Indiana Department of Environmental Management Office of Water Quality

Slides:



Advertisements
Similar presentations
Past and Current Initiatives in Pinellas County to Coordinate Planning between the School Board and Local Governments 1996 – Interlocal Agreement and Comprehensive.
Advertisements

Proposed Regulatory Framework for Wastewater Presented by Claude Fortin Winnipeg, Manitoba December 6, 2007.
Indiana Department of Environmental Management
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Grantham Dock Setback Waiver BD Orange County Board of County Commissioners May 13, 2014.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Regional Sewer Districts and IDEM Bruno Pigott Assistant Commissioner Office of Water Quality September 22, 2009 The Indiana Department of Environmental.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department.
National Pollutant Discharge Elimination System -NPDES Permit Process-
December 9, WHY?  1 st Call: September 2003  2 nd Call: January 13, 2011  Hearing: May 1, MONTHS.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
File & Suspend Rate Cases Water & Wastewater Reference Manual1.
Air & Waste Management Association Southern Section Tennessee Solid Waste Update Barry R. Stephens, P. E. September 12, 2012 Department of Environment.
Sector Planning Process Alachua County Commission July 8 th,
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
Where to find Information About Facilities. Overview of Title V Permits.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Water Supply Planning Initiative State Water Commission November 22, 2004.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING Wednesday, September 13, 2006.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
ENVIRONMENTAL PRIORITIES PANEL Chris Korleski, Director, Ohio EPA Tom Easterly, Commissioner, IDEM Official Representing New KY Governor Beshear.
Administrative Law The Enactment of Rules and Regulations.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
1 Indiana Regional Sewer District Association Annual Meeting Thomas W. Easterly, P.E., BCEE, Commissioner Indiana Department of Environmental Management.
Water Quality Certification for hydropower licensing in Wisconsin.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
1 Public Meeting Regarding US Steel’s Gary Work NPDES Permit Renewal September 26, 2007 IN Department of Environmental Management.
Streamlining Rules for Pretreatment Regulation Requested changes to Chapters 922 & 923 of the City of Zanesville Codified Ordinances Presentation to City.
HORSE CREEK WATER SERVICES INC GENERAL RATE APPLICATION.
Wastewater Treatment and Disposal Upgrade Nampa Wastewater Advisory Group Meeting #10 October 9, 2012.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Ordinance Amending Chapter 37 of the Orange County Code Orange County Board of County Commissioners Public Hearing April 3, 2012.
Value Adjustment Board
Department of Environmental Quality
Waste Discharge Permit: Paradise Irrigation District
AHCCCS/ALTCS Service Appeal Process Flow Chart
Grid Code Development Forum – 6 September 2017
Grid Code Review Panel 16th August 2017
Wastewater Systems Effluent Regulations
Triennial Review of Water Quality Standards Proposed Rulemaking
Concentrated Animal Feeding Operations (CAFOs) National Pollutant Discharge Elimination System (NPDES) CAFO Rule and the Proposed Idaho NPDES CAFO General.
Department of Environmental Quality
National Environmental Policy Act of 1969
Department of Environmental Quality
Environmental Assessment PUC Application Process
Groundwater and Waste Management Committee November 9, 2016
Environmental Management Commission January 10, 2013
John Tinger U.S. EPA Region IX
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Department of Environmental Quality
Department of Environmental Quality
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Julie Woosley, Division of Waste Management
EPA Region IV and ADEM NPDES Permit Coordination
High Rock Lake TMDL Development
Department of Environmental Quality
TCEQ Environmental Trade Fair Water Quality Division
Wyoming Administrative Procedure Act
Paid Family and Medical Leave
Procedures to Implement the Texas Surface Water Quality Standards
Presentation transcript:

Indiana Department of Environmental Management Office of Water Quality National Pollutant Discharge Elimination System Permit Carriage Estates Wastewater Treatment Plant Permit No. IN0043273

What is a NPDES Permit? It is sort of a license…. Issued by IDEM, which permits a facility to discharge a safe level of substances from a wastewater treatment plant into Indiana’s waterways and specifies necessary terms and conditions to protect Indiana’s waterways

NPDES Permit Elements NPDES Permits contain the following elements: Effluent Limits protective of the receiving waters Monitoring and Reporting Requirements Record Keeping Requirements Special Conditions Standard Conditions Pretreatment Conditions, if applicable Combined Sewer Conditions, if applicable

Carriage Estates WWTP NPDES Permit Authorizes the discharge of treated effluent into Indian Creek. Contains effluent limitations applicable to both the 1.5 MGD facility and the proposed upgrade to 4.0 MGD. Effluent limitations are developed to protect the receiving water during critical low flow conditions. The United States Geological Survey (USGS) recently updated the critical low flow values for Indian Creek in 2014 after IDEM’s original evaluation of the proposed discharge in 2013. IDEM has reviewed the situation and has determined that the change in the critical low flow values will not significantly impact the effluent limitations that are included in the NPDES permit. IDEM will update the evaluation to reflect the updated USGS flow data.

Carriage Estates WWTP NPDES Permit Parameters to be monitored and limited in the permit are: CBOD TSS Ammonia-nitrogen pH Dissolved Oxygen E. coli Phosphorus Interim Total Residual Chlorine

Public Process By rule, NPDES Permits are public noticed for a 30 day period to give potentially affected and interested parties an opportunity to comment on the proposed NPDES Permit. The Draft NPDES Permit is available for review upon request During the public notice period requests for a public hearing or meeting on the proposal are taken All public comments are taken as part of public record and are considered in IDEM’s final decision

Public Process Public Hearing: Public hearings are held when requested and when deemed appropriate by IDEM. A public hearing is a forum in which interested parties provide comments for the record, but IDEM does not formally respond during the event. A transcript is developed and all comments become part of the public record and are used in the development of a final determination on the permit action.

Final Determination All concerns and comments, within the authority of the NPDES permit program, received during the public notice period will be evaluated and considered in the final permit action. If no changes are warranted due to the comments received, the NPDES Permit will be issued to the applicant. If information is received that the proposed discharge is in conflict with applicable statute and/or rules the NPDES Permit Application may be denied. If major adjustments need to be made to the NPDES Permit, the NPDES Permit will be placed on an additional 30 day public comment period.

Appeal Procedures For 18 days following the decision to issue or deny a NPDES Permit, any aggrieved party may file a petition to the Office of Environmental Adjudication for review of an Administrative Law Judge

Carriage Estates WWTP Proposed NPDES permit Timeline January 21, 2013, Lakeland InnovaTech requested Preliminary Effluent Limitations for a potential upgrade to the facility. March 8, 2013, IDEM completed a Wasteload Allocation Analysis/Antidegradation Analysis that developed applicable effluent limitations for a facility upgrade up to 6.8 MGD. March 26, 2013, IDEM sent a Preliminary Effluent Limitations letter to Lakeland InnovaTech. January 13, 2014, Lakeland InnovaTech/American Suburban Utilities submitted an application for a Construction Approval. February 21, 2014, IDEM issued Construction Approval No. 20788 to upgrade the facility from 1.5 MGD to 4.0 MGD.

Carriage Estates WWTP Proposed NPDES permit Timeline March 2014, Construction Approval No. 20788 was appealed for Administrative Review at the Office of Environmental Adjudication. August 21, 2015, American Suburban Utilities applied for renewal of the NPDES permit, including the proposed upgrade to the facility to discharge to Indian Creek. September 4 – October 5, 2015, The draft NPDES permit was placed on public notice. Several comment letters and requests for public hearing were received during this period. November 13 – December 15, 2015, IDEM noticed the intent to hold a public hearing on the draft NPDES permit.

Permit Information Draft Permit is available at: Tippecanoe County Health Department, 20 N. 3rd St. Lafayette, IN 47901 IDEM’s Central Office IDEM’s website, http://www.in.gov/idem/cleanwater/2480.htm Comments may be submitted until December 29, 2015. Send comments to: Email: jahouse@idem.in.gov Mail: IDEM/OWQ/NPDES Permits, Rm 1255, Attention: Jason House, 100 N. Senate Ave. Indianapolis, IN 46204