Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods.

Slides:



Advertisements
Similar presentations
AP STUDY SESSION 2.
Advertisements

1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Spring 2008, King Saud University Arrow Diagramming Dr. Khalid Al-Gahtani 1 Network Schedule Predominant Network Scheduling Techniques: –Critical Path.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 10 Project Scheduling: PERT/CPM
CP Chapter 4 Schedule Planning.
Chapter 6: Developing a Project Plan
Project Management 6e..
Project Management from Simple to Complex
Chapter 6 Time Planning & Networks
Developing the Project Plan
Start D finish A B C E I G H F J KL N M ActivityDescription AExcavate BFoundation CRough wall DRoof EExterior plumbing FInterior.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Finding the Critical Path
Developing a Project Plan
SE503 Advanced Project Management
Project Scheduling: Lagging, Crashing, and Activity Networks
Chapter 9 Project Scheduling: PERT/CPM
CPM Network Computation
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Name Convolutional codes Tomashevich Victor. Name- 2 - Introduction Convolutional codes map information to code bits sequentially by convolving a sequence.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
The Topics that will be addressed in this Module include:
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
Introduction to Management Science
Presentation transcript:

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods and Techniques in Planning and Programming of Construction Projects by Dr. Alaattin Kanoğlu SPRING

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 2 The meaning and importance of project planning and programming function in construction management Decision levels in project planning and programming Project Planning and Programming Process in Operational Level The Techniques being used for Project Planning and Programming – Barcharts – Line of balance diagrams – Network Diagrams CONTENT

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 3 Definition of Project Planning and Project Programming Concepts Project Planning; means breaking down the project into the activities that must be fulfilled to realize the project; defining the type of relationships (predecessors and successor activities) between these activities; visualizing the activities and logical relations. Project Programming; means calculating early and late start-finish dates for the activities and for the project by assigning the duration of activities.

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 4 Decision Levels in Project Planning and Programming strategic level tactical level operational level

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 5 Aims of Project Planning and Programming to be able to foresee the problems that may occur at the beginning or consecutive stages of project and study on probable solutions in advance. to warn the management staff about the potential problems and related activities instead of the others. to provide the information related to cash flow that is vital for the finance of project. to provide the information related to effective use of the resources by minimizing the idle time of equipment and labors.

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 6 to provide the information related to resources required by activities. to provide the information for revising the schedule by considering the progress, delay and revised targets; to help the schedule that tends to derive from target to be revised. Aims of Project Planning and Programming

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 7 Project Planning and Programming Techniques Bar Charts-Gantt Charts Line of Balance Diagrams Network Diagrams Arrow Diagrams Precedence Diagrams

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 8 BARCHARTS JAN FEB MAR APR MAY JUN JUL AUG SEP ACTIVITY A ACTIVITY B ACTIVITY C ACTIVITY D ACTIVITY E ACTIVITY F ACTIVITY G ACTIVITY H ACTIVITY I ACTIVITY J

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 9 LINE OF BALANCE DIAGRAMS unit duration team-2 team-1 team-2 team-1

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 10 LINE OF BALANCE DIAGRAMS unit project completion time 15 months plumbingfinishings infrastruct. carpentryfound.excavationelectrical plaster duration

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 11 LINE OF BALANCE DIAGRAMS duration unit project completion time 15 months plumbingfinishingsinfrastruct. carpentryfoundat. excavation electricalplaster

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 12 PRECEDENCE DIAGRAMS EXCAVATION NOTATION early start date of activity late start date of activity lag time logical relationship to successor activity activity IDduration of activity type of relationship

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 13 PRECEDENCE DIAGRAMS TYPES OF ACTIVITY RELATIONSHIPS 1. C (Conventional) Type: Finish-to-Start relationship (Lag time = 0) EXCAVATION 10 FOUND.FRMWK 15 FOUNDAT. FORMWORK EXCAVATION F START= E START + E DUR + LAGTIME F START= = 10

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 14 PRECEDENCE DIAGRAMS TYPES OF ACTIVITY RELATIONSHIPS 1. C (Conventional) Type: Finish-to-Start relationship (Lag time> 0) POURING CONC 2RELEASING FRMW 2 POUR. CONCRT F START= C START + C DURATION + LAG TIME F START = = 29 RELS. FRMW

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 15 TYPES OF ACTIVITY RELATIONSHIPS 2. S Type: Start-to-Start relationship PRECEDENCE DIAGRAMS BRICKWRK 15PLASTER 30 BRICKWORK PLASTER P START = B START + LAGTIME P START= 30+6 = 36

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 16 PRECEDENCE DIAGRAMS TYPES OF ACTIVITY RELATIONSHIPS 3. F Type: Finish-to-Finish relationship PLASTER 30 WALLPAPER 15 PLASTER WALLPAPER W START = P START + P DURATION + LAGTIME - W DURATION W START = =54

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 17 TYPES OF ACTIVITY RELATIONSHIPS Rule 1. If finish-to-start type relationship is an obligation between two activities, i.e. these two activities can not be overlapped, a Conventional (finish-to-start) type relationship must be assigned between them. The lag time is determined due to characteristics of each activities. duration unit

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 18 TYPES OF ACTIVITY RELATIONSHIPS Rule 2. If finish-to-start type relationship is not obligatory between two activities, i.e., they both can be overlapped, and the duration of successor activity is longer than that of predecessor activity, then start-to-start type relationship can be assigned between these two activities. Lag time is determined as the duration of realizing the production of (1,2,3...n) units of predecessor activity or determined due to the characteristics of activities. 9 days plaster brickwork 6 days duration unit

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 19 TYPES OF ACTIVITY RELATIONSHIPS Rule 3. If finish-to-start type relationship is not obligatory between two activities, i.e., they both can be overlapped, and the duration of predecessor activity is longer than that of successor activity, then start-to-start type relationship can be assigned between these two activities. Lag time is determined as the duration of realizing the production of (1,2,3...n) units of successor activity or determined due to the characteristics of activities. wallpaper plaster duration unit 9 days 6 days

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 20 TYPES OF ACTIVITY RELATIONSHIPS Rule 4. Finish-to-finish type relationships cause the delay of start date of next activity (see electrical appliances) that has a start-to-start type relationship with the successor. Thus, the team that fulfills the successor activity naturally will be idle for some time. The solution is balancing the speed of this activity (see wallpaper) by reducing the number of laborers in the team. idle plaster wallpaper appliances duration unit appliances

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 21 PRECEDENCE DIAGRAMS THE ALGORITHM OF CRITICAL PATH METHOD - CPM 1. STEP: Forward pass: Calculation of Early Start Dates of activities.

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 22 PRECEDENCE DIAGRAMS THE ALGORITHM OF CRITICAL PATH METHOD - CPM 1. Rule: If an activity is the successor of more than one chain of activities then, early start date of the activity equals to the duration of the longest path. Thats why the greatest value that corresponds to the total duration of the longest path prior to that activity is chosen. Explanation: Activity C and activity D must be completed to be able to start activity E. At the end of day 25 activity D is completed but C is not. Activity E can only start at the end of day 35. C (20 days) D (10 days) E (5 days)

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 23 PRECEDENCE DIAGRAMS THE ALGORITHM OF CRITICAL PATH METHOD - CPM 2. STEP: Backward pass: Calculation of Late Start Dates of activities.

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 24 PRECEDENCE DIAGRAMS THE ALGORITHM OF CRITICAL PATH METHOD - CPM 2. Rule: The total value of the late start date of an activity and durations of chains of successor activities can not be greater than the early start date of the last activity in network. Thats why minimum value is chosen in backward-pass. Explanation: Assume that late start date of activity B is the greater value (20). Then, the earliest date that activity E can start is 45th day and the completion time of the project is 50th day. If the minimum value (10) is chosen, then the project will finish in 40 days. TRUE FALSE B (5 days) C (20 days) D (10 days)E (5 days)

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 25 PRECEDENCE DIAGRAMS BASIC CONCEPTS OF CRITICAL PATH METHOD - CPM CRITICAL ACTIVITY: The activity, that cause a delay in schedule and increases the completion time of project; that has zero total float; that has an early start date which is equal to the late start date. CRITICAL PATH: The longest path in network formed by the critical activities. The chain of activities that has zero total float. The chain that determines the completion time of project. FLOAT: The limit of delay that is allowed for a certain activity. The maximum delay for an activity that does not affect the project completion time.

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 26 PRECEDENCE DIAGRAMS FLOAT 10 days B (5 days) C (20 days) D (10 days)E (5 days)

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 27 PRECEDENCE DIAGRAMS A BD F CE S1 C1 F2 C0 S EXERCISE

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 28 PRECEDENCE DIAGRAMS A BD F CE S1 C1 F2 C0 S EXERCISE STEP 1: Forward Pass for Early Start Dates

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 29 PRECEDENCE DIAGRAMS A BD F CE S1 C1 F2 C0 S EXERCISE STEP 2: Backward Pass for Late Start Dates

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 30 PRECEDENCE DIAGRAMS A BD F CE S1 C1 F2 C0 S EXERCISE STEP 3: Defining the critical path and floats

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 31 RESOURCE LEVELING

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 32 RESOURCE LEVELING Resource requirement graph (cumulative) Laborer mhr S curve Resource requirement profile (non-cumulative) duration

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 33 COST PLANNING Earned Value Histogram (non-cumulative) Barchart Cost Duration ACTIVITIES

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 34 COST PLANNING Earned Value Histogram (cumulative) Earned Value Histogram (non-cumulative) Cost Duration Cost S curve

Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. 35 COST-TIME TRADEOFF indirect costs direct costs total cost cost duration normal timeoptimum timecrash time