Yes, We Believe So, But New Capacity Will Be Needed (And Several Projects Are in the Pipeline) Massachusetts Electric Restructuring Roundtable February.

Slides:



Advertisements
Similar presentations
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Advertisements

APPA CEO Roundtable Phoenix, AZ March 15, 2011
Assessment of Peaking Gas Service for New Englands Quick Start Generators Planning Advisory Committee March 3, 2005 Herbert Rakebrand III Herbert Rakebrand.
Energy in Todays Economy: Challenges and Opportunities Dr. Kenneth L. Lay Chairman, Enron Corp. Economy Roundtable Austin, Texas January 3, 2001 For further.
Energy Risk Management Seminar New York April 5, 2001.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
Electricity Industry The Potential Effect of Locational Marginal Pricing on Renewable Resources for Environmental Issues in Energy NECPUC Annual Symposium.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Pat Wood III, Chairman Federal Energy Regulatory Commission New Englands Platform for Infrastructure Development Boston September 13, 2004.
Rich Paglia Vice President
DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
First Solar FuelSmart™: Powering Energy Security
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
Climate Change: Climate Change: A Northwest Perspective Peggy Duxbury Seattle City Light February 20, 2008.
Federal Energy Regulatory Commission Winter Energy Market Assessment 2005 – 2006 Item No.: A-3 October 20, 2005.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Power Generation In Singapore Presented By CHAN Y K Commercial Specialist Commercial Service, Singapore.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
© 2008 ICF International. All rights reserved. NYSERDA Much Colder Than Normal Weather Combination Case Results December 2009 Contacts: Kevin R. Petak.
Energy and Telecommunications Interim Committee January 29, 2004.
February 22, 2001 Alaskan Pipeline Meeting Agenda Introduction to Enron & El Paso Assessing the Alaskan Gas Impact Enron & El Paso Value Added.
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
RGGI Leakage Workshop Presentation June 15, 2006 Stephen J. Rourke Vice President, System Planning ISO New England.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
SHORT - TERM NATURAL GAS OUTLOOK National Association of State Energy Officials State Heating Oil and Propane Conference August 7, 2006 Barbara Mariner-Volpe,
© 2008 ICF International. All rights reserved. NYSERDA Case 1 Results June 24, 2009 Contacts: Kevin R. Petak ( ) Vice President, Gas Market.
© 2008 ICF International. All rights reserved. New York Gas Market Overview Based on NYSERDA Case 1 (n0908) March 2009 Contacts: Kevin R. Petak (
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
ENERGY MARKET PERSPECTIVE
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
1 Gas Expansion in New England Paul Zohorsky Vice President – Engineering, Sales & Marketing, LNG Northeast Utilities Gas Business Unit (Yankee Gas and.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Winter Past, Winter Future Role of LNG in New England Prepared for: New Hampshire Energy Summit Concord, NH October 5, Joe Dalton Director, Government.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
The Northeast Natural Gas Market in 2030 LNG EXPRESS CONFERENCE Boston, Massachusetts September 21, 2006 William Trapmann Natural Gas Analysis Team Leader.
U.S. Energy Information Administration Independent Statistics & Analysis Natural Gas Markets: Recent Changes and Key Drivers for LDC Gas Forum.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
1 Public Power Looking to Participate in New Coal Generation Public power communities are very concerned about affordable electricity and –Coal is the.
Market Response to Winter Dupont Group Energy Summit New England Power Generators Association Carol J. Holahan, Esq. October 5, 2015.
Liberty Utilities Nashua Regional Planning Commission June 12, 2015.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
U.S. Energy Information Administration Independent Statistics & Analysis Natural Gas Demand: New Domestic Uses and LNG Exports Natural Gas.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
U.S. Energy Information Administration Independent Statistics & Analysis Outlook for shale gas and tight oil development in the U.S. For Joint.
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Ahmed Kaloko, Ph.D. Director Bureau of Conservation, Economics & Energy Planning Harrisburg PA COMPARISON OF PJM-ISO WITH CALIFORNIA-ISO Pennsylvania.
Bruce B. Henning Vice President, Energy Regulatory and Market Analysis Natural Gas in New England: Gas-Electric Interdependency.
LNG: Reliable Gas Supply for the Northeast U.S.
Massachusetts Electric Restructuring Roundtable
Presentation to the MA Electric Restructuring Roundtable
Michael I. Henderson ISO New England Inc.
Draft 2013 Energy-Efficiency Forecast
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
New England Resource Adequacy
Mike Hachey Director, Power Marketing TransCanada Power Marketing Ltd
Regional Natural Gas Supply & Deliverability
About Dominion: One of America’s Leading Energy Companies
Is New England Over-Reliant On Natural Gas?
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Natural Gas and Electricity Interface Challenges in New England
Presentation transcript:

Yes, We Believe So, But New Capacity Will Be Needed (And Several Projects Are in the Pipeline) Massachusetts Electric Restructuring Roundtable February 16, 2001 Thomas M. Kiley, President The New England Gas Association Will There Be Enough Gas to Fully Support Electricity Generation in New England?

The Report uWith so much generation in the region choosing gas, addresses impact on gas and electricity systems uEnergy systems are increasingly linked –Study raises questions about infrastructure for multiple systems – electric, gas, oil – and how they inter-relate uAgree that additional pipeline capacity will be needed to meet future power generation demand uNeed for ongoing communication – as in this forum today and others

NEGAs Discussion Points Today u Studys assumptions on pipeline capacity do not include several proposed system enhancements – undervaluing likely pipeline capacity growth u Uncertain of studys assumptions about total electric system capacity u Dismayed by misimpressions conveyed about gas shortages

Daily pipeline capacity today is about 3.6 billion cubic feet per day (Bcf/d). In last 3 years, pipeline capacity has grown by 800,000 MMCf/d, or 29% Regions Pipeline Capacity Growth

New Pipeline Supply - PNGTS Completed February miles of 24 and 30 pipe, U.S. side Interconnects with TransCanada system $500 million investment Initially 178 MMcf/d; now 230 MMcf/d

New Pipeline Supply – Maritimes & Northeast Completed December miles of 24 and 30 pipe, U.S. side Supplies from Sable Offshore $1.2 billion investment, total pipeline 400 MMcf/d

New Supply Project – Atlantic LNG New $1 billion liquefaction plant, Trinidad & Tobago First deliveries to New England, May 1999 For calendar year 2000, as of 9/00, Distrigas had imported 60 Bcf from Trinidad, 11 Bcf from Algeria 240 MMcf/d Growing interest in LNG by many companies

Distribution System Growth Continued investments by LDCs in system expansion & maintenance New pipelines mean new service areas 2 new LDCs in Maine

u Distrigas of Mass. Everett marine terminal u 1999 imports: 96 Bcf, more than double 98 levels u 3.5 Bcf of storage u Interconnections to Algonquin & Tennessee systems u Recently increased systems daily vapor sendout to 450,000 MMBtu/d u LNG provides about 25% of regions peak day supply u New contracts with power plants Distrigas LNG Terminal

ME NH VT MA CT RI Vermont Gas System Portland Natural Gas Transmission System Maritimes & Northeast Pipeline Iroquois Gas Transmission System Tennessee Gas Pipeline / El Paso Algonquin Gas Transmission / Duke The Regional Transmission System Cabot LNG / Distrigas Miles of pipe: Transmission – 1,879 Distribution – 32,120

ME NH VT MA CT RI Androscoggin Energy, Jay, 157 MWs Maine Independence, Veazie, 520 MWs Bucksport Energy, 174 MWs Rumford Power, 265 MWs Berkshire Power, Agawam, 276 MWs Tiverton, 265 MWs Recent Gas Power Plants on N.E. Grid Bridgeport, 540 MWs Dighton, 178 MWs Over 2,300 MWs of new generation has been added

New Capacity Will Be Needed u Over 20,000 MWs of new units are proposed in the region, according to ISO listing u Report considers bandwidth of 7-11,000 MWs of new gas units in timeframe u To meet new load demand, report states that new gas pipeline capacity will be needed. NEGA concurs. u Report includes in its modeling analysis several proposed projects but not others. This assumption is key. NEGA believes these others projects are likely and will contribute both to meet supply needs and help alleviate system bottlenecks as identified in the report.

Proposed Enhancements, New England / New York Systems, Duke / Algonquin: HubLine Islander East (with KeySpan) Duke / Maritimes & Northeast: M&NE Phase III Expansion El Paso / Tennessee: Eastern Express New England Connecticut/Long Island Lateral Iroquois: Eastchester

Included / Not Included Included Tennessees Eastern Express 2000 (in 2001 model) Iroquois Eastchester (in 2003 model) Not Included Tennessees Eastern Express New England Dukes HubLine Maritimes & Northeasts Phase III Expansion See report pages vi-vii; Also does not include Distrigas sendout capability in pipeline capacity (see p. ix).

Projects are Moving through the Process Now u The inclusion of several of these projects, as they proceed, will mean new supplies and increased capacity. u These projects are proceeding on schedule, as planned, under regulatory review. u Planned to meet market demand and conditions. u Timely approval is key. u Agree with report: Any facility improvement that results in increased liquidity at Dracut would likewise improve electric system reliability across New England (p. xi).

Uncertainty About Electric System Capability/Assumptions u Would be interested in further information on electric assumptions - missing sense of total electric system capability in : gas units are presented somewhat in a vacuum. u The issue of constraint on peak, Winter 2003: –What is the total system capability? –What is the status of non-gas units? –What is the assumption for units on scheduled maintenance/ unplanned outages, etc.? –What is the dispatch model/ process? –How much attrition of existing capacity occurs and when? –What about transmission ties: HQ, NB, etc.? u Reference gas: 2005 summer peak, 25,213 MWs, 2005 winter peak, 22,252 MWs (p. 34); High case: 2005 summer peak, 26,986 MWs, 2005 winter peak, 23,961 MWs (p. 34) u NEPOOLs projected net generating capacity for this summer, 2001, is 27,100 MWs, with forecasted peak of 23,650

Misimpressions Conveyed on Shortages & Crisis u Reports cover letter states: Against the backdrop of skyrocketing commodity gas costs and the power crisis in California, New Englands growing dependence on natural gas for power generation is genuine cause for concern (Levitan, ) u News reports in wake of ISO press conference of Feb. 5 conveyed sense of looming crisis in the region – and pending choice between gas heat and power. u The Boston Globe, : Study sees gas heat, electric shortages…Some New England consumers could go temporarily without heat or electricity during the winter of 2003 because the pipeline system may not be able to keep homes and power plants supplied with natural gas on peak winter days, according to a study released yesterday by the operator of the regions power grid. u This is incorrect.

LDC Reliability is Confirmed Report itself makes clear several times that LDC supplies to firm customers are not at risk: u When constraints arise, LDCs will be served as well as the minority of merchant generators who have lined up firm long- haul entitlements in their own name. Under the pipelines rigid scheduling priority systems, LAI does not envision the increased demand for natural gas for merchant generation having an injurious effect on the reliability of service for New Englands LDCs. (p. ix) u New Englands LDCs have nothing to worry about during times of constraint…[Gas] utilities remain obligated to serve. Therefore, gas utilities in New England cannot afford to roll- the-dice on the release of firm capacity rights when residential and commercial customers would otherwise be at risk. (p. 14)

Natural Gas & Power Generation u Natural gas is the fuel of choice for new generation in New England and the U.S. »Lower heat rate »Higher efficiency »Operating and maintenance performance »Lower emissions

Primary Energy Consumption, New England vs. U.S. (%) Source: U.S. Energy Information Administration

Changing Electric Generation Fuel Mix: Source: ISO New England 1999: Gas is 16% of mix

Projected Gas Market Growth GTI projects 3.4% annual growth in New England over the next 15 years, led by electric generation Annual Growth Rate: Residential: 1.1% Commercial: 1.7% Industrial: 3.5% Electric: 7.4% Source: Gas Technology Institute (GTI)

Greater Communication u NEGA supports reports call for greater communication among energy systems u Last June NEGA held a workshop on gas power plants, looking at the issue of will there be enough gas? Participants included ISO NE, pipelines, Distrigas, LDCs, power generators, consultants, state government agencies u Consensus that supply will be there to meet need, assuming new pipeline capacity u Recommendation for greater communication on scheduling protocols, etc.

Summary uNatural gas industry has made substantial infrastructure investments in recent years in New England uStudys assumptions on pipeline capacity do not include several proposed system enhancements – undervaluing likely pipeline capacity growth uAgree that additional pipeline capacity will be needed to meet future power generation demand uMisimpression on shortages regrettable uNeed for ongoing communication