2002 Regulation 4 a duty to manage - not a duty to survey!
Brief Background on HIAPER Aircraft Instrumentation Solicitation (HAIS)  Measurement priorities for HIAPER established as a result of discussions held.
NAG Meeting October 29, Agenda Welcome New technical staff member – Amanda Berlin Dialog on Web Filtering Requirements E-Rate Opportunities.
How can IT help you today?. Agenda The Challenge Metric Construction Your Action Items How can IT help you today? 2.
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
Software Project Transition Planning
Gauges and well logging
Environmental Health and Safety Radiation Control and Radiological Services.
ISO 9000 Certification ISO 9001 and ISO
1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey.
Commander, Naval Installation Command (CNIC) N9, Child Youth Programs (CYP) plans to design, install, and maintain Closed Circuit Television (CCTV) systems.
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
1 Virtual Police Security System & Management Control May 2003.
Illinois Department of Transportation Emergency Management I-74 Reconstruction Project Peoria, Illinois ITS Midwest Annual Meeting February 7, 2006.
UNECE Group of Experts on Monitoring of Radiologically Contaminated Scrap Metal, First session 5-7 April 2004 Slide 1 NATIONAL COMMISSION FOR NUCLEAR ACTIVITIES.
Introduction of Sino-US Megaports Initiative DANG Xiaohong May, 2009.
Nuclear power fission fusion Uranium U U fusion Nuclear power station Releases heat Heat turns _____ Into steam The steam turns the.
How Megaports Screens ContainersSlide 1 How Megaports Screens Containers Asia Regional Technical Workshop on Megaports Initiative Bangkok, Thailand May.
Optimized IT Gae Lyn DeLand, IT Director In. March 15, 2007 IT Governance General Description: “This Bill consolidates information technology services.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
1 Security Integration and Esgraf sales presentation 01/2015.
Geneva, Switzerland5-7 April, 2004 Monitoring of radioactively contaminated scrap metal in Latvia A.Dreimanis (Radiation Safety Centre, Latvia)
Porta Optica Feasibility Study of OPTICAL GATEWAY to Eastern Europe POS Consortium Coordinator: Artur Binczewski (PSNC) presented by: Jacek Gajewski (CEENet)
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Port of Rotterdam.
Monitoring of Radiologically Contaminated Scrap Metal Czech experience Milan Hort State Office for Nuclear Safety Czech republic UNECE Group of Experts.
IAEA International Atomic Energy Agency IAEA and Nuclear Safety and Security Co-operation with the EU Geoffrey Shaw Representative of the Director General.
Case Study Computer Controlled Radiation Monitoring System
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
The RTD Group NORM in Scrap Metal... Richard van Sonsbeek Röntgen Technische Dienst bv Dept. Radiation Protection Services P.O. Box AB Rotterdam.
Berkeley Nucleonics Instrumentation Since 1963…. Management Team David Brown, President 15 Years, BA Management Mel Brown, Director of Finance 45 Years,
Welcome to the presentation from Bangladesh team. Welcome to the presentation from Bangladesh team.
© 2012 Delmar, Cengage Learning Chapter 12 Administrative Controls.
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
Rudan ltd. For efficient energy management. Our Vision With efficient management and application of new technologies, to become a leading company in the.
 Atomic Number  Protons + Neutrons = Atomic Mass.
Energy, Environment and National Security Directorate (EENS) Best Management Practices in the Experimental Safety Review Program Robert Doty Experimental.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Voting System Grant Program. Help America Vote Act  Provides funding to help accomplish the various requirements of the Act.
Assessing and Managing Risks on International Projects It takes a village…
Uses of Radioactivity • Measuring the thickness of foil
Nuclear Safety & Nuclear Security Synergy By Dr. Lucian BIRO Director General ROMANIA National Commission for Nuclear Activities Control International.
Berkeley Nucleonics Instrumentation Since 1963…. Management Team David Brown, President 15 Years, BA Management Mel Brown, Director of Finance 45 Years,
Implementation of Megaports in Belgium. Partners in the Initiative Why Antwerp? - volume - Logistical importance Why Megaports? - European context - Commercial.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
Presented by; Capt. Ravi Jayawickreme WHAT IS THE SIGNIFICANCE OF MEGAPORTS IN COLOMBO Megaports - A system of equipment installed, people trained, and.
Expected Operational Costs of Radiation Detection SystemSlide 1 Expected Operational Costs of Radiation Detection Systems Asia Regional Technical Workshop.
REPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING, SLOVENIAN NUCLEAR SAFETY ADMINISTRATION.
Scientific Engineering Center ''Nuclear Physics Research (''YAFI'') St-Petersburg, RUSSIA 2014.
Activity concentration determination of NORM radionuclides in large quantity containers. Dr. Wouter Schroeyers (project coordinator NuTeC-NORM) Dr. Tim.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
1 Alarm System Orientation Welcome Training & Certification Committee Your Instructors Are: 2.
Food Suppliers Implementation of EDI &PAV March 2010
Chapter 12 Administrative Controls
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
A practical approach Dr. Florin T. Padeanu
Perfect Telecom Services Managed Services &
Chapter 12 Administrative Controls
ICAS Alarm Upgrade ICAS Alarm Upgrade Project
ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress.
Measurement 2 Measurement 3 Condition Monitoring Integration with Embedded Software and On Key Hardware’s embedded software/analysis tool and specialist.
SHARE Special Project SHARE Benefits Optimization
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen The Megaports Initiative in Antwerp

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 24 November 2004 : Memorandum Of Understanding Detection of the illicit trafficking in radioactive or nuclear material in megaports 1. What is the Megaports Initiative and what are the objectives ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen Radiation portal monitors 2. How do we achieve the objectives ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 2. How do we achieve the objectives ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 5 2. How do we achieve the objectives ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen : - delivery and installation off all hardware TSA Survey MeterPersonal Radiation Detectors (pagers) Radioisotopic Identifiers (RIID) - development, delivery and installation of all software - comprehensive maintenance the first three years - staff training 3. Who is responsible for what in this project ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen : - payment of VAT and other taxes due (> EUR) - deployment of staff : over 100 customs officials - leasing of the exclusive fibre optics backbone : EUR / year - maintenance contract after three years - operational costs (electricity, use of concession part for temporary storage, transport in case of third inspection,... ) 3. Who is responsible for what in this project ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen Phase 1 container proceeds through portal for inspection no alarm Alarm raised Video images and radiation data sent to CAS and LAS “hold” message to terminal operator alarm resolved “release” to terminal operator container released alarm not resolved Phase 2 4. What happens when an alarm is raised ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen Phase 2 container set up for inspection CAS personnel comes on the spot Inspection and isotope identification on the outside of the container by CAS personnel alarm resolved “release” to terminal operator container released alarm not resolved and further investigation required Phase 3 4. What happens when an alarm is raised ?

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen Phase 3 container is transferred to the central site (CAS) Acknowledged expert comes on the spot Inspection and isotope identification inside the container alarm resolved container released alarm not resolved Isolation of the source of radiation possible contacts with the Public Prosecutor, FANC. etc... depending on the conclusions 4. What happens when an alarm is raised ?