Master Production Scheduling (MPS)

Slides:



Advertisements
Similar presentations
Master Scheduling and Rough-Cut Capacity Planning
Advertisements

Aggregate Planning.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Manufacturing’s Objectives
Managing Production across the Supply Chain
Master Production Scheduling (MPS) – Basic Techniques pom
Perencanaan Kapasitas Produksi
Supplement D Master Scheduling and Rough-cut Capacity Planning
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
MGMT Materials Management Systems Master Production Scheduling Chapter 3.
DOM 301 : Operations Management Practice
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Ardavan Asef-Vaziri Systems and Operations Management
Product Mix & Master Production Scheduling
Materials Requirements Planning
Master Scheduling Chapter 3.
Operations Management Material Requirements Planning
Operations Management
11 Master Scheduling CHAPTER
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Aggregate Planning.
Materials Planning & Control. Introduction With the development of ‘integrated materials management’ and ‘supply chain management’, material managers.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
Session 3 University of Southern California ISE514 September 1, 2015 Geza P. Bottlik Page 1 Outline Questions? Sales and Operations Planning Examples Qualifiers.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Production Planning and Control
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Order Promising in Microsoft Dynamics ® AX 2012 Order Promising.
BUAD306 MRP.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Master Production Scheduling (MPS)
FDFPLSCP4A Manage and schedule production
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
Introduction to Materials Management
Master Production Schedule
BUAD306 MRP/ERP.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Lecture 8 Master Product Scheduling (Revisited)
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Master Production Scheduling
Chapter 5 Master Production Scheduling
13 Aggregate Planning.
CHAPTER 14 MRP and ERP.
MATERIAL Requirements planning MRP
Beni Asllani University of Tennessee at Chattanooga
Sales and Operations Planning
Introduction to Materials Management
Dr Sh Salleh bin Sh Ahmad
Material Requirement Planning (MRP)
Resource Planning Chapter 16
Chapter 14 Dependent Demand
Manufacturing’s Objectives
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Master Production Scheduling (MPS) MPS states the requirements for individual end items by date & quantity Limited by the APP & must “disaggregate” the APP Master planning seeks to plan & control the impact of independent demand on material & capacity OMGT6743

Master Production Scheduling (MPS) MPS is a vital link between sales & production Makes possible valid order promises Represents a contract between sales and production. OMGT6743

MPS Inputs Inputs to the MPS include Forecast APP Orders from customers &/or additional independent demand Inventory levels Capacity constraints OMGT6743

MPS Objectives The objectives of the MPS are to Maintain the desired level of customer service Make the best use of resources Keep inventories at the desired level OMGT6743

MPS Objectives & Preparation Maintain the desired level of customer service Make the best use of resources Keep inventories at the desired level Make a preliminary MPS - disaggregate the APP Perform rough-cut capacity planning Resolve differences OMGT6743

Rough-cut Capacity Planning Rough-cut capacity planning checks whether critical resources are available to support the preliminary master schedule A resource bill shows the time required for individual items on a critical resource What are some possible critical resources? OMGT6743

Resolving Differences Available capacity must be equal to or greater than required capacity If required capacity exceeds available capacity Capacity must be increased or Plan must be altered How can capacity be increased or demand be decreased? OMGT6743

Resolving Differences The MPS must be judged by three criteria Resources use. Is the MPS within capacity restraints in each period of the plan? Does it make the best use of resources? Customer service. Will due dates be met and will delivery performances be acceptable? Cost. Is the plan economical, or will excess cost be incurred for overtime, subcontracting, expediting, or transportation? OMGT6743

MPS & Sales MPS is not a sales forecast, it is instead a forecast of production. It may not necessarily be what we want; it should be what we can do. MPS must be realistic & achievable; otherwise, the plan fails, deliveries are not met, & manufacturing has to react to circumstances rather than planning for them OMGT6743

MPS and Delivery Promises Customer Orders Available-to- Promise Time Units Production Capacity or Inventory As orders are received, they “consume” available production and inventory Any part not consumed is available-to-promise OMGT6743

Available-to-Promise Available-to-Promise is the uncommitted portion of a company’s inventory & planned production maintained in the master schedule to support customer order promising the uncommitted inventory balance in the first period & is normally calculated for each period in which an MPS receipt is scheduled APICS Dictionary, 8th edition OMGT6743

Available-to-Promise ATP calculation assumes that the entire ATP will be sold before the next scheduled receipt When calculating ATP, consider all orders until the next scheduled receipt, e.g., ATP for period 1 = on hand - customer orders due b4 next MPS scheduled receipt ATP for periods 2, 4, and 6 = MPS scheduled receipt - customer orders due b4 next MPS scheduled receipt OMGT6743

Available-to-Promise On hand = 200 units Period 1 2 3 4 5 6 Customer Orders 160 20 50 MPS Scheduled Receipts 200 Available to Promise 40 OMGT6743

Available-to-Promise On hand = 200 units OMGT6743

Available-to-Promise On hand = 200 units OMGT6743

Planning Horizon The planning horizon is defined as “the amount of time the master schedule extends into the future. This is normally set to cover a minimum of cumulative lead time plus time for lot sizing low-level components and for capacity changes of primary work centers or of key suppliers.” APICS Dictionary, 8th edition OMGT6743

Planning Horizon What is the minimum planning horizon in this example? B A C D E Lead Time = 6 weeks = 2 weeks = 5 weeks = 8 weeks = 16 weeks What is the minimum planning horizon in this example? OMGT6743

(Changes constrained by production plan) Time Fences and Zones Actual Orders (Emergency Changes Only) Frozen Slushy Liquid Actual and Forecast (Trade-offs) Forecast Only (Changes constrained by production plan) Due Date Demand Time Fence Planning 2 weeks 26 weeks OMGT6743

Summary MPS Major Functions Forms the link between APP & what manufacturing builds Plans capacity requirements - the MPS determines the capacity required Plans material requirements - the MPS drives the (MRP) Keeps priorities valid - the MPS is a priority plan for manufacturing OMGT6743

Summary MPS Links Sales & Production Aids in making order promises - the MPS is a plan for what is to be produced & when Informs sales & manufacturing when goods will be available for delivery Creates a contract between marketing & manufacturing - an agreed-upon plan OMGT6743

Summary The MPS must be realistic & based on what production can & will do, if not, Resource overloads or underloads occur Unreliable schedules result & delivery performance suffers High levels of work-in-process (WIP) inventory build-up Customer service is poor Planning system loses credibility OMGT6743