© Bishops Stortford Town Council Moat Task & Finish Group 12 th April 2011 Options Summary Health warning – This pack is all the personal work of the Chief.

Slides:



Advertisements
Similar presentations
Head cuts and Knickpoints Identify, Prevent & Stop Georganne Bowman September 30, 2011.
Advertisements

Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
A presentation by David Penny, Commercial & Technical Director.
© Bishops Stortford Town Council Sworders Field Masterplan – Brief History.
Flood Profile Modeling with Split Flows and Weirs
6.3 Sediment management options
7. PV System Sizing Herb Wade Consultant
Clean energy by the community, for the community February 2012.
Project update November Questions..... Who is Ham Hydro and where do they come from? What are exactly their objectives and what do they do? What.
© Bishop’s Stortford Town Council Current Major Projects – Brief Update Cemetery extension Cemetery extension Land transfer with EHDC now complete, works.
Current Major Projects – Brief Update Jubilee Tree Jubilee Tree Planted, plaque being purchased, opening ceremony 25th Jun Planted, plaque being purchased,
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
 1 Stormwater Management and Road Tunnel A “SMART” Solution Transportation Research Board Committee ADC60 Sustainable and Resilient Infrastructure Workshop.
Notice of Motion: Investigation of Alternative Dam Proposal.
Commission on Sustainable Development in the South East Managing Floods and Droughts: Water in the South East 30 th November 2004 University of Westminster.
Surface Water Chapter 9.
Huntly Flood Alleviation Scheme
Design of Hydraulic Controls & Structures
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Design of Open Channels and Culverts
COMMUNITY PRESENTATION
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Prelim 1 Review.
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
Wind and Other Renewable Energy Sources Physics 1303.
March 2010 Developing Community Hydro Schemes in Oxfordshire Alison Wilshaw Renewables Advisor TV Energy.
© Bishop’s Stortford Town Council Appendix 2: Markets Initial Briefing.
WATER & WASTEWATER ENGINEERING Water Supply Engineering Lecture No. 3 Surface Water Collection Works.
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
1D Steady State Hydraulic Modelling Bratton Stream Case Study.
Sediment Transport in Wadi Systems Part 1: Overview
Flooding John Backley,OCC and The Environment Agency.
Thames Valley/Matatoki Water Supplies October 2012.
SPILLWAY RATINGS and STABILITY DESIGN PROCEDURES __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Power Plant Construction and QA/QC Section General Features of Hydro Electric Project Engineering Technology Division.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
every five years water and sewerage companies submit their investment plans to the industry regulator Ofwat this is known as the ‘Price Review’ the next.
Crisis in Shrewsbury Flooding impacts and risk management.
Modernisation Implementation Lessons An Operational Viewpoint Geoffrey Enever Head of Customer Service Goulburn Murray Water DM#
Planning and other statutory consents Alison Lax Project Manager – Low Carbon Communities.
GUTTERS and INLETS Gutter : A gutter is a triangle open channel along the curb stone of streets which carry the storm water along streets to inlets. Inlets.
© Bishop’s Stortford Town Council: Strictly Confidential BSTC Management Structure - Discussion Why this presentation? Why this presentation? Request from.
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
Section 13.1 Streams and Rivers
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
The Impacts of Hydro-Electric Power Lana Johnston Lakehead University Orillia Campus September 30, 2011
© Bishop’s Stortford Town Council Appendix 3: Markets Initial Briefing.
© Bishop’s Stortford Town Council Grants Policy CCTV Appendices 4 and 5.
6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
© Bishop’s Stortford Town Council Paddling pool Project Update & miscellaneous design matters.
Project Update - Anna Francis. FRECo’s AGM 2016 Overview and update on projects – Anna Francis Financial update including interest and EIS – Peter Andrews.
East Hampshire District Council Energy Alton
Bridges Reach analysis Fundamental tool for design
EXAMPLE Water flows uniformly in a 2m wide rectangular channel at a depth of 45cm. The channel slope is and n= Find the flow rate in cumecs.
Micro-hydro Understand the fundamental principles and
Energy Efficiency Obligation Scheme : Funding Energy Efficiency
Meeting Standards and Expectations in the Water Industry
Spoonful farms side channel preliminary design
GUTTERS and INLETS (m3/s(
River Conwy - flood management
NS4960 Spring Term, 2018 China: Expanded Renewables
Flood Management Objective: Compare hard and soft engineering approaches to flood management Outcomes: Identify the difference between hard and soft engineering.
The shapes of stream channels
Population: 550,000 Current Energy Source: Nuclear Power
The alternatives.
TASK 2 Poland.
Presentation transcript:

© Bishops Stortford Town Council Moat Task & Finish Group 12 th April 2011 Options Summary Health warning – This pack is all the personal work of the Chief Executive who is not: a water engineer a water engineer a pump technologist a pump technologist a specialist in renewable energy a specialist in renewable energy Just a humble physicist!

© Bishops Stortford Town Council Current Status To proceed we need Environment agency permissions Environment agency permissions Impoundment licence (we have this) Impoundment licence (we have this) Flood defence licence Flood defence licence Landowner permissions Landowner permissions A technical solution A technical solution Funding Funding EA have indicated EA have indicated that they will not renew the flood defence licence if it requires the construction of a weir in the river that they will not renew the flood defence licence if it requires the construction of a weir in the river That they would be amenable to a sustainable pumped solution That they would be amenable to a sustainable pumped solution Next step Next step Challenge the EA – fruitless? Challenge the EA – fruitless? Explore: is an un-pumped solution feasible without creating a weir in the river – probably not (with the existing inlet/outlet configuration) Explore: is an un-pumped solution feasible without creating a weir in the river – probably not (with the existing inlet/outlet configuration) Investigate a viable pumped solution Investigate a viable pumped solution

© Bishops Stortford Town Council Unpumped solution without weir? Depends on levels Depends on levels Outtake from Stort Inlet from Stort submerged Weir (covers electric cable?) Outlet to Stort If bed is approximately level – unpumped solution currently not feasible without a weir in river

© Bishops Stortford Town Council (Sustainable) Pumped solution the energy equation? FlowVolume Pump and power Energy consumption Annual electricity cost Solar option Full width, rapid flow 25-50l/s4000W96kWh/day (1kWh = 1 unit of electricity) £3600 Solar not viable 1change/day; 50cm depth* 2.8l/s 158W 240W (240v) (12V) 5kWh/day£170 Large Solar 3m*3m 1change/day; 20cm depth* 1l/s 35W 36W (240V) (12V) 1kWh/day£36 Medium Solar: 1mx1m *Assumes no leakage! The numbers for wind power are fairly similar, but less reliable, particularly in summer

© Bishops Stortford Town Council Where to put the pump and weir? A pumped solution requires two weirs in the moat, and a pump at the upstream weir. A pumped solution requires two weirs in the moat, and a pump at the upstream weir. The downstream weir will be at P7 in all cases; Options for upstream weir are: The downstream weir will be at P7 in all cases; Options for upstream weir are: P6 (inlet): On EHDC Land; possible high(er) water loss than other options, power feed from? P6 (inlet): On EHDC Land; possible high(er) water loss than other options, power feed from? Between P4 and P3: BSTC Land; existing channel would provide feed stream, may need to be cleared. Sump to be dug; power feed from? Between P4 and P3: BSTC Land; existing channel would provide feed stream, may need to be cleared. Sump to be dug; power feed from? P2 (existing weir): BSTC Land; existing channel would be extended to provide feed stream; sump to be dug; power feed from pump house? P2 (existing weir): BSTC Land; existing channel would be extended to provide feed stream; sump to be dug; power feed from pump house?

© Bishops Stortford Town Council Unpumped solution without weir – part 2 We know for certain We know for certain The river does flow from P10 to P7 The river does flow from P10 to P7 The water does enter the moat at p6 with the river at current levels The water does enter the moat at p6 with the river at current levels Therefore: Therefore: The right gradient on the moat must create a flow in the moat The right gradient on the moat must create a flow in the moat So… our problem is the outlet not the inlet. The outlet is too high! So… our problem is the outlet not the inlet. The outlet is too high! Unpumped option Unpumped option Excavate the moat (we believe there is 50cm+ of silt) Excavate the moat (we believe there is 50cm+ of silt) build another outlet (needs only to be drainpipe-sized) build another outlet (needs only to be drainpipe-sized) possibly we could mole rather than trench possibly we could mole rather than trench Job done – but its quite a big job! Job done – but its quite a big job!

© Bishops Stortford Town Council Next Steps Have I covered all options? Have I covered all options? Consult EA about non-sustainable pumped solution Consult EA about non-sustainable pumped solution Do they have a say, this is no more extensive than a garden water feature! Do they have a say, this is no more extensive than a garden water feature! In principle view from (new) Council on capex and opex In principle view from (new) Council on capex and opex Possible experimental pumping to establish rate of loss etc Possible experimental pumping to establish rate of loss etc will also establish levels will also establish levels Experimental digging to establish depth of moat Experimental digging to establish depth of moat Excavate vs pump: excavate considerations Excavate vs pump: excavate considerations Difficulty of creating outlet Difficulty of creating outlet Difficulty of excavation Difficulty of excavation Is the moat deep enough? Is the moat deep enough? Excavate vs pump: pump considerations Excavate vs pump: pump considerations Difficulty of running electrical feed Difficulty of running electrical feed Weir construction Weir construction Establish Establish Excavate vs pump Excavate vs pump Estimated cost Estimated cost Landowner consent from EHDC Landowner consent from EHDC Or just do it – probably not for excavate solution Or just do it – probably not for excavate solution The good news The good news There is £2000 in the budget for a feasibility study and we have a 4 (=high capacity) pump. There is £2000 in the budget for a feasibility study and we have a 4 (=high capacity) pump.