Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018

Slides:



Advertisements
Similar presentations
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
S A Griffiths CM42 June 2015 Electrical & Control.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Teleconf ACS – FREIA 28th March 2017
Cryoplant Controls Installation
Deadline for Requisitions Payment Processing Date
2K Cold Box FDR Introduction
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own.
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Teleconference ACS – FREIA 17th October 2017
Deadline for Requisitions Payment Processing Date
Calendar 2017.
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
Teleconference ACS – FREIA 20th February 2018
13-block rotation schedule
Potential Milestones A timeline to finish in one year
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
CryoPlant Commissioning
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
| January Sunday Monday Tuesday Wednesday Thursday Friday
LCLS-II Cryoplant Controls Workshop.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
MONTHS OF THE YEAR January February April March June May July August
Teleconference ACS – FREIA 19th June 2017
McDonald’s calendar 2007.
UPPSALA UNIVERSITY_GERSEMI PROJECT
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Habitat Changes and Fish Migration
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018

B165: Project Status Cryogenic Distribution System (CDS): The preliminary design is complete, detailed design and manufacture of the main components is underway. Cryogenic Distribution System (CDS): Contract placed with AS Scientific (UK); Delivery - mid March 2019; Design review for LHe CDS undertaken 5th December; LN2 CDS under production – Delivery February 2019.

B165: Project Status Electricity and Control: 20 m³ LHe Dewar: Delivered; Installation delayed to January 2019 due to civil works. B165-GMP: GMP added to CDS contract; Delivery - mid March 2019. Electricity and Control: No delays; Delivery - B165 Shut Down. GMP for GHe buffers: Design completed; Under construction.

B165: Project Status Civil Works: Relocation of GHe Buffers and LN2 Dewar: New concrete slab (Slab 1) is completed and LN2 Dewar moved to new position. Support structure for LHe Dewar to enable Gravity filling: Installation delayed to Jan 2019; Hole in wall of B165 for CDS planned for this week. Operation to advise: 1/ Do they need to use the LHe atmospheric heater? 2/ Do they need to retain a connection to the compressor LP?

B165: Project Status - Planning Shut down of Central Liquefier (B165): Start Date – Monday 1st April 2019; Duration – 10 Weeks, ending 7th June 2019. CDS Delivery, 22 March 2019 Shut Down Operation to advise: 1/ Do they need to use the LHe atmospheric heater? 2/ Do they need to retain a connection to the compressor LP?

B253: Project Status Jumbo Cylinders: Civil Works: Contract placed with EKC (DE/IN) Delivery delayed to May 2019: Derogation required to extend use of Batteries at reduced pressure; Problems with the manufacture of seamless tubes. Civil Works: Work is ongoing to complete the slab. Completion delayed to January 2019. Operation to advise: 1/ Do they need to use the LHe atmospheric heater? 2/ Do they need to retain a connection to the compressor LP?

B163: Project Status Design of the B163 system is ongoing: Final PID: Sizing of valves and piping complete – EDMS 2032387 Instrumentation List: Underway, completion planned for early Jan 2019 Interfaces: Integration: CDS – complete Warm infrastructure – 30% complete – Delivery early 2019 (CRG) Cryogenic Infrastructure Defined FRESCA Defined (as current) Small Cryostats FRESCA2 Main Line Defined (Interface drawing MEYQLIH_0003) N2 Exit Lines To be defined by MSC by end 2018 Operation to advise: 1/ Do they need to use the LHe atmospheric heater? 2/ Do they need to retain a connection to the compressor LP?

Manufactured and delivered to CERN B163: Project Status Milestones: Integration: Summary: Design of warm infra and WPU delayed by 1 month. No impact on overall planning; IT-4490 complete – Contract awarded to AS Scientific (UK); DO-31852 for cryogenic valves closes 21st December 2018. Component Design Tendering Delivery CDS Complete September 2019 Warm Infrastructure January 2018 February 2019 May 2019 WPU WPU Heater Manufactured and delivered to CERN 15 kW Heater Control and Electricity April 2019 N/A B163 Shut Down Operation to advise: 1/ Do they need to use the LHe atmospheric heater? 2/ Do they need to retain a connection to the compressor LP?

Coldbox and FRESCA Shut Down B163: Project Status - Planning It is proposed the shut down of B163 will have two phases: Coldbox and FRESCA – 17 weeks from 5th August, ending 29th November 2019. LHe supply to small cryostats will be maintained using local dewar. All B163 – 5 weeks from 21st October, ending 22 November 2019. Intention is to begin operation of small cryostats and FRESCA independent of commissioning of FRESCA 2. MSC test plan not confirmed. CDS Delivery , 16th September 2019 Complete Shut Down Operation to advise: 1/ Do they need to use the LHe atmospheric heater? 2/ Do they need to retain a connection to the compressor LP? Coldbox and FRESCA Shut Down