Head-Tail Monitor for CC Diagnostics

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Development of a Chromaticity measurement application using Head-Tail phase shift technique.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Analysis of Phase Noise in a fiber-optic link
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Chapter 10 Rüdiger Schmidt (CERN) – Darmstadt TU , version E 2.4 Acceleration and longitudinal phase space.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Wakefield effect in ATF2 Kiyoshi Kubo
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
RF acceleration and transverse damper systems
Y.Papaphilippou Thanks to
Operating IP8 at high luminosity in the HL-LHC era
LCLS_II High Rep Rate Operation and Femtosecond Timing
EZDC spectra reconstruction and calibration
Bocheng Jiang SSRF AP group
Status of Interlock BPM
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
Longitudinal beam parameters and stability
Digitizers in CCR for transverse wide-band pick-ups
Follow-up of HL-LHC Annual meeting
Instability Diagnostics
LHC Emittance Measurements and Preservation
Space Charge Study Group
Multiturn extraction for PS2
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Head-Tail monitor Benoit, with the help of Christian Boccard and Ralph Steinhagen (BE/BI-QP)
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
R. Bartolini Diamond Light Source Ltd
Proton Beam Diagnostics
Alternative design of the matching section for crab-cavity operation
Limits on damping times
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Beam dynamics requirements after LS2
DEMONSTRATION OF TRIPLE BUNCH SPLITTING IN THE CERN PS
SPS-DQW HOM Measurements
Collective effects in the SPS and LHC (longitudinal plane)
Another Immortal Fill….
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Update on Crab Cavity Simulations for JLEIC
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Head-Tail Monitor for CC Diagnostics T. Levens (BE-BI) 152nd HiLumi WP2 Meeting, 2nd July 2019

Head-Tail Monitor LHC Head-Tail Monitor is a wide-band beam position monitor capable of measuring intra-bunch beam position. Long strip-line BPM 180º analogue hybrid calculates sum (Σ) and difference (Δ) Signals acquired by high speed digitizer in service gallery Originally installed in SPS/LHC for chromaticity measurements, now used primarily for instability diagnostics. T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

LHC Head-Tail installations Four single plane 40cm strip-line pick-ups (BPLH/V) installed close to Q5R4/Q6R4 (locations optimised for high β) Data acquisition with commercial high-speed (10 GSPS, 10 bit) oscilloscopes in UA47 T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

Head-Tail for CC diagnostics First crabbing of a proton beam observed with the SPS HT in 2018 CC not phased to the RF frequency resulting in a periodic oscillation Reconstruction of crabbing made using measured intra-bunch position Assuming a Gaussian transverse distribution T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

Head-Tail correction for CC Well phased CC results in a static intra-bunch position offset at the HT pick-up HT monitor measurement has a “baseline” which is superimposed on the signal Orbit offset, imperfections in PU/hybrid, … Reduces available dynamic range In SPS correction has been performed by taking a reference measurement in each cycle with the cavities un-phased or off Works well, but not a technique that is applicable to long fills in HL-LHC… Correction of asymmetry due to PU & cable response also needed T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

HT in HL-LHC Existing HT monitor locations optimised for high β BPLH.7R4.B1 & BPLV.A6R4.B1 BPLH.6R4.B2 & BPLV.7R4.B2 These locations do not necessarily have good phase advance with respect to the CC in IP1[H] and IP5[V] ~1m of space reserved between Q5 and Q6 on both left and right of P4 (location of existing BQK) for new pick-ups LHC-BPW-EC-0001 Pick-up type (EO vs. standard, etc) not yet decided Baseline is 1 BPM per beam/plane T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019 BPLH.7R4.B1 BPLV.A6R4.B1 BPLH.6R4.B2 BPLV.7R4.B2 T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019 BPLH.7R4.B1 BPLV.A6R4.B1 BPLH.6R4.B2 BPLV.7R4.B2 T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019 BPLH.7R4.B1 BPLV.A6R4.B1 BPLH.6R4.B2 BPLV.7R4.B2 T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019 BPLH.7R4.B1 BPLV.A6R4.B1 BPLH.6R4.B2 BPLV.7R4.B2 T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

(Preliminary) Conclusion Based on the latest optics, although the phase advances are not optimal, the crabbing should be visible at the current HT pick-ups (with averaging) Order of 10μm residual for both cavities on (at the limit) Order of 100μm for single cavity at 3.4 MV Some possibility for optimisation by moving pick-ups Note: optimum for single cavity is not the same as for the residual Space of existing BQK has been reserved for new pick-ups Exact technology choice (EO vs. standard) not yet decided Still some open questions for the signal processing to be investigated Baseline evolution with bunch parameters How to do baseline correction during a long fill Cable transfer function deconvolution T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

Thank you T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

Correction for instability diagnostics Baseline corrected by subtracting average of many turns of signal Removes baseline, preserves varying signal T. Levens, 8th HL-LHC Collaboration Meeting, 15-18 October 2018, CERN

HT Monitor upgrade YETS17-18 During YETS17-18 new oscilloscopes have been installed for LHC & SPS HT monitors: Significant upgrade in resolution, acquisition length and readout speed compared to old models New dedicated 10 GbE fiber link from UA47 to dedicated storage server in CCR to avoid saturating technical network Pick-ups, hybrids & cabling are unchanged Model Samp. Res. Turns Readout File Size Old 10 GSPS 8-bit 11 3 MB/s 40 MB New 10-bit 451 170 MB/s 3.2 GB T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019

HT Monitor upgrade YETS17-18 Old ~9dB lower noise floor New T. Levens - 152nd HiLumi WP2 Meeting - 02/07/2019