IOT operation in the SPS Long term experience TWC 800 MHz

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

IOT Measurements & Amplifier Improvements at Diamond
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
2013 Microwave Service Training All models. Samsung HA Warranty ALL Warranties are subject to change, always verify. 1 Year Parts & Labor Base Warranty,
THALES ELECTRON DEVICES
1.0 MW / 175 MHz Source for IFMIF: a study of alternatives
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Almost 40 years of operation with tetrodes in the CERN-SPS CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of RF-SPS team CWRF workshop,
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
ESRF PSG safety for equipment and personal related to power converters 2 nd POCPA 15th of June 2010 Jean-François Bouteille.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
LIU-SPS RF Power upgrade | 09 December 2015.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ALBA RF Systems Francis Perez.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Status of the ELETTRA RF Plants
MICE RF System Power Supplies, Control and Monitoring Status report
Development of high-power IOTs as an efficient alternative to klystrons Morten Jensen Energy for Sustainable Science 24 October 2013, CERN.
High Energy Proton Synchrotrons
MEDIUM VOLTAGE APPLICATIONS.
Status of the ALS and APEX RF Systems at LBNL
Construction and Commissioning of Electronic Test Benches
Construction and Commissioning of Electronic Test Benches
Developments of High CW RF Power Solid State Amplifiers at SOLEIL
SPS TWC 200 MHz Super Proton Synchrotron Travelling Wave Cavities 200 MHz 4 x 1.0 MW cw 25 years of experience.
RF operation of REX-ISOLDE
the CERN Electrical network protection system
SNS Operational History
POPS Strategy for Restarting & Repairing
IFMIF-EVEDA RF POWER SYSTEM
CEPC RF Power Sources System
PEP-II RF System Status and Upgrades
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status and New Developments of ALBA RF Systems
Presentation transcript:

IOT operation in the SPS Long term experience TWC 800 MHz 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

Project analysis slide 2 CONTENTS Project analysis slide 2 SYSTEM PRESENTATION OPERATION STATISTICS 800 MHZ OPERATION SCENARIO IOTs LIFE TIME DATA TRANSMITTERS FAULTS IOT STARTUP MANAGEMENT PREVENTIVE MAINTENANCE EFFICIENCY OTHER IOT INSTALLATION AT CERN CONCLUSION 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

SYSTEM PRESENTATION CERN Accelerator complex 2 x 800 MHz TW Cavity TH795 160 KW CW per Cavity 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

OPERATION STATISTICS Main objective In average there was around 7 hours off operation per year. The availability for beam in SPS was more than 99.9 % 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

800 MHZ OPERATION SCENARIO IOT att ph load CAVITY 3 dB L.L. drive IOT att ph load CAVITY 3 dB L.L. drive CAVITY 1 CAVITY 2 4 IOT combined for 1 cavity The beam operation allows to have 1 IOT offline per cavity And also, depending the users, the system allows to have 1 cavity off ! 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

800 MHZ OPERATION SCENARIO IOT att ph load CAVITY 3 dB L.L. drive IOT att ph load CAVITY 3 dB L.L. drive CAVITY 1 CAVITY 2 4 IOT combined for 1 cavity The beam operation allows to have 1 IOT offline per cavity And also, depending the users, the system allows to have 1 cavity off ! 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

800 MHZ OPERATION SCENARIO IOT att ph load CAVITY 3 dB L.L. drive IOT att ph load CAVITY 3 dB L.L. drive CAVITY 1 CAVITY 2 4 IOT combined for 1 cavity The beam operation allows to have 1 IOT offline per cavity And also, depending the users, the system allows to have 1 cavity off ! 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

800 MHZ OPERATION SCENARIO IOT att ph load CAVITY 3 dB L.L. drive IOT att ph load CAVITY 3 dB L.L. drive CAVITY 1 CAVITY 2 4 IOT combined for 1 cavity The beam operation allows to have 1 IOT offline per cavity And also, depending the users, the system allows to have 1 cavity off ! 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

LIFE TIME DATA 4 years of operation 6 tubes have now more than 30’000 hours filament Only one had to be replaced current of 2018 with a ‘possible’ arc failure (still to be confirmed, the tube could be ok) 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

FAULTS 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

FAULTS Isolation Transformer : Resin transformer isolated up to 60 kV DC All first transformers installed come from a bad series During the two first years of operation, it was difficult to identify that the problem was the transformer New transformers were bought with an improved isolation Interventions were always necessary to fix the trouble, main circuit breaker tripped Not a thermal cause ! But a HV arc! 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

FAULTS Coaxial lines : Some difficulties on the assemblies of the coaxial lines were experimented It was only human errors Can appear several days after the mistake was made. The time of intervention for repair is several hours 4-1/2’’ coaxial line Inner elbow burned Bad contact from the inner clamp 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

FAULTS Ion pump isolation piece Trolleys : The pieces between Ion pump et cathode melted due to a bad soldering. A second default was found, a water leak on the anode contact due to also a bad brazing The time to replace a trolley from the transmitter is as well several hours Anode cooling pipes 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

FAULTS 800.8 MHz Low Level and PLC : 776 MHz 825 MHz Following the LL upgrade done two years ago, the new ‘Switch & Limit’ system generated strange injections to the power system. Concerning the PLC and controls, we fixed some initial problems linked with the start-up, and later troubles linked with the ‘S&L” system. 776 MHz 825 MHz Δ ‘Switch & Limit’ system generated harmonics (- 25 MHz / + 25 MHz) even higher than the fundamental ! 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

IOT STARTING UP MANAGEMENT First start (at reception of the tube before storage or after a long (years) storage) IonPump & Filament : 24 hours HV ( 20 kV / 0.2 A) : 1 hour HV ( 30 kV / 0.2 A) : 1 hour HV ( 35 kV / 0.6 A) : 1 hour HV ( 35 kV / 0.15 A) : 1 hour RF (CW half power) : 30 min RF (CW full power) : 30 min Second start (after storage, less than a year) IonPump & Filament : 2 hours HV ( 20 kV / 0.2 A) : 30 min HV ( 30 kV / 0.2 A) : 30 min HV ( 35 kV / 0.6 A) : 30 min HV ( 35 kV / 0.15 A) : 30 min Long stop (hours or days) Short stop (minutes) IonPump & Filament : 10 min HV (35 kV / 0.15 A) : 0 min RF (CW full power) : 0 min In case of more difficulties for the start up of an IOT, we do a conditioning on table up to 45 kV (35 kV in operation). In addition we also reduce the filament current with respect to ageing given Thales indications. 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

PREVENTIVE MAINTENANCE Daily Noise Smell Reflected levels Body current Grid current Monthly Air filter Water inspection Technical stop (4x1w/y) Air pressure switch HV visual control IOT tunning Combining IOT tunning Tank water level End year stop (10 w) Electrical tightening Soldering control Smoke detector Water flow HV cleaning Crowbar test Drivers gain Plunger control Long shutdown (1-2y/5y) Capacitors exchange Fans replacement HV cleanig Trolley cleaning Motor servicing A good preventive maintenance get rid of troubles linked to HV 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

PREVENTIVE MAINTENANCE Smoothing capacitors : The Low Voltage capacitors (400 VAC) for the HV smoothing in Electrosys cubicle is an important point for the maintenance and operation The lifetime in operation is rated 20’000 hours Off the shelf lifetime is 500 hours only !!! This implies a daily accurate management of the spares 97 capacitors on 1 card 1,552 capacitors at 8 €/unit for 8 transmitters every 5 years ! Total cost = 2’500 €/year 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

PREVENTIVE MAINTENANCE Grid cleaning process : Following the recommendation from Thales, we do a grid cleaning The initial excess of barium from the cathode moves to the grid, and after around 5’000 hours this starts to induce thermal grid current We implemented our own system, and after our process the complete thermal grid current disappears by removing this excess of barium from the grid The cleaning was for the moment necessary only one time for each IOT 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

EFFICIENCY 40 KW CW operation point 160 KW CW operation point In order to guaranty availability for the beams, and include margin requested by the LLRF, we decided to operate the tubes at a lower point of operation than the maximum available. We demonstrated that this is very efficient for the availability of the system. However, this has a cost in the DC to RF efficiency, we pay almost – 15 % efficiency. 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

OTHER IOT INSTALLATION @CERN SPS Crab cavity 400 MHz 40 KW CW MB IOT 704 MHz 1.2 MW Pulsed Medical RFQ 750 MHz 100 KW Pulsed 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch

CONCLUSION Our IOT system is now mature and has proven to be very reliable, ensuring a high availability for the beams IOT itself demonstrated to be very robust and easy to operate IOT has the advantage of a high gain, needing only a few hundreds of Watt driver IOT offers a high power density (HVPS can be aside and quite far away) Given the LLRF requirements of margin, IOT offers a very good DC to RF efficiency IOT are absolutely fantastic ! IOT should always be considered for RF systems for accelerators ! Thank you for your attention 18 - 20 June 2019, Ångström Laboratory frederic killing, eric.montesinos@cern.ch