Transforming the Electric Grid with Storage

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
Infrastructure Planning: Non-Transmission Alternatives 2010 NASUCA Mid-Year Meeting San Francisco, June 15, 2010 Drew Murphy NRG Executive Vice President.
New Jersey Clean Energy Symposium Rowan University - June 18, 2004 New Jersey Clean Energy Program Renewable Energy Programs and Policies.
Fuel Cell Forum-12 March 2007 Considerations on the purpose, feasibility, and design of incentives for Alternative Energy adoption.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Unlocking value from existing utility assets NARUC Meeting – February 2012
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
The Continuing Evolution of U.S. Electricity Markets
Naperville’s MUNI Marla Westerhold I n Slide Show mode, the slides and audio should start automatically. If this doesn’t happen.
Renewable Energies for Transportation, Electricity and Energy Storage Technologies (Round Table 3) U.S. Policies and Programs John P. Millhone Representing.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
The Policy Voice for Energy Storage Bulk Energy Storage for the Nation’s Electricity Grid Jason Makansi, Executive Director President, Pearl Street Inc.
STORAGE OVERVIEW 2010 Steve Isser, JD, PhD Vice President & General Counsel Good Company Associates.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Moving Toward Hybrid Power Systems Creating value with utility scale energy storage ERCOT Renewable Technology Working Group April 2009.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Barriers to Energy Storage providing Ancillary Services in ERCOT
Overview In order to address this issue, we will be setting up a small, local power company to provide local alternative energy. We will use wind energy.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Hawaii Energy Storage Seminar: Utility Regulation Service
PJM©2011 From Pilot to Production: Integrating New Storage Products in PJM Scott Baker PJM Interconnection ERCOT ETWG Storage Workshop December 2, 2011.
New Incentives for Pursuing Demand Response Scott Strauss and Sean Flynn Spiegel & McDiarmid APPA Legal Seminar San Francisco – November 2004.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
PJM Restructuring Roundtable Panel I: The Integration of Variable Energy Resources in PJM Markets, Planning, and Operations March 30, 2016 Eric Thumma,
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Distribution System Planning in Hawaii
Renewable Energy Challenges: System Stability
Wind Management at MISO
Asia-Pacific Energy Regulatory Forum
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
At-Risk Nuclear Plants: Challenges and Opportunities
Emerging Energy Technologies
Massachusetts Electric Restructuring Roundtable
The Transition to a High DER Future
Challenges Facing Nuclear Operatoring Plants Today
Operating a modern renewable-based grid
The Future of Demand Response in New England
Draft 2013 Energy-Efficiency Forecast
31st USAEE/IAEE North American Conference
Environmental Policy & Outlook Conference The Ohio State University
MISO Market Transformation The Intersection Of Renewables, Transmission And Technology Raj Singamsetti Executive Director of Portfolio Strategy,
Generation Expansion Daniel Kirschen
Renewable energy builds a more reliable and resilient electricity mix
Trends in U.S. Electric Power Markets and Renewable Integration
Sandip Sharma ERCOT Manager, Operations Planning
Forecasting and Operations CAISO Case
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
The logic progression... Northern Ireland has high wind penetration,
Wind Development & Policy Options
Solar Energy Commercialization Utility Scale Business:
4Q 2018 Earnings Presentation
Offshore Wind Transmission Prepared for PJM Roundtable
Jim Mcintosh Director, Executive Operations Advisor California ISO
The Future Grid and Energy Storage
Status of Energy Storage Policy in the U.S.
The Status of State Grid Modernization Efforts
Presentation transcript:

Transforming the Electric Grid with Storage Beacon Power Corporation Flywheel Energy Storage Chet Lyons, Director of Marketing and Sales April 15, 2011

Safe Harbor Statement This presentation contains forward-looking statements, including the Company's beliefs about its business prospects and future results of operations. These statements involve risks and uncertainties. Among the important additional factors that could cause actual results to differ materially from those forward-looking statements are risks associated with the overall economic environment, the successful execution of the Company's plan of operation, changes in the Company's anticipated earnings, continuation of current contracts, changes in energy and other applicable regulations, and other factors detailed in the company's filings with the Securities and Exchange Commission, including its most recent Forms 10-K and 10-Q. In addition, the factors underlying Company forecasts are dynamic and subject to change and therefore those forecasts speak only as of the date they are given. The Company does not undertake to update them; however, it may choose from time to time to update them and if it should do so, it will disseminate the updates to the investing public.

20 MW plant in Stephentown, NY Company Overview Supplier of fast response frequency regulation using flywheel energy storage: Merchant service provider Seller of turnkey plants Operating in ISO-NE pilot program since November 2008 1 - 3 MW Constructing 20 MW plant in NY; Received $43 million DOE loan guarantee; $2 million NY grant 14 MW operating Developing 20 MW plant in PJM; Awarded $24 million DOE grant Flywheels in ISO-NE 20 MW plant in Stephentown, NY

1st 20 MW Plant — NYISO STEPHENTOWN, NY – 14 MW operating, 20 MW to be complete in Q2 2011 Highlighted by the White House as being one of the 100 Recovery Act Projects that are Changing America

Fast response storage can reliably and cost effectively meet this need ISO/RTOs forecast need for more Regulation with increased Renewables Additional need for Regulation with more wind: ISO-NE increase by 282% with 20% wind CAISO increase by 300% with 33% wind NYISO increase by 60% with 10% wind PJM increase by 200% with 20% wind *New England Wind Integration Study, 12/5/2010 Fast response storage can reliably and cost effectively meet this need

Regulating the Grid of the Future CONVENTIONAL SMART GRID + + Regulation provided by generators varying output Decreases efficiency Increases fuel consumption Requires more maintenance Increases emissions Store energy when supply exceeds load; inject energy when load exceeds supply High round trip efficiency Low operating cost Near instantaneous response Zero direct emissions

Flywheel Emissions Advantage Metric Tons CO2 From KEMA study: 20 MW of Regulation over 20-year operating life 8hr/day 8hr/day Dramatically Lower Emissions

Fast Regulation: Speed Matters… Slow ramping Generator Fast response Flywheel Energy Storage Advanced Storage provides fast accurate response Sources: - Kirby, B. “Ancillary Services: Technical and Commercial Insights.” Wartsilla, July, 2007. pg. 13

Data from ISO-NE pilot project shows Fast Regulation provides more Value 1 MW of Regulation Flywheel Generator ACE Corrected 0.48 MWh 0.18 MWh Against ACE 0 MWh -0.07 MWh Net ACE Correction 0.11 MWh Fast resources provide more ACE Correction per MW; Enabling less total procurement and cost

Regulatory Issues: Removing Market Barriers to Storage In Feb 2007 FERC issued Order 890 which mandated inclusion of new technologies in Regulation market Market barriers existed for storage to provide regulation Market Entry Status Midwest ISO, NYISO and PJM: Open Made tariff changes necessary to integrate energy storage resources into their Regulation markets CAISO Board of Governors voted on Feb. 3, 2011 to implement market rules to fully open their Regulation market to storage resources ISO-NE began Alternative Technologies Regulation Pilot Program in 2008; plan to propose permanent market rule changes to stakeholders in Q2 2011 ERCOT (not under FERC jurisdiction) created Emerging Technologies Working Group in 2010; reviewing tariff changes

Regulatory Issues: Pay-for-Performance FERC issued NOPR to reform Frequency Regulation Compensation (February 17, 2011) FERC is concerned that current market rules “may be unjust and unreasonable because faster- ramping resources are compensated at the same level as slower ramping resources, even though they can respond more quickly and provide more ACE correction.” Two-part Regulation payment: Capacity + Performance 1 MW of Regulation Flywheel Generator ACE Corrected 0.48 MWh 0.18 MWh Against ACE 0 MWh -0.07 MWh Net ACE Correction 0.11 MWh Mileage 25 MW miles 8 MW miles In all RTOs (except ISO-NE) both resources are currently compensated the same; NOPR mandates that fast response resources are paid for value

Regulatory Issues: State Policies Massachusetts: Storage included in 2008 Green Communities Act and Green Jobs Bill Created Alternative Energy Portfolio Standard for storage Defined storage as a clean energy technology ““Clean energy research”, advanced and applied research into new clean energy technologies including: solar photovoltaic; solar thermal; wind power; geothermal; wave and tidal energy; advanced hydropower; energy storage for automotive applications; energy storage for grid applications;…” California: AB 2514 Requires CA PUC to determine target amounts for each LSE to procure energy storage Ohio, Hawaii, Pennsylvania, Connecticut, North Carolina and Oklahoma Energy storage can be counted towards RPS/RES/AES goals