ELECTRICAL SAFETY AUDIT for XYZ Gujarat

Slides:



Advertisements
Similar presentations
Electrical & Instrument Construction Department
Advertisements

Global Developments in Electrical Safety Electrical Safety week, ICF, Perambur, 13th June 2003 P.G. Sreejith Cholamandalam AXA Risk Services Ltd.
The Electrical GuruTM Paul W. Abernathy,CME
Substation L1/ MCC L1 Update March 21 st, Current Location.
Electrical Safety.
Electrical Installation
1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
Inspection & Preventive maintenance of breakers
Electrical Safety 29 CFR I. Background for the Trainer:
CHREID 2008 ELECTRICAL SAFETY Introduction and Overview of Safety Clayton H. Reid September, 2010.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
Electrical Power Systems
Electrical Principles and Wiring Materials
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
BUILDING TRADE SAFETY ELECTRICAL SAFETY.
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
Area of Study 2: Electricity
Vidhyadeep Institute Of Management & Technology, Anita, Kim Electronics & Communication Department Guided by Mr. Vicky Paperwala.
CHOLAMANDALAM MS RISK SERVICES LTD.
Electricity at Work.
Electrical Safety.
Pole Mounted Switch Disconnector NPS
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Electrical Principles and Wiring Materials Unit #31.
Electrical Principles and Wiring Materials Unit #31.
Chapter 7 Safety. Introduction This chapter covers the following topics: Dangers of electricity Preventive measures Electrostatic discharge Safety practices.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Electrical Principles and Wiring Materials Original Power Point Created by Casey Osksa Modified by Georgia Agricultural Education Curriculum Office June.
A Presentation On 132 KV GSS BEHROR
SEMINAR PRESENTATION ON 220 KV GSS UDAIPUR
ON 400 KV GSS RAISER JAIPUR ROAD ,BIKANER
Testing of Low Voltage Installations
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
Brandon Portable Appliance Testing & R.C.D. Training The benefits, frequency and procedure for electrical safety testing.
ELECTRICAL INSTALLATION IN BUILDING
BY FRANS WILBRINK WILBRINK & ASSOCIATES. OUTLINE Classify the different types of hazardous areas Identify the risks associated with each of these areas.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Procedures for work on Fixed Electrical Installations Toolbox Talk 2: Duties of Staff and Contractors.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Electrical Safety.
Presentation on Sub-station Design, Operation, Maintenance & Safety
Electrical Principles and Wiring Materials
DESCRIPTION AND GUIDE TO OPERATIONS
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
HOME ELECTRICAL SAFETY
Practical electricity
Personal Protective Equipment
Chapter Six Ground-Fault Circuit Interrupters, Arc-Fault Circuit Interrupters, Surge Protective Devices, Immersion Detection Circuit Interrupters, and.
Engineering Project Cable Management.
Emergency Electrical Power Supply for Buildings
ELECTRICAL POWER-II Electrical engineering sixth semester
EET 323 – Electrical System Design Lecture 9: Grounding
A. Touching both terminals with the hands can cause electrical shock
Electrical components and systems
Electrical components and systems
Presentation transcript:

ELECTRICAL SAFETY AUDIT for XYZ Gujarat October 4 to 6, 2004 Cholamandalam MS Risk Services Ltd. Chennai www.cholarisk.com

Cholamandalam Risk Services Ltd. A JV between Murugappa Group & MS Insurance, Japan Executed RM services for various clients- India & rest of Asia

ELECTRICAL SAFETY SERVICES -CLIENTS MRPL Refinery, Mangalore Shasun Chemicals, Cuddalore Ahmedabad Electricity Company, Ahmedabad Orchid Pharmaceutical Company, Chennai EID Parry Biochemicals, Tamil Nadu BPCL, Manmad Vikram Cements, Madhya Pradesh Chambal Fertilizers, Rajasthan TI Diamond Chain, TN HLL, Haldia Visaka Cements, Andhra Pradesh Bombay Dyeing, Patalganga GMR Power plant, Mangalore CP Aqua Culture, TN Surat Electricity Company, Surat Aditya Cements, Rajasthan

Close Out Presentation ESA –approach, methodology & coverage XYZ- High Priority Areas XYZ-ESA- observations & recommendations

ESA – Scope, Methodology & Coverage

ESA- Scope of work Compliance to IER Electrical hazard identification: Shock, fire Lightning Protection HAC Earthing Static electricity issues EPM Accidents Review of All records & documents Training Electrical Protection Sample tests Temperature Current Earth Resistance

ELECTRICAL SAFETY AUDIT ESA IS A SYSTEMATIC INDEPENDENT REVIEW TO VERIFY CONFORMANCE WITH ESTABLISHED GUIDE LINES OR STANDARDS TO IDENTIFY, ASSESS & CONTROL ELECTRICAL RISKS ESA IS CARRIED OUT BY WAY OF PHYSICAL EXAMINATION, SAMPLE TESTS, REVIEW OF RECORDS AND DISCUSSION WITH VARIOUS DEPARTMENTS & PLANT PERSONNEL

ESA Methodology Opening Meeting -Familiarization Discussion with Head-Electrical, review of key SLD ESA Physical inspections Sample Testing Document & records review Meeting –various departments Close-Out meeting Interim Report Final report submission

AUDIT SCHEDULE (4 – 6 October 2004) 4 October - opening meeting, electrical system briefing, Main SLD review, switchyard visit, SS A,B, C, DG House, manufacturing blocks 5 Oct - Auditing of balance manufacturing areas completed 6 Oct – ER tests, Review of records & close out meeting+ discussion with relevant departments (safety, R&D, health centre, instrumentation, documentation, contractors, contract department, purchase, etc.)

Audit Coverage 66 KV S/Y DG House All Sub Stations (A, B, C, E) Transformers-various areas CNC Shop HT Motor Building VPI Area IMB Area DT Area Transformer Manufacturing Area, SS E Admin Building Relay Building Auxiliary I & II building Electroplating/ Anodizing Turbocharger Area HV Disconnector Area Fuel Tanks (HSD, Solvent, Transformer oil) LTB Area Health Centre Workers’ Canteen

ESA -Standards & Codes BIS Publications NFPA Codes OISD Standards Indian Electricity Rules, 1956 British Standards Best Engineering Practices

ESA – Observations & Recommendations

Very receptive to improvement suggestions Availability of skilled technocrats, global expertise OHSAS 18001 certified plant Availability of testing resources Existence of systems and procedures

LIMITATIONS VERY OLD PLANT UNPLANNED EXPANSIONS RAPID GROWTH REQUIRES FUTURE PLANNING LIMITED MAINTENANCE FORCE IN CERTAIN AREAS

XYZ -High Priority Areas PTPT Area- 1.5 MVA transformer, overloaded electrical panel CNC Shop floor- bay lightning panel Earthing issues SS- E, PTPT areas – responsibility to be defined Electrical hotspots at terminations – potential fire hazard Electrical Panels – requires due attention Fire Hydrant system to be installed DGs in another plant area

Transformers Silica gel in several transformers- to be re-activated Neutral & body earth pits are not identified Oil soak pit for transformers with oil capacity above 2, 275 L (IER- 64- iv), eg. 4 MVA Oil draining arrangement for transformers above 9 KL capacity (Transformer EHV testing yard, 30 MVA transformer)- IER 64 v Annunciation for 7 MVA transformer not operational

Electrical Injuries Use HRC fuse pullers to remove fuses 30 mA ELCBs used in DBs, extension boards Insist on using PPEs while working on live lines Battery rooms-cover battery terminals Identification of feeders / panels / circuits - missing Use of live U/G cable locator before excavation Maintain U/G cable lay out for reference No resuscitation chart displayed

Automated External Defibrillators (AED) 250,000 deaths every year due to sudden cardiac arrest AEDs - to be part of Emergency Medical Kit For every minute that passes w/o defibrillation, the chances of survival decreases by 10% Has a voice prompt, cost USD 3000/- UK - not a legal requirement, but a Statutory requirement in US No legal liability for deaths involving the use of AEDs

Fire Detection & Protection Install smoke detection in: Un manned sub stations Review the Fire Alarm panel maintenance (discharged batteries) Heavy grass growth noted in outdoor switch yard and SS E transformer yard Review smoke detector adequacy and installations in buildings as per TAC FA rules Review Portable Fire Extinguisher installation based on IS 2190 (Turbocharger area) DG MCC room- install smoke detection Install Passive Fire Protection (PFP) measures in DG house, SS, various cable passes Include electrical fire scenarios in EMP

Fire Protection XYZ to consider installation of fire protection system Review PFE installation in various manufacturing blocks Consider HVWS system for 30 MVA transformer

Electrical Systems & Procedures Electrical WPs / Electrical isolation Procedure: To be defined At present, only for contractors, include for XYZ employees also LOTO / Tag Out with fuse removal recommended Electrical Change Control Procedure (ECCP) to be incorporated in all equipment modifications /additions (overloading issues in PTPT –MDP 1) Display updated & approved SLDs in all SSs (no SLDs available for MDPs, SDPs) for ready reference Include electrical fire scenarios (SS, transformers) in Emergency Management Plan (EMP)

Earthing Earth resistance tests to be done for individual pits too. Earthing lay out to be updated Earth pits may be provided with identification marks Single earthing for 415 V equipment –several areas Structures to be earthed (PTPT Area- solvent tanks, etc.) 4.5 Ohms noted in PTPT area Ensure supervision while ER measurement 66 KV SY fence to be earthed

Earth Leakage Tester The earth resistance from the equipment to the earth pit can be measured Non-Contact measurement Continuity loop test No electrodes required Cannot be used on flat conductors

Electrical Preventive Maintenance Sky wire maintenance may be taken up annually to check up its physical condition /replace with vertical rods Bucholtz relay to be simulated for operation for transformers Install surge counters and leakage meters in S/Y Gravel to be put in yards (66 KV, SS E transformers) 66 KV SW /Y -SF6 cubicle – not maintained, relay not calibrated, PS setting

Electrical Maintenance…. SS A- battery charger power comes from another plant through a COS SS log – to be reviewed by electrical maintenance in charge on a daily basis DGs- diesel oil level also needs to be monitored Electrical Protection co-ordination study to be done (various load additions, HT motor test, etc.) DGs- include trip and alarm settings in the log book

EPM…. Non-standard electrical rubber mat used in several places DGs installed in another plant premises: BC II (between XYZ DGs & another plant DG)to be locked in off condition Approval from CEIG?

EPM…. Series earthing for equipment Non-qualified electrical contractor electricians also are available Large lug for termination Loose terminations No cable glands Cable trenches behind electrical panels- require periodic cleaning- fire hazard

EPM… Consider SRVs for 5 MVA indoor transformer (4050 L oil) at HT Motor test bay Consider oil soak pit Extension boards not fitted with RCCBs CNC SHOP Main Electrical Panel: Oil soaked rubber mat Saw dust Oil barrels kept close to the panel Aluminum lugs used on copper bus bars CNC lighting bay distribution panel- requires immediate attention

EPM… Electricians & test personnel to be given electrically tested safety shoes Use DI portable tools, instead of metallic tools No reference drawings for SDP / MDPs Re-wirable fuses used in SDP A2 Fuse DB – IMB Area Electrical isolation – to be defined as part of the electrical work procedure

EPM…. Store room in DT building – install master control switch outside the room List of C- license holders may be displayed in main SS SS- E electrical maintenance- requires immediate attention: 1.5 MVA transformers- low oil level, yard full of grass, all alarms on Overloading in one of the DPs Compressors- identification and load distribution requires review

EPM…. SS E – Compressors- series earthing followed HSD, solvent pipelines – flanges may be bonded to avert static discharges leading to fires, install FLP on-off push buttons Now almost all mobile equipment has cable ends w/o plugs, install power receptacles wherever needed Keep all transformer yards locked ( SS E) All feeders may be identified (Electroplating section)

EPM…. Turbocharger electrical panels – no access, broken switch handles ER tests: No updated L/O drawing High ER value PTPT area: 4 ohms plus Electrical maintenance to supervise ER tests SS C- identify both rear and front panels with the same identification marks EPM- not complete, panels not included, not based on standards- re-align EPM based on NFPA 70 B

EPM… SS B- 25 KVA UPS panel & batteries installed on wooden boards, temporary manner MCC / MDP / SDP maintenance: Cob webs Dust Open cable openings Keep panel keys at every sub station Keep HRC fuse pullers in sub stations- now pliers / bare hands are used. Use fully insulated fuse pullers / tools as required

EPM… Heavy oil leak at radiator flange- SS B transformer 1.5 MVA Critical loads- consider redundant cable from another feeder, follow another route Single isolator used for multiple loads (HT Motor MDB 1, VPI DP 3) Almost all spare feeders got used- consider revamp of electrical system, considering load additions for 10 years U/G cable installation – to be done as per IS 1255 Use live U/G cable locator before digging Use U/G cable lay out for reference / install route markers

OISD 137-Electrical Equipment Inspection Polarization Index Test PI = R10m /R1 m 2.5 –Excellent /Good 1-2-Questionable Relative value, shows IR deterioration trend Moisture Absorption Test K = R1m / R15s 1-damp insulation 1.3 or greater-dry

Electrical Maintenance Transformer OLTC counter reading- OEM recommended maintenance to be carried out Consider using NFPA 70 B or OISD 137 for electrical preventive maintenance XYZ to consider hotspot detection and Thermography surveys as part of predictive maintenance XYZ to define AMC jobs as per standard practices (battery maintenance, etc.)

EPM…… OLTC counter based EPM – not done, including oil test for diverter compartment Load currents of various loads taken: PTPT building- MDP 1- overloaded Final report will have more details, based on details sought Hotspot Detection: MDP 1, PTPT- 150 Degree C LTB Area– A4, Bay IV DP – 110 Degree C DT Area, Main Panel, 2 F2 DB Panel 2 – 77 Degree C

Infra-Red Hotspot Detector Used as part of effective EPM Hotspot surveys on critical, high capacity motor terminations, measurement of continuously running critical motors Uses infra-red technology, with laser sighting Very effective as a predictive maintenance tool Interpretation of readings - very critical

Thermography Surveys Part of E-RBM Programme Identification of potential survey points / equipment and interpretation - very crucial NFPA 70 E recommends Thermographic surveys

Ultrasonic Detectors Detects fault conditions from sounds due to tracking, corona, arcing Portable instrument, can be used on outdoor switchgear, panels, etc. Non-Contact type

‘All electrical accidents are preceded by rise in temperature & sound’

Lightning Protection Number of thunderstorm days, Baroda: 8 LP not as per IS 2309 / NFPA 780- identify critical plants / areas and install LP for critical plants / buildings Buildings EHV test stations

Surge Protection Most modern electronic systems are at risk:     computers data communication networks building management systems PABX telephone exchanges CCTV equipment fire and burglar alarms telecom base stations uninterruptible power supplies (UPSs) programmable logic controllers (PLCs) plant sensors telemetry and data acquisition equipment. Ensure surge protection for your EPBAX, DoT lines, UPS & Communication equipment

Innovative Electrical Safety Products

More ES Products Non-Contact type voltage detector (magnetic field) Plug-In Wiring Checker (detects 14 wiring defects, ideal for testing sockets, BS 1363, faulty N, missing E, reverse P& N) Videoscanner, Metalliscanner (detects metallic pipes, conduits, rebar, within 15” concrete)

Automatic Fire D&E System Fire Trace - local flooding application inside electrical switch gears / power panels- detects heat and the heat -sensitive tube punctures, letting out Ozone-friendly fire extinguishing gas

Linear Heat Sensing Cables * Advantageous than detectors, more effective Consists of two cores separated by heat sensitive insulation LHSC applications: Cable trays in cable galleries Transformers Switch gears

AFCIs Arcs - temperatures up to 20,000 degree C, Sun’s outer temperature- 5000 degree C No material on earth can withstand arc temperature RCCBs cannot detect arcing faults AFCIs - the innovative ES device after RCCBs AFCIs detects arcing waveforms and trips AFCIs - mandatory in all US homes from 2002 January onwards

Arcing Waveforms A loose wire at one terminal of a light bulb. Arcing generated by a loose wire at a screw terminal.

THANK YOU!!! Cholamandalam Risk Services Ltd.