ISG SG Closing Report Date: 2011-01-20 Authors: January 2012 doc.: IEEE 802.11-12/0139r0 January 2012 ISG SG Closing Report Date: 2011-01-20 Authors: Stephen McCann, RIM Stephen McCann, RIM
January 2012 doc.: IEEE 802.11-12/0139r0 January 2012 Abstract Closing report for Infrastructure Service Discovery Study Group (ISD SG) for January 2012, Jacksonville, FL, USA Stephen McCann, RIM Stephen McCann, RIM
Summary Plans for March 2012 Two presentations on use cases: January 2012 doc.: IEEE 802.11-12/0139r0 January 2012 Summary Two presentations on use cases: 11-12-0084-00-0isd-use-cases.ppt 11-12-0144-00-0isd-isd-use-cases.ppt Extensive discussion on scope, although no final agreement was met. Generated a liaison to the Wi-Fi Alliance requesting a copy of the Wi-Fi Direct training slides for ISD SG study (motion later) Plans for March 2012 Decide on scope for the SG Produce a Requirements document Start on the PAR and 5C documents Stephen McCann, RIM Stephen McCann, RIM