FROM THE BASIN… TO THE WATERBODIES

Slides:



Advertisements
Similar presentations
Municipal & Industrial Regulations. Revised Risk Assessments Status and Risk Measures.
Advertisements

Barrow Owenass Triogue Water Management Unit Action Plan Name Barrow Owenass Triogue Water Management Unit Area328 km 2 River Basin DistrictSouth Eastern.
How close are we in the Water Framework Directive’s Implementation ? Paul C.M. Frintrop Institute for Inland Water Management and Waste-Water Treatment.
GIS development. Danube Commission+ISRBC meeting Sava GIS Sava GIS establishment –Performed in accordance with the Sava GIS Strategy EU WFD INSPIRE Directive.
Italian Committee of United Cities (CICU) PHARE - twinning Project SK02/IB/EN01 Slovak Hydrometeorological Institute PRP as a tool for: Reduce overall.
Final Conference June Maastricht, The Netherlands 1 Case Study: Kłodnica catchment, (Odra river basin) Poland Janusz Krupanek Institut for Ecology.
Extension of the EEA European Topic Centre’s Work Program to the West Balkan Countries in the field of water Norman Green, NIVA Nov 2006, Belgrade.
Drish Water Management Unit Action Plan Name00Drish Water Management Unit Area205 km 2 River Basin DistrictSouth Eastern RBD Main CountiesTipperary Protected.
Which role for economics in the implementation of the EU Water Framework Directive ? Arnaud Courtecuisse Artois-Picardie Water Agency Miedzyzdroje, 23.
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
Monitoring Programme Design in Transitional and Coastal Waters - Classification Issues Dave Jowett, Coast Group Chair and NEA GIG Co-ordinator CIS Workshop.
Multeen Water Management Unit Action Plan NameMulteen Water Management Unit Area182 km 2 River Basin DistrictSouth Eastern RBD Main CountiesTipperary Protected.
THE CHARACTERISATION OF A RIVER BASIN DISTRICT Case study on the construction of the baseline scenario Inspired from the Oise case (F) Most elements picked.
Slaney Upper Water Management Unit Action Plan NameSlaney Upper Water Management Unit Area260 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWicklow,
Burren Water Management Unit Action Plan NameBurren Water Management Unit Area180 km 2 River Basin DistrictSouth Eastern RBD Main CountiesCarlow Protected.
MODULE 1 Water Framework Directive, Relation of WFD with Daughter Directives, River Basin Management Planning, Water Bodies, Typology, Classification River.
Clodiagh North Tipperary Water Management Unit Action Plan Name Clodiagh North Tipp Water Management Unit Area258 km 2 River Basin DistrictSouth Eastern.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
COMMON IMPLEMENTATION STRATEGY Horizontal Guidance on Water Bodies.
Austrian Approach for Identification of Water Bodies Workshop on Identification of Surface Water Bodies Brussels, 25/26 September 2003 Birgit Vogel Austrian.
Slaney Lower Water Management Unit Action Plan Name Slaney Lower Water Management Unit Area417 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWexford,
Colligan Mahon Water Management Unit Action Plan NameColligan Mahon Water Management Unit Area641 km 2 River Basin District South Eastern RBD Main CountiesWaterford.
The EEAs assessment of the status of Europe’s waters Peter Kristensen Project manager Integrated Water Assessment, European Environment Agency.
Nore Estuary Water Management Unit Action Plan Name Nore Estuary Water Management Unit Area129 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny.
Stradbally Water Management Unit Action Plan NameStradbally Water Management Unit Area123 km 2 River Basin DistrictSouth Eastern RBD Main CountiesLaois.
DGALN - Direction de l'Eau et de la Biodiversité London meeting 11st december Mixing zones Guidance Strategies to reduce mixing zones Y. Aujollet.
EEA water report 2012 Upcoming EEA report state of our water environment 2012 In support of the Commission Report on WFD implementation Peter Kristensen.
Progress and challenges of a transboundary cooperation Dr. Adam Kovacs International Commission for the Protection of the Danube River (ICPDR) Status of.
Building WFD into impact assessment Richard Sharp Geomorphology IEMA webinar Thursday 31 March 2016.
Thematic assessments based on results from RBMPs Coastal and transitional ecological status & related presures Inland surface waters Hydromorphological.
Identification on Significant Pressures - Surface Water Bodies
Reducing impacts of the Danube River Basin on the Black Sea
Environmental policies in Europe
Relationship between EUROWATERNET and the Water Framework Directive, and for broader water reporting Steve Nixon ETC/WTR.
REFCOND EU Water Framework Directive project funded by the European Commission DG Environment Included in the EU Water Directors “Common Strategy on.
Groundwater legislative framework
Restoration target values?
Daughter Groundwater Directive
Philippe Quevauviller, Johannes Grath
Directive 2006/118/EC Short overview
The design of the monitoring network for lakes and rivers in Finland
Good groundwater chemical status
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
Ecological Quality Assessment in the Water Framework Directive
Directive 2006/118/EC Short overview
Monitoring, assessing and classifying the environment
Expert Advisory Forum on
Preliminary feedback on analysis of Article V reports
Commission's activities
Update on RBMP&FRMP adoption and reporting Assessment of RBMP&FRMP
CIS-Workshop on River Basin Management Plans 8 and 9 May 2006 Bonn
Marine planning and the world according to the Environment Agency 23 November 2010 Lindsey Tucker, marine manager.
on a protocol for Intercalibration of Surface Water
Project 2.7 Guidance on Monitoring
Meeting of the WFD CIS Working Group on Ecological Status (ECOSTAT)
EP Pilot project Comparative study of pressures and measures
Lessons learned from WFD reporting and follow-up
Common Implementation Strategy for the Water Framework Directive
3rd meeting, 8 March 2006 EEA Copenhagen
Preparation of the second RBMP in Romania
IMPRESS Guidance and Policy Summary Water Directors Copenhagen, 21-22nd November 2002 Working Group leaders: Volker Mohaupt, Umwelt Bundes Amt Isobel.
DG Environment, Unit D.2 Marine Environment and Water Industry
A progressive but still unfinished business
WISE – Freshwater WFD visualization tool
Guidance document on the identification of water bodies
Workshop WFD and Hydromorphology Brussels, June 2012
A general introduction
Good groundwater chemical status
Assessment of Member States‘ 2nd River Basin Management Plans
HELCOM Meeting May 2019 OSPAR’s monitoring and assessment in reducing discharges of radioactive substances to the North-East Atlantic Kinson Leonard (Vice.
Presentation transcript:

FROM THE BASIN… TO THE WATERBODIES L D KOBLENZ Philippe MAIRE Agence de l’eau Rhin-Meuse Pilot for the Integrated Testing within the International Commissions for the Protection of Mosel and Saar (CIPMS/IKSMS) 1

FROM THE BASIN… TO THE WATERBODIES Basin < 10km² 2

EAST CALCAREOUS COASTS TYPOLOGY EAST CALCAREOUS COASTS VOSGES GRANITIC MOUNTAINS 2 ECOREGIONS among +/- 30 SALMONID TYPE CYPRINID TYPE SMALL RIVER LARGE RIVER ( INTERMEDIATE TYPE ) ( MIDDLE RIVER ) 3

EAST CALCAREOUS COASTS TYPOLOGY VOSGES GRANITIC MOUNTAINS EAST CALCAREOUS COASTS Merging of same typed and contiguous stretches Adjustment to the limit to avoid a too much small WB 4

IN ACCORDING TO NATURAL CRITERIA DELINEATION OF WBs IN ACCORDING TO NATURAL CRITERIA EAST CALCAREOUS COASTS VOSGES GRANITIC MOUNTAINS WB1:L/CYP/VG WB2:S/SAL/VG WB4:L/CYP/ECC WB3:S/SAL/VG 5 TOWARDS QUALITY STATUS….

QUALITY CURRENT STATUS - 2004 BAD POOR MODERATE GOOD HIGH QUALITY Identification of the significant pressures (WFD, Annex II, §1.4) NO GOOD STATUS GOOD STATUS Assessment of Impact (WFD, Annex II, §1.5) Checking no significant pressure ? 6

….TOWARDS BASELINE SCENARIO PRESSURES ANALYSIS... Breeding: Current Action Plan: to reduce emissions and losses of organic matter by 80 % before 2007. Waste Water: 7 000 inhab/eq: Action Plan to reduce discharges of P and N, in compliance with WWTP Directive. Chemical Plant: Action Plan to reduce organic pollution, but unable to reduce emissions of hazardous substances significantly. ….TOWARDS BASELINE SCENARIO 7

Scenario following Current Action Plan 2004 STATUS 2015 STATUS Provisional limits Scenario following Current Action Plan Non significant size --> negligible designation of WBs - at risk - or - not at risk- RESULT WB 1.2 WB 2.1 WB 1.3 WB 2.2 WB 3 WB 4 WB 1.1 8