Barima Kwarteng & Associates Limited Company registered in July 2008 in Ghana We acquired 3 major concession in Ghana Concessions are not operational.

Slides:



Advertisements
Similar presentations
Holbrook Area Potash Project American West Potash Winter 2012.
Advertisements

Chapter 13 Learning Objectives
Welcome to Who Wants to be a Millionaire
1 Nia Sutton Becta Total Cost of Ownership of ICT in schools.
Analysis of Financial Statements
14-1 Chapter 14 Risk and Managerial (Real) Options in Capital Budgeting © Pearson Education Limited 2004 Fundamentals of Financial Management, 12/e Created.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
MANAGEMENT ACCOUNTING
EuroCondens SGB E.
Chapter 19 Financing and Valuation Principles of Corporate Finance
Cost Behavior, Operating Leverage, and Profitability Analysis
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
Copyright 2008 The McGraw-Hill Companies 20-1 Economic Costs Profits Compared Short-Run Production Relationships Law of Diminishing Returns Short-Run Production.
Welcome to Who Wants to be a Millionaire
Year 6 mental test 10 second questions
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
1 Copyright Copyright 2012.
The 5S numbers game..
Decision Making and Relevant Information
Unit 11 Insurance North Carolina Driver and Traffic Safety Education Association 1 INSURANCE UNIT 11.
INVENTORY AND OVERHEAD
2007 Arledan Investments Ltd. Company Profile
The basics for simulations
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Introduction to Cost Behavior and Cost-Volume Relationships
Review for 2nd Nine Weeks Exam
Copyright © Cengage Learning. All rights reserved.
Look at This PowerPoint for help on you times tables
Cost-Volume-Profit Relationships
MCQ Chapter 07.
Capacity Planning For Products and Services
Capacity and Constraint Management
Dominican Republic. Mining Property All mineral substances belong to Dominican State. Exploration rights are granted through concessions or contracts.
MDG CAMEX INVESTMENT Present Investment $3,000,000 Proposed Investment $5- 10,000,000 Camex MDG Overview Pre-RTO Copper, Gold and silver mining investment.
Filling and Wrapping Review Sheet
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
A Key to Economic Analysis
Surface Area of Irregular Shapes Volume of Irregular Shapes
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
LONG RUN A period of time over which the number of firms in an industry can change their production facilities. In the long run, firms can enter or leave.
Sprayer Economics Gary Schnitkey University of Illinois.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Sets Sets © 2005 Richard A. Medeiros next Patterns.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
New Hope Baptist Church Sunday, January 29, 2012.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Chapter 13 Equity Valuation 1.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Nodo Gastronómico en la Provincia de Elqui
Static Equilibrium; Elasticity and Fracture
Cost-Revenue Analysis for Decision Making
Quiz Number 2 Group 1 – North of Newark Thamer AbuDiak Reynald Benoit Jose Lopez Rosele Lynn Dave Neal Deyanira Pena Professor Kenneth D. Lawerence New.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Barima Kwarteng & Associates Limited Company registered in July 2008 in Ghana We acquired 3 major concession in Ghana Concessions are not operational Objectives Seek joint venture partners Seek investors for each mining concession Develop full scale mining operation

Officers & Shareholders NANA KWABENA KWARTENGCHAIRMAN / SHAREHOLDER NEVILLE ISAIAH REIDDIRECTOR / SHAREHOLDER TREVOR SOLOMON GUYDIRECTOR / SHAREHOLDER DAN FONTAINEDIRECTOR /SHAREHOLDER CLAUDIA JOAN GALEDIRECTOR / SHAREHOLDER BRIGHT AWA-AMANFODIRECTOR / SHAREHOLDER RUTH U. IWUJISECRETARY / SHAREHOLDER Equal share holders of Barima Kwarteng

HISTORICAL PERSPECTIVE Ghana is well endowed with substantial mineral resources. The mining industry plays a significant role in the country's economy. It is a foreign exchange earner, it is a major source of employment and contributes enormously to the internal economy. The country has had a long history of mining, particularly gold mining. The metal was mined and traded by Ghanaians long before the arrival of Europeans in Since then gold has continued to be the predominant mineral produced in the country. Ghana runs second to South Africa in gold production in Africa. Other minerals mined on large scale are diamonds, bauxite, manganese and salt.

BARIMA KWARTENG & ASSOCIATES LIMITED SUBSIDIARIES AND THE ROLE THEY PLAY IN THE PROJECTS The three main subsidiaries are: (1).Rocks & Rivers Mining Limited (2)Dpong Limited (3) Rokway Limited Since the Goldfield Concessions are situated in three separate Districts in Ghana far away from each other, these subsidiaries will play the following role: Domeabra / Aboaboso Goldfields operation would be controlled by Rocks & Rivers Mining Limited. Sekyere / Nsuta Goldfields will be controlled by Dpong Limited. Mfensi Goldfields will be controlled by Rokway Limited

Concessions 1 Rocks & Rivers Mining Limited Goldfields Concession covers an Area of square kilometers and lies on Asankragua Gold belt in the Amansie District of Ashanti Region of the Republic of Ghana. Oda River Exploration proved a total of 160,000,000 of Auriferous gravels with an average grade of 0.68 gm/m3 or.024 oz /m3, giving a total Reserves of 2,600,400 ounces.

Concessions 2 Dpong Construction Limited Goldfields Concession covers and Area of 140 square kilometers and lies on Ashanti Gold belt in Sekyere Nsuta in the Daboase District in the Western Region of the Republic of Ghana. Ofin River Exploration proved a total of 120,000,000m3 of Auriferous gravels with an average grade of 0.62 gm/m3 or.021 ounce m3 giving a total Reserves of 2,204,500 ounces.

Concession 3 Rokway Enterprises Limited Goldfields Concessions covers an Area of square kilometers and lies on Kumasi Basin and Asakragua gold belt in the Atwima Nwabiagya District in Ashanti Region of the Republic of Ghana Pra River Exploration proved a total of 100,000,000m3 of Auriferous gravels with an average grade of 0.52 gm/m3 or.017 m3, giving a total Reveres of 1,617,500 ounces.

The three separate Goldfields Concessions all have three types of mining as follows: To dredge the Rivers, Streams, Soil and Soil Sediments for Nugget gold, Alluvial gold and Diamonds as surface Mining. The dredging project cost is estimated at (US$10,000,000.00) Ten Million United States Dollars for each Goldfields Concession. To open cast of the shears, or the Hills or the Mountains for both oxide Gold ore and hard rock gold ore also as surface mining. The open cast project cost has been estimated at (US$50,000,000.00) Fifty Million United States Dollars for each Goldfields Concession. To retrench the old abandoned pits (shafts) as the result of 1939 to 1945 second World War. Also to open new pits to sink shafts for both oxides gold ore and hard rock gold ore as underground mining. The project cost has been estimated at (US$500,000,000.00) Five Hundred Million United States Dollars for each Goldfields Concession

Answers to questions posed by Project Financing

Who produced Feasibility Report? CME (GHANA) Ltd Canadian Mineral Exploration Consultants Working Worldwide 148 / 6 Labone Crescent PO.Box C723 Cantonments Accra, Ghana

WHAT IS THE ROLE OF BARIMA KWARTENG & ASSOCIATES LIMITED CONSULTING FIRM? Barima Kwarteng & Associates Ltd is responsible for sourcing of funds, acquisition of Mining Equipments, and all resources needed for the start and successful implementation of the three projects. All legal issues, Agreements, Registrations, Licensing, etc, etc. needed for smooth operation of the Mining and Implementation will be the major responsibility of Barima Kwarteng & Associates Ltd.

WHO WILL SUPPLY THE EQUIPMENTS? We expect our investors to supply us with the needed equipments for the project. It is estimate that (US$8,000,000) Eight Million United States Dollars is needed for the equipments and (US$2,000,000) Two Million United States Dollars working capital for each project.

USE OF LOAN PROCEEDS We intend to use the loan proceeds as follows: DEVELOPMENT COSTS PER SITE ITEMSAMOUNT ($)PROPORTION % 1Machinery, Equipment and tools8,000, % 2Contingencies590, % 3Reoperation and start-up870, % 4Working Capital540, % 5Legal and Brokerage fees300, % Total Application10,300, % Three Sites Total $ 30,900,000.00

THE LIST OF EQUIPMENT NO.EQUIPMENTSQUANTITY 1GOLD WASHING PLANT 3 2DREDGERS3 3 CRUSHERS 3 4EXCAVATORS6 5BULLDOZERS6 616 WHEELER WHEELER12 86 WHEELER12 9WHEELER LOADERS3 10GENERATORS3 11GRADERS3 12GOLD REFINERY3 13CROSS COUNTRY VEHICLES 4X46 14DOUBLE CABIN PICK UPS 4X412 15SINGLE CABIN PICK UPS 4X412 16SPARE PARTS 17INFRASTRUCTURES 18BACKHOLE (TRACTOR)3 19EXPLORATION DRILL3 20OVER BURDEN DRILL3 21WHEEL WATER WAGON OR WATER TANK ON WHEEL6 22WHEEL LOW LOADER BULLDOZER CARRIER6 23CAMP HOUSES

HOW LONG WILL IT TAKE FOR THE EQUIPMENTS TO REACH GHANA? One research from the Ghana shipping agency reveals that it will take a minimum of (45) forty -five days or a maximum of (90) ninety days.

HOW LONG CAN THE DREDGING FOR GOLD BE DONE? According to our Geologists and experts from Anglogold Ashanti and Rangold, the production can be done for up to (29) twenty-nine years WHAT ARE THE EXPECTED ANNUAL OUTPUT, REVENUE AND COST PER GOLDMINE?

FINANCIAL PROJECTONS The following is our projected annual financial expected from the three project sites PROJECT SITES ANNUAL OUT PUT (KG) ANNUAL REVE NUE ($) ANNUAL COST (MILLI ON) DOMEABRA13,12022,400, ,200, NSUTA14,80019,200, ,800, MFENSI8,20014,000, ,000, TOTAL$32,800$55,600, $8,000,000.00

WHAT IS THE SHARE SHARING RATIOS BETWEEN INVESTORS AND OWNERS OF CONCESSION? The answer depends on the type of mining project under consideration. For the dredging of the Rivers, Streams, Soil and Soil Sediments for Alluvial gold, Nugget gold and Diamonds as medium scale surface mining, the shares structure is INVESTORS 55%, CONCESSION OWNERS 45%. For Open Cast of the Shears or Mountains or Hills for Oxide gold ore and hard rock gold ore as medium scale surface mining – INVESTORS 60%, CONCESSION OWNERS 40%. For the Retrenchment of the old abandoned pits as a result of the second world war and also to open new pits for Oxide gold ore and hard rock gold ore as large seal underground mining, shares – INVESTOR 70%, CONCESSION OWNERS 30%. The Government of Ghana will hold 10% royalty share based on net profit in accordance with the minerals and mining Law 153.

Immediate Support Low Cost Entry Level Opportunity We have a gold washing plant currently at Tema port Ghana. The production capacity of the machine is 250 cubic yard per hour. Its efficiency is 85-90%. 5000g of gold will be produced per day Installation & production begin in 1 month Washing plant and accessories estimated at $300,000 approximately. 1 st option on recovered gold at discount