Projmgmt-1/12 Depaul University Scheduling Tasks In MicroSoft Project Instructor: David A. Lash.

Slides:



Advertisements
Similar presentations
Linking Project tasks Create lag time and lead time Life can be complicated. What if your plan needs to include complex task relationships? In Project,
Advertisements

1 After completing this lesson, you will be able to: Check spelling in a document. Check for grammatical errors. Find specific text. Replace specific text.
Precedence Diagramming
USING MS PROJECT Project management software programs such as Microsoft Project can be used to compute the earliest and latest start and finish times and.
CIS 480 Systems Analysis and Design
Management Information Systems [MOIS470]
Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
Microsoft Project Notes Amir. Tasks Types Fixed Unit tasks – Unit refers to assignment Units as percentages. A resource can be assigned to a task 100%
TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
Tutorial 3: Communicating Project Information
1 After completing this lesson, you will be able to: Create a new presentation using a design template. Enter text in the Slide pane. Create a new slide.
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
Microsoft Project.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Microsoft Project 2010 Dr. Nouh Alhindawi Jadara University.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
TUTORIAL 3 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 14/10/2012 Introduction to MS Project 2007.
Project Information: Customizing and Printing Lesson 7.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
ELC 347 DAY 2. Agenda Questions Working with MS Project 2003 Making a PB & J Sandwich.
Projmgmt-1/15 Depaul University Intro To MicroSoft Project Instructor: David A. Lash.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Projmgmt-1/15 Depaul University Adding Resources In MicroSoft Project Instructor: David A. Lash.
Microsoft Project Presentation By Corey Johnson 10/11/00.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Excel And Microsoft Project Technology Plug-In T12.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Fine-Tuning Tasks Lesson 11. Skills Matrix SkillsMatrix Skill Manage task constraints and dependencies Explore the effects of constraints and dependencies.
Managing Multiple Projects Lesson 9. Skills Matrix SkillsMatrix Skill Manage consolidated projectsCreate a consolidated project plan Create dependencies.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Network Scheduling : Precedence Diagram Method
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Microsoft Project – Tutorial 2 Project Goal network company computers to easily share resources within a time frame of three months and within a budget.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
Evaluation#3 MS Project Objectived u In this lab you will learn: – how to add the resources into tasks. –How to review resource assignment information.
Tutorial 2: Creating a Project Schedule
Project Management Applications Software Skills.
© 2002 ComputerPREP, Inc. All rights reserved. Project 2000: Module I.
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
Using Microsoft Project Gavrilă Cristian. Using Microsoft Project 1. Introduction 2. Tasks 3. Resources and costs 4. Fine tunning 5. Publishing projects.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
Microsoft Project 2003 Level 1 Deanna Reynolds Instructor.
A tutorial on MS Project James Burns. 22 Learning Objectives  Entering Tasks in the Gantt View  Task subordination  Linking of Tasks  Setting start.
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Concepts of Working with Tasks.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Microsoft Project – Tutorial 3 Creating a Report open LAN-3 from the tutorials folder save the file as LAN-3-your initials click Reports > Reports double-click.
1 Microsoft Project 2010 Demo Part 2. 2 Problem 2.8: Enter Tasks Enter tasks and times for problem 2.8. Be sure to click Project/Project Information to.
BET2413 Project Scheduling Lecture 6: Relationships in Project Network.
Microsoft Project 101: How to Build a Project Plan
Software project mgt. session # 3– lab manual.
A tutorial on MS Project
CHAPTER 6 PROJECT TIME MANAGEMENT
Microsoft Project 2007 Demo Part 3
MS Project 2016 Level II
In this tutorial you will:
ENGINEERING MANAGEMENT (GE 404)
Guide to Project.
ELC 347 project management
Microsoft Project 2007 Demo Part 1
ENGINEERING MANAGEMENT (GE 404)
Entering the Task List Dr. George.
Microsoft Project 2007 Demo Part 2
CHAPTER 6 PROJECT TIME MANAGEMENT
When you link tasks: Project automatically applies a Finish-to-Start task dependency The start of the second task depends on the completion of the first.
Microsoft Project 2013 Demo Part 2
Presentation transcript:

Projmgmt-1/12 Depaul University Scheduling Tasks In MicroSoft Project Instructor: David A. Lash

Projmgmt-2/12 Scheduling Tasks u.By linking tasks, you can quickly see how changes in the start, finish, and duration of a task affect other tasks to which that task is related. – For example, one task may not begin until another is finished, or two or more tasks may start at the same time. u To create a workable schedule, you should know how to: – Link tasks to assign relationships. – Overlap or delay related tasks. – Start or finish tasks on a specific date.

Projmgmt-3/12 Scheduling Tasks u To create a workable schedule, you should know how to: – Link tasks to assign relationships. – Overlap or delay related tasks. – Start or finish tasks on a specific date.

Projmgmt-4/12 Scheduling Tasks u In a project schedule, tasks can be related to each other in a variety of ways. – A task that must start or finish before another task can begin is called a predecessor task. – A task that depends on the start or finish of a preceding task is called a successor task. – Project has 4 different types of task relationships you can use to connect a series of tasks in a schedule. (next slide) u Using these relationships, you can realistically model the tasks in your schedule to show how things really happen in your project.

Projmgmt-5/12 Task relationship (FS, SS, FF, SF) u The nature of the dependencies between linked tasks. You link tasks by defining a relationship between their finish and start dates. u For example, the "Contact caterers" task must finish before the start of the "Determine menus" task. There are four kinds of task relationships in Microsoft Project: – Finish-to-start (FS)The task (B) cannot start until another task (A) finishes. – Start-to-start (SS)The task (B) cannot start until another task (A) starts. – Finish-to-finish (FF)The task (B) cannot finish until another task (A) finishes. – Start-to-finish (SF)The task (B) cannot finish until another task (A) starts.

Projmgmt-6/12 About Linking Tasks to Assign Task Relationships In a project schedule, tasks can be related to each other in a variety of ways. A task that must start or finish before another task can begin is called a predecessor task. A task that depends on the start or finish of a preceding task is called a successor task. Microsoft Project provides four different types of task relationships you can use to connect a series of tasks in a schedule. Using these relationships, you can realistically model the tasks in your schedule to show how things really happen in your project. See Also Help Scheduling Tasks Cue Cards Creating and Removing a Task Relationship Changing a Task Relationship Creating and Removing a Task Relationship 1.From the View menu, choose Gantt Chart. 2.In the Gantt table, select two or more tasks you want to link. 3.Click the Link Tasks button on the Standard toolbar. Or choose Link Tasks from the Edit menu.

Projmgmt-7/12 Scheduling Tasks u To create a workable schedule, you should know how to: – Link tasks to assign relationships. – Overlap or delay related tasks. – Start or finish tasks on a specific date.

Projmgmt-8/12 About Overlapping or Delaying Tasks u Sometimes, task relationships may not represent accurately the way work will happen in your project. – For example, you may want to start one task after its predecessor task starts, but before the predecessor task is finished. – Or, you may want to delay the start of a successor task beyond the finish of its predecessor task. u You can create these types of relationships between tasks by using lead time and lag time.

Projmgmt-9/12 Overlapping or Delaying Tasks u Lead time -> you can schedule an overlap between two tasks, so that one task begins before its predecessor task finishes. u lag time -> you can delay the start of a successor task. u Express lead or lag time as units of time or as a percentage of the predecessor task duration. – For example, if the paint on the walls must dry for one day before you can begin painting the mural, you can specify a one-day lag between the finish of the "Paint walls" task and the start of the "Paint clock timeline mural" task. u After you enter tasks and assign relationships to them, analyze your schedule and look for instances where you can apply lead or lag time. By using lead or lag time, you can make your schedule more accurate and you may be able to shorten its length.

Projmgmt-10/12 Setting Lead Or Lag Time u 1. On the View menu, click Gantt Chart. u 2 In the Task Name field, select the task you want to set lead or lag time for, and then click Task Information (right click the task) u 3.Click the Predecessors tab. u 4In the Lag field, type the lead time or lag time you want as a duration or as a percentage of the predecessor task duration. predecessor u 5. Type lead time as a negative number (for example, –2 for two days lead time) or as a percentage, and type lag time as a positive number or as a percentage.

Projmgmt-11/12 Scheduling Tasks u To create a workable schedule, you should know how to: – Link tasks to assign relationships. – Overlap or delay related tasks. – Start or finish tasks on a specific date.

Projmgmt-12/12 Scheduling a Task to Start or Finish Relative to a Specific Date 1.From the View menu, choose Gantt Chart. 2.Select the task you want, and then click the Information button on the Standard toolbar. – Or select the task and choose Task Information from the Insert menu. 3.Select the Advanced tab. 4.Under Constraint Task, select a constraint type from the list. 5.If you selected a constraint other than As Late As Possible or As Soon As Possible, type a constraint date in the Date box. 6.Choose the OK button. Microsoft Project recalculates the schedule.