SPP West Shadow Operations

Slides:



Advertisements
Similar presentations
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Advertisements

© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
POTF Status update.
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
Practice Insight Instructional Webinar Series Eligibility Manager
Extended Connectivity Test Overview May 16 th, 2013.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
PacifiCorp-CAISO EIM Initiative Overview
Next-day Study Task Force Steve Ashbaker Director Event Analysis & Situational Awareness Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C.
Researcher User Manual for Event Forms. Accessing the Researcher’s Portal The Researcher’s Portal is available through the Research website at the following.
Division of Student Assessment IAA SchoolSuccess for Coordinators Illinois State Board of Education 100 North First Street, E-216 Springfield, Illinois.
PHAAUG – Peak Reliability
Joe Mercer Operations Planning Engineer III Operation Planning Analysis PHAAUG Meeting Mar 12 th, 2015.
WIRAB Comments to the Peak Reliability Interim Board Doug Larson, WIRAB December 4, 2013.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009.
RESEARCH AND RESOLVE Professional Claim Denials HP Provider Relations/June 2014.
1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
TEST SECURITY Attend all district coordinator training Watch all TEA TETN’s Study the District Coordinator Manual and the Test Security Supplement 1.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Readiness Liaison Update Erin Jester September 26, 2013.
Compliance Program Update Lisa Milanes Manager of Compliance Administration.
Transition Plan Network Operations Model Change Requests 5/26/2010.
ESDIS DOI STATUS DOI process in operation since 2010 Process fully automated (manual review) Implement improvements to the process as we learn along the.
FRCC Voice Communications OBJECTIVES FRCC Regional Voice Communications Procedure – Review the New FRCC Handbook Document Review Voice Comm. Requirements.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
SchoolSuccess for Coordinators
What every benchmarking coordinator needs to know
A Software Installation Duet
EPC Fundamentals E-rate Program Applicant Training
Phase Angle Limitations
Metrics Replication Presentation for Maryland Staff September 26, 2002
Brett Wangen Director of Engineering, Peak Reliability
Transmission Outage Coordination
Mod_06_12 Improved Efficiencies in LCF Process 31 January 2012
Path Operator Implementation Task Force
The Web to Print Process
SmartJCL – How to replace PRO/JCL
Western Electricity Coordinating Council
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Test Administration Q&A Session for the ACT
Welcome to the Mississippi Test Administration Q&A Session for the ACT
SPS Project Benefits Advocates Web Series #1: Intro to SPS Benefits Project June 4, 2015.
EMIS Overview Student.
David W. Hutchison, SC December 7, 2017
Solar Eclipse Overview August 2017
Results-Driven Priorities Application Training
Mgr. Interconnection Reliability Initiatives
IID Generating Facility Interconnection Process
Mgr. Interconnection Reliability Initiatives
WECC RC Forum October 12, 2018.
Jason Ausmus, Jason Smith and Akshay Shivaram Peak Operations Planning
SPR&I Regional Training
Enhanced Curtailment Calculator (ECC)
E-RATE PROGRAM TRIBAL APPLICANT TRAINING
PEAK’s RMTNET Tool Sarma (NDR) Nuthalapati, Principal NetApps Engineer
Peak Reliability Transitional RC Overview RC User Group May 3, 2018
Coordinate Operations Standard
PacifiCorp-CAISO-NVE EIM Initiative Overview
MINISTRY OF ECONOMY AND FINANCE
Eric Whitley/Steve Ashbaker
ESC Use Case Review Joint OASIS Implementation Task Force Paul R
WECC RC Forum October 12, 2018.
System Review Work Group Update to TSS
Peak Reliability IRO Webinar
SmartJCL – How to replace PRO/JCL
RC Transition and Tools (WIT, ECC) Update
Presentation transcript:

SPP West Shadow Operations Oct. 7 – Dec. 3, 2019

Shadow Operations Overview Stage 2 Nov. 1 Dec. 3 Stage 1 Oct. 7 Oct. 30 Shadow Operations Overview SPP/Peak Coordination Stage 1 – Listen-only mode Stage 2 – SPP more involved in leading discussions SPP to participate in daily calls Peak to conference in SPP on discussions with BA/TOPs as time allows SPP RC Customer Tasks Parallel data submission includes load forecasts, generation forecasts, outages, ratings changes, and OPA results. Mostly “Business as usual” Participate in SPP-specific application testing as requested Assist SPP with data validations SPP Tasks Review Peak’s OPA for comparison and discuss major discrepancies Review RC customer OPA results Monitor Peak’s HAA, compare RTCA results, and discuss discrepancies Perform data spot-checks and verify tools function appropriately In all situations where a TOP or BA needs to contact the RC for mitigating system issues or reporting forced outages, the entity should always contact Peak first. Peak will then conference in SPP if time allows. Note

Parallel Data submissions Load and Generation Forecast via EIDE Format Submit as soon as possible but no later than 10/1/2019 Outages via CROW SPP manually enters existing COS outages in CROW from 10/1/2019 – 10/6/2019 Customers begin parallel submissions 10/7/2019 Facility Ratings Changes via Ratings Submission Tool Validate ratings and submit any changes as soon as possible Post OPA results to GlobalScape Submit as soon as possible but no later than 10/7/2019