Directed Change Constructive Change

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Contracting
Roles & Responsibilities in Construction Management
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
ABC Change Orders College of Environmental Design
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Circular A-110 Everything You Didn’t Want to Know.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Engineering 221 Drawings and Specifications.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Construction Engineering 221 Contracts & Contractor Procurement.
Construction Engineering 221 Cost Estimating and Bidding.
Change Orders. Build the project that was bid and awarded.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Standards of Practice Course
CONSTRUCTION ADMINISTRATION Changes and Extra Work in Construction Management Dr. Alaattin Kanoğlu Spring, 2013 Professonal Practice Management I.B.U.
Construction Contracts and Project Delivery Methods
Compensation events and claims Presented by Prof. Khem Dallakoti.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
COMPETITION REQUIREMENTS
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
King Fahd University of Petroleum & Minerals
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Measurement and Payment
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Construction Management At Risk Process
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
Change Orders on Federal-aid Highway Construction Projects Bren George-Nwabugwu (FHWA) ; (317)
1 Punch list / Close Out - Project Completion Best Practices May 2016.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
Project Risk Management Execution FE302 Lesson 5 June 2015 Changed Conditions on Construction Projects.
CONTRACT ADMINISTRATION
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Financial Management
Estimating Project Costs
(Additional materials)
Request for Proposal & Proposal
Certificates JCT 11 SBC allows for 10 different kinds of certificates.
ARCH 435 PROJECT MANAGEMENT
Controlling Project Cost and Schedule
Construction Contracts
Supervisor: Eng. Mohammad abu neama
Value Engineering In Design
State Aid Construction
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Directed Change Constructive Change Owner directs contractor to do work No question change occurred only how much it costs Constructive Change Informal act authorizing or directing a modification of the contract caused by an act or failure to act Owner causes contractor to increase costs/time -> change order

Major cause of disputes Constructive changes Defective plans and specs Engineer’s interpretation Higher standard of performance than specified Improper inspection and rejection Change in method of performance Change in the construction sequence Owner disclosure Impossibility/impracticability of performance Major cause of disputes Usually center around plans and specs A/E interpret differently than contractor

Elements of a Change Order ID of change order Description of change Reason for change Change in contract price Change in unit prices change in contract time Statement that secondary impacts are included Approval by owner’s and contractor’s reps

Following is a list of items to discuss in contract Change orders are responsible for more disputes than any other aspect of project Following is a list of items to discuss in contract % for overhead and profit, costs that will and will not be included in price Length of time that a change order proposal price is firm Determination of the individual rep of owner who is authorized to ok CO

Procedures to follow in submittal of CO’s CO forms to be used Time extensions required Detail required by contractor when submitting CO proposals – complete cost breakdown? Drawings Overtime necessary due to CO – decreased productivity When materials or equipment is to be removed – who owns it Responsibility for record drawings brought about by COs

Purposes served by change orders Change contract plans or specify the method and amount of payment and changes in contract time Change contract specs Effect agreements concerning order of work Administrative purposes to establish method of extra work payment and fund for work stipulated in contract Authorize an increase in extra work funds to complete changes

Cover adjustments to contract unit prices for overruns and underruns, when required Effect cost reduction proposals (value eng) Effect Payment after claim settlements

o Consideration for evaluation Differing site conditions Errors and omissions in plans and specs Change from regulatory agency Design changes Overruns/ underruns in quantities beyond limits Factors effecting time of completions

Evaluating delays in the work Was cause of delay beyond control of contractor Was GC ready and able to work Did the GC submit a detailed schedule projecting completion within time allotted Schedule updated regularly Did updated schedule justify time extension CPM analysis

Has the GC proven “unusually severe weather” with reliable data Contractor maintained sufficient forces in CP activities to meet target dates How have causes other than normal weather, beyond the control of and not caused by the GC affected the target date Has the GC proven “unusually severe weather” with reliable data Did weather cause delays to CP activities Was GC shut down for other reasons

Change order justification Did GC promptly and before such conditions were disturbed comply with owner’s modification requirements Did GC make a site inspection and evaluate conditions prior to bid Is construction layout right- who did staking Did utilities locate their facilities, where marks protected, where facilities protected

Change Order Process Initiation Anyone can initiate a change order Change to plans, additional work, deleted items Preparation Clear, concise, explicit What needs to be done, how much is it worth, additional time? Authorization Only owner or their agent can sign