TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.

Slides:



Advertisements
Similar presentations
Microsoft Project Assigning Resources to Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
Advertisements

Microsoft Project Tutorial for Chapters 6 & 7
Linking Project tasks Create lag time and lead time Life can be complicated. What if your plan needs to include complex task relationships? In Project,
Microsoft Access.
1 After completing this lesson, you will be able to: Create a database. Create a table using the Table Wizard. Create and modify a table in Design view.
Projmgmt-1/12 Depaul University Scheduling Tasks In MicroSoft Project Instructor: David A. Lash.
CIS 480 Systems Analysis and Design
Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
Integration Integrating Word, Excel, Access, and PowerPoint
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
AS ICT Building MS-Access Databases. Creating a Combo Box Drop Down List 1.When creating a Field requiring a Drop Down list in a Table, select the Lookup.
MS-Access XP Lesson 1. Introduction to MS-Access Database Management System Software (DBMS) Store data in databases Database is a collection of table.
Microsoft Project.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
TUTORIAL 3 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 14/10/2012 Introduction to MS Project 2007.
Project Information: Customizing and Printing Lesson 7.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
Microsoft Project 98 Tutorial1 Microsoft Project 98 Presented By: Ipsita B. Chowdhury.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Projmgmt-1/15 Depaul University Adding Resources In MicroSoft Project Instructor: David A. Lash.
Starting a New Project Cheryl A. Wilhelmsen Lee Ostrom.
Cost Data (Cont) Session 13. Agenda  Continuation from sessions on cost data.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Project Plan Formatting – Fundamentals Lesson 6. Skills Matrix SkillsMatrix Skill Format a Gantt ChartModify the Gantt Chart using the Bar Styles dialog.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Excel And Microsoft Project Technology Plug-In T12.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Fine-Tuning Tasks Lesson 11. Skills Matrix SkillsMatrix Skill Manage task constraints and dependencies Explore the effects of constraints and dependencies.
Managing Multiple Projects Lesson 9. Skills Matrix SkillsMatrix Skill Manage consolidated projectsCreate a consolidated project plan Create dependencies.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
Tracking progress on tasks and assignments TUTORIAL # 3.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
1 Microsoft Project 2003 Chapter 5 Setting Up Resources.
TUTORIAL 4 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 04/11/2012 Introduction to MS Project 2007.
The Project Plan IT Project Management COSC
M.S. Project: Management Skills for Planning and Controlling Projects Assabet After Dark.
Using Microsoft Project Gavrilă Cristian. Using Microsoft Project 1. Introduction 2. Tasks 3. Resources and costs 4. Fine tunning 5. Publishing projects.
TUTORIAL 2 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 19/02/2012 Introduction to MS Project 2007.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
TUTORIAL 7 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 08/04/2012 Introduction to MS Project 2007.
TUTORIAL 5 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 18/11/2012 Introduction to MS Project 2007.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
TUTORIAL 9 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 22/04/2012 Introduction to MS Project 2007.
TUTORIAL 8 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 15/04/2012 Introduction to MS Project 2007.
Establishing Resources Lesson 2. Skills Matrix SkillsMatrix Skill Establish people resourcesEstablish individual people resources Establish a resource.
Microsoft Project Tutorial Jesal Bhuta
6. TRACKING PROGRESS. OBJECTIVES Save current schedule values in a plan as a baseline. Record progress on tasks through a specific date. Record tasks’
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 8: Introduction to MS - PROJECT L E C T U R E 8 INTRODUCTION TO MS.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
Introduction to MS Project.  IN THIS EXERCISE, YOU’LL START PROJECT PROFESSIONAL Starting Project Professional.
Managing Resources with Microsoft Project May 18, 2005.
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Project Schedule Tracking Fundamentals Lesson 9 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project.
Fine-Tuning Tasks Lesson 5 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
Microsoft Project 101: How to Build a Project Plan
Software project mgt. session # 3– lab manual.

MS Project 2016 Level II
Software project mgt. session # 3– lab manual.
SSI Toolbox Status Workbook Overview
Entering the Task List Dr. George.
Presentation transcript:

TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007

Tracking Progress on Tasks In This Chapter, You will Learn How to: Save current values in a schedule as a baseline. Record progress on tasks through a specific date. Record a tasks percentage of completion. Enter actual work and duration values for tasks 2

Saving a Project Baseline After developing a project plan, one of a project managers most important activities is to record actuals and evaluate project performance. To judge project performance properly, you will need to compare it with your original plan. This original plan is called the baseline plan or just the baseline. A baseline is a collection of important values in a project plan such as the planned start dates, finish dates, and costs of the tasks, resources, and assignments. When you save a baseline, Project takes a snapshot of the existing values and saves it in your Project plan for future comparison.baseline 3

Saving a Project Baseline In this exercise, you save the baseline for the TV commercial project and then view the baseline task values. On the Tools menu, point to Tracking, and then click Set Baseline.Tracking, The Set Baseline dialog box appears. Youll set the baseline for the entire project by using the default settings of the dialog box. Click OK. On the View menu, click More Views.View In the Views box, click Task Sheet, and then click the Apply button. On the View menu, point to Table: Entry, and click Variance.ViewVariance The Variance table appears. This table includes both the scheduled and baseline start and finish columns, shown side by side for easy comparison. 4

Tracking a Project as Scheduled In the TV commercial project, suppose that some time has now passed since saving the baseline. Work has started, and so far, so good. In this exercise, you record project actuals by updating work to a specific date On the View menu, click Gantt Chart.View On the Tools menu, point to Tracking, and click Update Project.Tracking, Make sure the Update work as complete through option is selected. In the adjacent date box, type or select 25/11/12. Click OK. 5

Entering a Tasks Completion Percentage After work has begun on a task, you can quickly record its progress as a percentage. In this exercise, you record completion percentages of tasks via the Tracking toolbar. On the View menu, point to Toolbars, and then click TrackingView Tracking Click the name of task 4, Pick Locations On the Tracking toolbar, click the 100% Complete button Click the name of task 5, Hold auditions On the Tracking toolbar, click the 50% Complete button. Now take your mouse over the bar in the Gantt chart, you will see the completion of that task in percentage. 6

Entering Actual Values for Tasks A more detailed way to keep your schedule up to date is to record what actually happens for each task in your project. You can record each tasks actual start, finish, work, and duration values. click the name of task 5, Hold auditions On the View menu, point to Table: Entry, and click Work.View Work In the Actual field for task 5, type or select 80, and then press EnterActual In the Task Name column, click task 8, Rehearse. On the Tools menu, point to Tracking, and then click Update TasksTracking, 7

Entering Actual Values for Tasks In the Start field in the Actual box on the left side of the dialog box, type or select 25/11/12.Actual In the Actual dur field, type or select 3d Click OK. In the Task Name column, click task 9, Shoot Video On the Tools menu, point to Tracking, and then click Update Tasks.Tracking, In the Actual dur field, type or select 3d, and then click OK. On the Standard toolbar, click Scroll To Task On the View menu, point to Toolbars and then click Tracking.View Tracking Project hides the Tracking toolbar 8

ADVANCED PROJECT SCHEDULING Part 2 :

Fine-Tuning Task Details Adjusting Task Relationships You might recall from Chapter 2, Creating a Task List, that there are four types of task dependencies, or relationships:Chapter 2Creating a Task List Finish-to-start (FS): The finish date of the predecessor task determines the start date of the successor task. Start-to-start (SS): The start date of the predecessor task determines the start date of the successor task. Finish-to-finish (FF): The finish date of the predecessor task determines the finish date of the successor task. Start-to-finish (SF): The start date of the predecessor task determines the finish date of the successor task. 10

Adjusting Task Relationships 11 Assuming that two tasks have a finish-to-start relationship: Lead time causes the successor task to begin before its predecessor task concludes. Lag time causes the successor task to begin some time after its predecessor task concludes. In this exercise, you enter lead time and change task relationships between predecessor and successor tasks. On the Project menu, click Task Drivers.Project Select the name of task 9, Reserve camera equipment.

Adjusting Task Relationships 12 On the Standard Toolbar, click the Task Information button. Click the Predecessors tab. In the Lag field for predecessor task 8, type 50%. Entering lag time as a negative value produces lead time. Click OK to close the Task Information dialog box. To observe the effect of adjusting lag on the Gantt bars, on the Standard toolbar, click the Scroll To Task button. Task 9 is now scheduled to start at 50% of the duration of task 8.

Adjusting Task Relationships 13 Next, you will change the task relationship between two tasks Double-click the name of task 10, Reserve sound equipment. The Task Information dialog box appears. On the Predecessors tab, click in the Type column for predecessor task 9. Select Start-to-Start (SS), and click OK. Project changes the task relationship between tasks 9 and 10 to start-to-start.

END of Tutorial 6 14