Effective Construction Safety Management

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Managing the Health and Safety of Contractors
Construction (Design and Management) Regulations 2007
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
CDM 2015 Key Changes and Duty-Holder Responsibilities
Health and Safety - an update Ian Gillett Safety Director.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Construction (Design and Management Regulations) 1994
Welcome to An awareness of Operational Analysis and Control Check. it’s safe... © Ciaran McAleenan, 2002.
Utilities Working on the Network Health & Safety Requirements.
The Construction (Design & Management) Regulations
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
The Pre-Tender Stage Health and Safety Plan By John Johnston AIIRSM Health and Safety for Beginners
WHS Management Plans.
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
UK’s CDM Regulations 2007 and its Applications in Singapore
Risk Assessment – An Essential Standard
CDM - The Role of The Principal Contractor By John Johnston AIIRSM Health and Safety for Beginners
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
OSH legislation in Malaysia
Hansen – Managing Safely 1 CDM – An Appreciation Mark Mallen Health and Safety Manager Fenlock Hansen Ltd.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
CDM 2015 – HSE’s PERSPECTIVE Health and Safety Executive
Roles and Responsibilities
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
CDM 2015 Simon Longbottom 20 May Progress Significant culture change over last years Long-term downward trend fatals/major injuries Greater.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
The heart of health and safety. CDM 2015 HSE Consultation A short overview from the IOSH Construction Group John Lacey & Paul Haxell.
Health and Safety Self Assurance Toolkit 2017
Health & Safety at Work Act 1974
CDM Client Briefing Tim Knowles
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Desk Based Preconstruction – Planning
Selection of contractors & PAS91:
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Health and Safety Policy
Risk Based Thinking in Health & Safety
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Temporary Works Co-ordination
Working as a Contract Consultant
Design Risk Management Spotlight on CDM 2015
People Responsible For Health and Safety
CDM 2015 COSG Update.
The Construction (Design and Management) Regulations 2015
Prevention through planning, control and monitoring Harold Chinogurei
Ray Filip BEng (Hons), MSc, DIC, CEng, FICE Temporary Works Consultant 31 years temporary works experience: Concor Construction (Africa) John Laing.
Elements of an Effective Safety and Health Program
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Client duties on CDM Regulation 2015
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

Effective Construction Safety Management Agenda Safety Management in Roads Service A review of the roles within CDM What are the construction regulations? What's in a H&S plan? CDM and procurement Discussion © Ciaran McAleenan, 2001

Effective Construction Safety Management Analyse the Operation Improve Effectiveness Review Manage Set your work objectives to include; “...tasks/ activities are to be completed on time and in a manner that does not cause harm to the employees, customers, other non-employees, or the company/ organisation.” Operational Analysis & Control Model © Ciaran & Philip McAleenan, 1997 - 2001

Effective Construction Safety Management Analyse the Operation Improve Effectiveness Review Manage Analyse the Operation Three questions What can cause harm? What are you doing about it Is it enough? Operational Analysis & Control Model © Ciaran & Philip McAleenan, 1997 - 2001

Effective Construction Safety Management Analyse the Operation Improve Effectiveness Review Manage Manage the Operation Three more questions What has to be done? What resources do you need? When is a review needed? Operational Analysis & Control Model © Ciaran & Philip McAleenan, 1997 - 2001

Effective Construction Safety Management Analyse the Operation Improve Effectiveness Review Manage Effectiveness Review Final three questions Has the operation progressed as planned? Detail the changes needed. List the improvement actions. Operational Analysis & Control Model © Ciaran & Philip McAleenan, 1997 - 2001

Design it, Build it, Maintain it, and Demolish it Effective Construction Safety Management In Practice you have to... Design it, Build it, Maintain it, and Demolish it taking full account of the safety of the construction worker, the end user and anyone else that may be affected. Analyse the Operation Improve Effectiveness Review Manage Operational Analysis & Control Model © Ciaran & Philip McAleenan, 1997 - 2001

Roles within CDM Client Designer Planning Supervisor Effective Construction Safety Management Roles within CDM Client Designer Planning Supervisor Principal Contractor

Roles within CDM - Client Appoint competent; Effective Construction Safety Management Roles within CDM - Client Appoint competent; planning supervisor designer(s) principal contractor Ensure H&S plan prepared before construction phase starts Provide relevant information Ensure H&S file is kept available

Roles within CDM - Designer Advise clients on their duties Effective Construction Safety Management Roles within CDM - Designer Advise clients on their duties Design for safety, i.e. Avoid foreseeable risks, Combat risks at source, Priority to those involved in construction , cleaning or otherwise affected, Design to include adequate information, and Co-operate with the planning supervisor.

Effective Construction Safety Management Designers must… At concept feasibility and design stage, make client aware of duties identify H&S hazards of any design work, give adequate regard to risk control hierarchy, provide H&S information to those who need it, and co-operate with the planning supervisor and other designers At construction phase identify hazards in ongoing design work (e.g. temporary works) provide H&S information to those who need it, and co-operate with the planning supervisor and other designers

Roles within CDM - Planning Supervisor Project is notified to HSE, Effective Construction Safety Management Roles within CDM - Planning Supervisor Project is notified to HSE, Ensure design includes; reference to H&S management, and adequate information about structures and material, Ensure co-operation between designers, Advise client/ contractor regarding; competence of personnel, and allocation of resources Ensure preparation and final delivery of H&S file and Ensure H&S plan is available.

Roles within CDM - Principal Contractor Effective Construction Safety Management Roles within CDM - Principal Contractor Ensure co-operation between contractors, Ensure every contractor and employee complies with H&S plan, Ensure only authorised persons enter construction area, Ensure notification particulars are displayed, Provide information promptly to the planning supervisor, Give necessary directions and information to contractors, Include construction H&S management in the H&S plan Provide training to employees, and Have employee liaison arrangements.

Effective Construction Safety Management Planning Supervisors Issues Round the table open discussion period (allow at least 30 minutes)

Effective Construction Safety Management What I look for in a Health & Safety Plan? Pre-tender Phase Nature of project List of significant hazards and control measures, All known information relating to construction site e.g; services, traffic control, and ground conditions. Construction materials – precautions required, Problems that need specific discussions, Site rules; including access and accommodation, Liaison arrangements (Client and planning supervisor), Procedures for dealing with design changes.

Effective Construction Safety Management What I look for in a Health & Safety Plan? Construction Phase List of significant hazards and control measures, Identification of responsibilities, Management and review arrangements, Resources, Contractor control procedures, Site access arrangements, Methods for communicating (on-site and off-site), Emergency procedures.

Effective Construction Safety Management CDM and Procurement issues… Client must be satisfied that principal contractor has; competence to carry out and manage construction work, and adequate resources Key areas to probe include; General policy General organisation Planning and performance monitoring, Experience, and Specialist knowledge and resources.