HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting

Slides:



Advertisements
Similar presentations
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Advertisements

Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
FACET Machine Performance and Expectations M. Sullivan for the FACET Accelerator group SAREC Review July 25, 2013.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
Y. R. Roblin Hall A beamline and accelerator status.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
NON-INTERCEPTING DIAGNOSTIC FOR HIGH BRIGHTNESS ELECTRON BEAMS USING OPTICAL DIFFRACTION RADIATION INTERFERENCE (ODRI) A. Cianchi #1,2, M. Castellano 3,
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
12 GeV CEBAF Transverse Emittance Evolution Todd Satogata / Center for Advanced Studies of Accelerators May WEBD1.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
ApEx needs for CeC PoP Experiment December 11, 2015.
July Ops StayTreat: Transverse Emittance (T. Satogata)p. 1 Synchrotron Radiation Emittance Growth Arc focusing very flexible: separate power supplies.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
From Beam Dynamics K. Kubo
Cost Optimization Models for SRF Linacs
Polarized Injector Update
Beam Commissioning Adam Bartnik.
Summary of SPARC first-phase operations
Bocheng Jiang SSRF AP group
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
New algorithms for tuning the CLIC beam delivery system
Auxiliary Positron Source
Beam-beam effects in eRHIC and MeRHIC
SuperB Injection, RF stations, Vibration and Operations
Emittance growth AT PS injection
Coupling Correction at the Australian Synchrotron
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
Multiturn extraction for PS2
CEBAF Injector Overview
Beam-beam R&D for eRHIC Linac-Ring Option
Accelerator status after the 12 GeV upgrade
12 GeV CEBAF.
G0 Accelerator Planning Meeting (11/1/05)
Operations Department
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
NanoBPM Status and Multibunch Mark Slater, Cambridge University
LHC (SSC) Byung Yunn CASA.
Beam-Beam Interaction in Linac-Ring Colliders
Linac Physics, Diagnostics, and Commissioning Strategy P
CEBAF Pulsed Operation for JLEIC Electron Injection
Proposal for a CESR Damping Ring Test Facility
Continuous Electron Beam Accelerator Facility Overview
Specifications for the XFEL Beam Switchyard Kickers
Update on ERL Cooler Design Studies
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Hall A Beam Parameters Table
MEIC New Baseline: Part 7
ILC Beam Switchyard: Issues and Plans
Summary and Plan for Electron Polarization Study in the JLEIC
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting January 25, 2018

OUTLINE Hall A and CEBAF 12 GeV parameters Current Status Preparation for upcoming runs Configuration for low energy spread Raster versus intrinsic beam size Conclusion

6 GeV vs 12 GeV CEBAF Top Level Parameters Energy to Halls A,B,C / D 11 GeV Number of passes for Halls A,B,C / D 5 Duty Factor CW Max. Current to Halls A+ C / B 200 A / 5 A Max. Current to Halls A+C / B+D 85 A Max. Beam Power 1 MW Emittance at max. energy (unnormalized, rms): x, y 1 nm-rad, 1 nm-rad 10 nm-rad, 2 nm-rad Energy spread at max. energy (rms) 2.5 x 10-5 5 x 10-4

Transverse Emittance* and Energy Spread† Area p/p [x10-3] x [nm] y Chicane 0.5 4.00 Arc 1 0.05 0.41 Arc 2 0.03 0.26 0.23 Arc 3 0.035 0.22 0.21 Arc 4 0.044 0.24 Arc 5 0.060 0.33 0.25 Arc 6 0.090 0.58 0.31 Arc 7 0.104 0.79 0.44 Arc 8 0.133 1.21 0.57 Arc 9 0.167 2.09 0.64 Arc 10 0.194 2.97 0.95 Hall D 0.18 2.70 1.03 DBA option Damping Values are calculated at the end of each arc. Normalized emittance is beta.gamma*egeometric These calculations were checked with 3 different codes and also agree with a simpler analytical estimate (sand’s formula) which Does not take into account synch rad. Loss in quadrupoles. Sync. Rad. * Emittances are geometric † Quantities are rms

Ratio of non-Gaussian tail to Gaussian core. 12 GeV Beam Requirements Hall Emittance Energy spread () Spot size (s) Halo A εx < 10 nm-rad, εy < 5 nm-rad 12 GeV: 0.05% 2-4 GeV: 0.003% (with alt. Optics) 12 GeV: x<400μm, y< 200μm 2-4 GeV: y < 100 μm Can do x<200μm, y< 200μm <0.01%(1) These are the official specs as provided to the 12GeV project. Ratio of non-Gaussian tail to Gaussian core.

Beam Delivery Constraints Hall D is running: Any other Hall at 5 pass will need to be at 249.5 Mhz Halls at lower passes can choose 249.5 or 500 Mhz Four Halls Running: Two Halls will have to share the same slit at the chopper. They will be at 249.5 Mhz. Energy Reach: Nominal is 1090 MeV gain per linac It is possible to request less (lower limit is about half that) A significant energy change requires a full setup, a small one (up to a few percents) should be manageable within a couple of shifts (we need to quantify this for future experiments)

Beam Delivery Constraints (cont) Current Limitations: Several factors limit the maximum current available: Klystron power in linac cavities limits it about 485 𝝁𝐀, so about 85 𝝁𝐀 at pass 5. Dump are rated to 1kW in Hall A/C but administrative limit is 800 Kw. Polarization constraints: We have a double Wien filter allowing for a way to fully flip polarization 180 (like the half-wave plates do). We can optimize for maximum polarization in the presence of synchrotron radiation. This process is done offline. A new tool allowing for this to be done ”on-the-fly” is being developed.

Current Status Tritium experiments on the floor now . Hall A is operational at 5 pass (ran with 22 𝝁𝐀) Recommissioned the vertical 5 pass extraction to prepare for three beams at five pass (this run period). Matching process is robust, allows for spot sizes at target of 200 𝝁𝐦 𝐚𝐭 𝐭𝐚𝐫𝐠𝐞𝐭 𝐩𝐚𝐬𝐬 𝟓, 𝐬𝐦𝐚𝐥𝐥𝐞𝐫 𝐚𝐭 𝐥𝐨𝐰𝐞𝐫 𝐩𝐚𝐬𝐬𝐞𝐬 Beam positions stable with the slow lock system. We are planning to recommission the fast-feedback during beam studies this run period. Target misalignment relative to the beamline can be an issue with the tight aperture requirements for Tritium.

Preparations for fall run One experiment in particular E12-17-003: It will require low energy spread, good energy stability We need to make sure the fast-feedback is functional (hardware was upgraded) We need to make sure we can measure energy spread at 1C12 (new OTR system) We need to revert to the 6GeV low energy optics Beam studies during the winter run period (now) will be used to check that the fast-feedback system is operational and cross-calibrate the OTR 1C12 with the harp at 1C12. Any other particular requests regarding this upcoming fall run ? Need to know now if it requires beam studies.

Low emittance growth, Low beta. We reached 800 kW with it. 12GeV HALL A optics Low emittance growth, Low beta. We reached 800 kW with it. We used these to do a full power CW run in Hall A. Low emittance, easy tunability optics. Very small beta’s in ARC which reduces HALO formation Beam is divergent after target to spread it onto diffuser and dump, lowering density of energy deposition.

Low Energy Spread optics

HALL A beamline raster configuration Fast raster septum The actual 3D of the septum and target area will be shown in a a separate talk. Hall A raster is upstream of Moeller target. Four quadrupoles are between it and the experimental target Adjusting these quadrupoles affect both intrinsic beam size and raster deflection. Also, one has a constraint on minimum spot size at diffuser in case of raster failure.

Raster checks with beam 8.843 GeV/c In my model, I have a simple tv-raster uniform scan. The real one has triangular waves and a more complex pattern. My model has infinite bandwidth. The BPMS are limited to 1000 Hz or so. They sample at 2Khz. Raster is 24 Khz. Nevertheless, one can use that model to predict raster size. In practice, it is also adjusted by using spot++. This is for a 2mmx2mm raster. Optics model can predict raster size.

Conclusions Hall A can deliver the requested 12 GeV beam parameters It can be configured for the first 2 passes with an optic that is designed to monitor energy spread The higher passes are configured with an optic which reduces emittance growth and allow control of spot size. Fast-feedback system has not been yet commissioned for pass 5, planning to do so this winter.