BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

401 Water Quality Certification South Carolina Department of Health and Environmental Control.
Analysis of Dike 14 CDF to Public Greenspace. Who owns Dike 14? State of Ohio holds Dike 14 as a public trust land Cleveland-Cuyahoga County Port Authority.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
Department of Army Permitting Process: Dredging
Environmental Compliance Negotiating our way through the process…
London Convention Guidelines for Assessment of Dredged Material
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
US Army Corps of Engineers One Corps Serving The Army and the Nation U.S. Army Corps of Engineers Regulatory Program.
Army Corps permitting of shellfish culture, harvest and restoration Bill Dewey, Taylor Shellfish Company Shelton, Washington
Civil Works Baltimore District River and Harbor Projects.
1 Wetland: Types Marsh Swamp Bog Floodplain/Bottomland Playa Prairie Pothole Vernal Pool Wet Meadow.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
US Army Corps of Engineers BUILDING STRONG ® Regulatory Program Glen Justis Chief, Policy & Administration Regulatory Division Alaska District 2010 Building.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Oil Spill Effects on Environment and Wildlife
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Section 404 of the Clean Water Act 404(b)(1) Guidelines Field Exercise
NEFU Annual Convention Mike Mullen - Licensing and Compliance Coordinator Division of Land Resource Regulation MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
Kitsap County Shoreline Master Program Update Task Force Work Group Meeting August 16, 2011.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
August 20, 2015 Aquatic Habitat Protection Program Turtle Lake Watershed - AGM Ben Wilson – Aquatic Habitat Protection Specialist.
Dredging Engineering: Building & Maintaining Underwater Highways
Herring River Restoration Project “Return of the Tide” Friends of Herring River August 18,
U.S. Army Corps of Engineers REGULATORY PROGRAM WILMINGTON DISTRICT March 13, 2008.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
OFFICE OF COASTAL MANAGEMENT Karl Morgan JUNE 2013 Karl Morgan JUNE 2013.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama and Mississippi.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Water Quality Certification for hydropower licensing in Wisconsin.
Department of Army Permitting Process: Dredging
Marilyn Latta North Bay Watershed Association Novato, CA June 3, 2011 San Francisco Bay Subtidal Habitat Goals Project.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
At approximately four (4) square miles in size, Lake Hopatcong is the largest freshwater body in New Jersey.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
UPPER NEWPORT BAY ECOSYSTEM RESTORATION PROJECT NEWPORT BEACH CITY COUNCIL STUDY SESSION FEBRUARY 14, 2006.
For Storm Water Discharges Associated with Construction Activity
Barriers and Challenges to Developing Renewable Energy Projects
Watershed-based Plan To Restore the Hackensack Meadowlands:
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
R. E. Randall Center for Dredging Studies
Continuing Authorities Program
Estuaries.
Galveston Bay Bottom Ecosystem System Features
Michigan Dept. of Environmental Quality Water Resources Division
Sediment Cleanup Options
EPA Public Meeting Dallas, Texas May 10, 2005
Army Corps permitting of shellfish culture, harvest and restoration
Waters of the U.S. Updates and Changes
Level 1B: Advanced Fundamentals Effective August 2018
Public Lands Act Regulations Update
Pipeline Planning and Construction: Environmental Considerations
Watershed-based Plan To Restore the Hackensack Meadowlands:
Southern Maine Dredge Purchase Feasibility Study
Chapter 45 Environmental Protection and Global Warming
Presentation transcript:

BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT Project Sponsor: Massachusetts Port Authority (Massport) Total Project Cost: ~$300M (75/25% cost-share) Schedule: February 2018-December 2021 Phase I Maintenance Dredging Great Lakes Dock and Dredge -Contract 1 Completed: December 2017 Phase II Improvement Dredging Cashman/Dutra JV -Started 7/9/2018 -3.9MCY dredged to date -~33% of the current contract is complete -Expected contract completion: October 2021 Phase III (final phase) Fast Rock Removal (Blasting) -Contract advertisement ~ APR2020; award in summer 2020. -~500,000CY of ‘fast’ rock -Expected completion: December 2021

Corps Regulatory Authority For Dredging Section 10 of the Rivers and Harbors Act of 1899 – Authorizes structures and work in navigable waters of the United States. Section 404 of the Clean Water Act – Authorizes the discharge of dredged and/or fill material into waters of the United States; Section 103 of the Marine Protection, Research and Sanctuary Act – Authorizes the transportation of dredged material for the purpose of ocean disposal Dredging (Mechanical or Hydraulic) – Section 10 only Upland Disposal – No Corps additional permits required. Confined Aquatic Disposal (CAD) cells – Section 10 and 404 Massachusetts Bay Ocean Disposal Site – Section 10 and 103

Corps regulatory review for dredging projects General Permits for the Commonwealth of Massachusetts (GP MA #5) – for minor projects Self Verification Activity – Maintenance dredging of previously dredged areas to previously dredged depths that meet all the following conditions Dredged area <0.5 acre; Not located in right whale critical habitat OR within tidal waters from 3/15 to 10/31 of any year (Endangered Species) Not located in tidal water from 1/15 to 10/31 of any year or on the Charles River between the Amelia Earhart Dam and the Watertown Dam from 2/15 to 11/15 (Essential Fish Habitat) NOTE: Time-of-year restrictions documented in the Massachusetts Division of Marine Fisheries’ Technical Report #47 can apply for specific waterbodies if they are less restrictive. No impacts to mudflats, intertidal areas, areas located within 25 feet of salt marsh, within 100 feet of vegetated shallow (e.g. eelgrass), or areas containing shellfish (unless it is determined that areas is not shellfish suitable as per MassGIS shellfish suitability maps). No return water from upland disposal areas. Must compliance with GP MA general conditions (see Slide #6).

Corps regulatory review for dredging projects (con’t) General Permits for the Commonwealth of Massachusetts (GP MA #5) – for minor projects Pre-Construction Notification required (formal review required) Improvement Dredging (dredging to a new depth) New Dredging (<0.5 acre) or Disposal (<10,000 cubic yards) Beach nourishment within jurisdictional waters not associated with dredging Individual Permit Review New Dredging >0.5 acre in size; involving >10,000 cubic yards of dredged material; >1,000 square feet of impacts to intertidal areas, salt marsh, mud flats; or >100 square feet of impacts to tidal vegetated shallows (e.g. eelgrass beds). Maintenance or Improvement Dredging and/or disposal with >1 acre of impacts to special aquatic sites (i.e., salt marsh, mud flat, tidal vegetated shallows). New Dredging where the primary purpose is sand mining for beach nourishment. Beach Scraping (for dune or beach maintenance). Boulder removal and relocation for navigation >0.5 acres. Blasting.

Primary GP MA General Conditions to consider for dredging projects A Dredging Project will require the submittal of a Pre-Construction Notification and a formal application review will be required if any of the following applies: Dredging Project will alter or temporarily or permanently occupy or use a Corps authorized Civil Works project or associated buffers (e.g. Federal Navigation Project). This may require a Section 408 review (General Condition (GC) #5). Project occurs within or could cause secondary or indirect environmental effects to areas administered by the National Park Service, the U.S Fish and Wildlife Service, or the U.S. Forest Service (GC #5). Project has the potential to cause effects to properties listed or eligible for listing on the National Register of Historic Places AND the Section 106 (National Historic Preservation Act) Consultation Process has not been completed (GC #7). Project “may affect” Federal endangered and/or threatened species AND Section 7 (Endangered Species Act) Consultation Process has not been completed (GC #10). Water Quality Certification must be issued or waived by Massachusetts DEP and Federal Coastal Consistency Determination must be finalized by the MA Office of Coastal Zone Management for the Corps authorization to be final..

Dredge Material Testing Requirements for Open water disposal Section 404 disposal sites [e.g. Cape Cod Disposal Site and CAD sites] Physical testing (grain size, moisture, TOC) Composting, if necessary Bulk Sediment Chemistry testing (metals, PAHs, PCBs, pesticides) Section 103 disposal sites [Massachusetts Bay Disposal Site] 10 day biological toxicity test Suspended phase elutriate testing 28–day biological bioaccumulation test and risk assessment model Marine Analysis Unit’s Weight of Evidence review (site history, contaminate history, environmental risk assessment) Marine Analysis Unit Point of Contact: Norm Farris (978) 318-8336