Stormwater Construction General Pemit (CGP) TXR150000

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
What is NPDES? “National Pollutant Discharge Elimination System”
Stormwater 101: How to stay out of trouble with TDEC.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
2015 TCEQ Environmental Trade Fair May 6, 2015 Dan Siebeneicher
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Introduction to Construction General Permit Inspections.
TCEQ Construction General Permit Renewal TXR April 23, 2008 Houston Land/Water Sustainability Forum.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Texas Pollutant Discharge Elimination System Stormwater Construction General Permit (CGP) 2013 TCEQ Environmental Trade Fair April 30 – May 1, 2013 Lindsay.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
An Overview of our Community’s Stormwater Management Program
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Water Quality Seminar September 23-24, 2015 Hanne Lehman Nielsen and Rebecca Villalba.
Texas Pollutant Discharge Elimination System (TPDES) Stormwater Construction General Permit (CGP) 2016 TCEQ Environmental Trade Fair May 4, 2016 Dan Siebeneicher.
Texas Pollutant Discharge Elimination System Stormwater Multi-Sector General Permit (MSGP) TXR Overview and Renewal May 19, 2016 Rebecca L. Villalba.
Texas Pollutant Discharge Elimination System Stormwater Multi-Sector General Permit (MSGP) TXR Overview Lindsay M. Garza and Ryan Bucek Texas Commission.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Current NPDES General Permits are available
Stormwater Construction General Permit (CGP) TXR150000
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
Ohio Department of Transportation
Environmental Rule 327 IAC 15-5 to a General Permit
MS4 On-site evaluations & common findings
Texas Pollutant Discharge Elimination System Stormwater Multi-Sector General Permit (MSGP) TXR Dan Siebeneicher Texas Commission on Environmental.
TPDES Construction Management at the City of Laredo
Lower Rio Grande Valley
Summit County MS4.
Sacramento County Stormwater Quality Program
EPA Public Meeting Dallas, Texas May 10, 2005
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
Stormwater Commitments
Stormwater Pollution Prevention Plans
Ohio EPA, Division of Surface Water
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
Rule 5 and 13 Conversion Impacts
Flow chart to determine whether coverage is required
TPDES Construction General Permit Compliance
Wastewater Permitting Updates
Texas Pollutant Discharge Elimination System (TPDES) Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates TCEQ Trade Fair May 15-16, 2018 Hanne.
Presented by: Jack Higginbotham
Sacramento County Stormwater Quality Program
Wastewater Permitting Updates
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Stormwater Construction General Pemit (CGP) TXR150000 Lindsay Garza Stormwater Team – Water Quality Division Texas Commission on Environmental Quality

Construction General Permit - TXR150000 Authorizes the discharge of stormwater runoff associated with small and large construction sites and certain non-stormwater discharges into surface water in the state. Effective March 5, 2018 - CGP expires five years from the permit effective date All active authorizations expire on the same date the general permit expires

CGP Authorized Discharges Stormwater associated with construction activity & construction support activities Certain non-stormwater discharges uncontaminated water used to control dust uncontaminated air conditioning condensate

Construction Activity What is Construction? Clearing Grading Excavating, or Similar activities that disturb / expose soil Demolition, infilling pits, and stockpiling soil for construction What is not Construction? Certain routine maintenance activities Routine grading of roads Asphalt overlay of roads Routine clearing of ROW Agricultural land disturbance Demolition Linear Projects

disturbing five acres or more Disturbing an acre or more but less than Construction Site - Land Disturbance disturbing five acres or more Large Construction Disturbing an acre or more but less than five Small Construction

Operators – Large Construction PRIMARY operational control over construction plans and specifications – including ability to make changes OR day-to-day operational control of activities – authorized to direct workers at site to carry out activities to comply with permit conditions

Before the site discharges Notice of Intent (NOI) completed & submitted Stormwater Pollution Prevention Plan (SWP3) developed, implemented & maintain copy on-site 2 1 3 Site Notice(s) post primary/secondary operator site notice

Stormwater Pollution Prevention Plan (SWP3) Site Map Pollution prevention procedures Estimated dates of construction activities Description of stormwater controls Procedures for inspections, maintenance, and corrective action

CGP and Municipalities If discharging to gutters, streets, channels, ditches or any other Municipal Separate Storm Water Sewer System (MS4) – operators must submit a copy of each of these forms to the MS4 operator   NOI NOC NOT A Notice of Change is required to be submitted for making updates, changes, or corrections to an NOI or Waiver as required in the general permit.

Small Construction Sites Activities disturb an acre or more but less than five Permit Requirements: -preparation & implementation of SWP3 -small construction site notice -notify MS4 operator Not required to submit: -Notice of Intent -Notice of Termination

Disturb less than an Acre If the project site disturbs less than 1 acre and is not part of a larger common plan of development, coverage under the general permit is not required. Requirements: -implementation & maintenance of best manageable practices - notify MS4 operator

Terminating Coverage The NOT must be submitted to TCEQ, and a copy of the NOT provided to the operator of any MS4 receiving the discharge , within 30 days after any of the following conditions are met: final stabilization has been achieved on all portions of the site that are the responsibility of the operator; b) a transfer of operational control has occurred; or c) the operator has obtained alternative authorization under an individual TPDES permit.

Terminating Coverage Final stabilization must be achieved prior to termination of permit coverage. All soil disturbing activities at the site have been completed and a uniform perennial vegetative cover with a density of at least 70% of the native background vegetative cover This does not include areas with permanent structures Large & Small Construction Operators must : Remove temporary Best Management Practices Remove site Notice(s) Small Constructions sites do not need an NOT. that is, evenly distributed, without large bare areas

Oil and Gas Activities & Construction The CGP does not authorize discharges from construction activities associated with the: exploration, development, or production of oil or gas or geothermal resources including construction associated with the transportation of crude oil or natural gas by pipeline. Operators of these construction activities may need to obtain permit coverage from the U.S. EPA and the Texas Railroad Commission If the Construction activity is associated with the production or exploration of oil and gas, the project may be under the jurisdiction of the Texas Railroad Commission  and you may need authorization under the National Pollution Discharge Elimination System program  These discharges are not under the authority of the TCEQ. If coverage is required, operators of these construction activities may need to obtain permit coverage from the U.S. EPA and the Texas Railroad Commission

Applications via ePermits Applications must be submitted using the State of Texas Electronic Reporting System (STEERS) at: https://www3.tceq.texas.gov/steers/ Electronic filing is available for the following: -Notice of Intent -Notice of Termination -Notice of Chance -Low Rainfall Erosivity Waiver

Water Quality General Permits & Registration Search Track the status of applications for general permits at: http://www2.tceq.texas.gov/wq_dpa/index.cfm TXR150000 - Construction (NOI & Waiver) Search for authorizations or applications under a specific general permit or for a specific registration type. Permittee/Registrant Name: Site Name on Authorization: Street Name: County:

2018 CGP Changes to NOI Estimated start date Estimated end date Concrete Truck Washout - For Stormwater runoff from the concrete batch plants Revised the benchmark monitoring level for Total Suspended Solids (TSS) from 100 milligrams per Liter (mg/L) to 50 mg/l. - Added clarification that posted small construction site notices may have a redacted signature if there is an original signed and certified copy of a site located at the site. - Added clarification in the impaired waterbodies section that references the CWA 303 (d) List and the Texas Integrated Report.

TCEQ Stormwater Program Contacts For questions regarding your STEERS account and technical difficulties with e-NOI: (512) 239-6925 For questions about the application process, contact the Stormwater Processing Center: (512) 239-3700 Other questions including technical, contact the Small Business and Local Government (SBLGA) Hotline: 1-800-447-2827

TCEQ Stormwater Team Members Rebecca L. Villalba, Team Leader Lindsay Garza, Work Leader Hanna Lehman Nielson Dan Siebeneicher Lili Martinez Macayla Coleman TCEQ Water Quality Division (512) 239-4671 SWGP@tceq.texas.gov