Presented to: By: Date: Federal Aviation Administration Approval Process Overview Cranes or Other Objects United Parcel Service Mike Manis, Support Specialist,

Slides:



Advertisements
Similar presentations
Emergency COA Process Presented to: UAS All Users TELCON
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Community Impact Grants September How to register as a new United Way service provider, and create an e-Cimpact account 2.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
ARRA Reporting School Level Expenditure Report February 12, 2010 (SLER)
My AmeriCorps Release 3 AmeriCorps National Programs User Roles and Management – Implementing Presentation developed for the Corporation for National and.
My AmeriCorps AmeriCorps and VISTA Programs Create and Manage an eGrants Account Presentation developed for the Corporation for National and Community.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 ATS Evaluation Programs The Federal Aviation Administration Presented By: Gary Romero.
1 Any views expressed related to procedural or explanatory material are those of the author and not necessarily those of the U.S. Census Bureau.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
August 6, To Understand: Budget Requirements Budget Template Budget Approval Process, Notifications and Timeframe To walk through the completion.
Michigan Electronic Grants System Plus
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
GENERAL OVERVIEW OF STEPS TO REQUEST ACCESS TO SPP INDICATOR THROUGH TEASE ( TEXAS EDUCATION AGENCY SECURE ENVIRONMENT) TEASE 1.
Welcome To SPARROW Website URL
1 FLL Construction Playbook RWY 10R / 28L April 17, May 6, 2013 Phase 1 Only ~ RWY 9R Closes.
Presenter:Dr. Maureen White Developer: Dr. Chuck Wiseley 12/9/10 1.
1 SLIDE Insurance Company Regulation Division Insurance Market Regulation Division Medical Professional Liability Insurance Claim Reports Online Claim.
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Using Family Connection Online Resource for Planning & Advising.
Welcome to Access Online for State of Iowa Cardholders.
ABC Technology Project
By: Tony Diana, Date: September 19, 2005 File: apo130\ASPMDocs\ASPM Presentation 05.ppt Federal Aviation Administration Presentation of the.
©2013 PROS, Inc. All rights reserved. Confidential and Proprietary. PROS Connect User Community Website and Support Portal Prepared by Christine Lambden.
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
FAA Airports GIS (AGIS)
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
Federal Aviation Administration Environmental Prescreening Training Module 3 Noise Review.
1 DELAYED LAST STATE AID - BORROWING PROCESS
Squares and Square Root WALK. Solve each problem REVIEW:
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
1 Module 5.2 Responding to an RFx Design. Build. Ship. Service. Linnea Montgomery February 5, 2009.
Week 1.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
- 1 - Defense Security Service Background: During the Fall of 2012 Defense Security Service will be integrating ISFD with the Identity Management (IdM)
How Cells Obtain Energy from Food
1 Office of New Teacher Induction Introducing NTIMS New Teacher Induction Mentoring System A Tool for Documenting School Based Mentoring Mentors’ Guide.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
Presented to: 2008 FAA Eastern Region Airports Conference By: Donna O’Neill FAA Obstruction Evaluation Specialist Date: March 19, 2008 Federal Aviation.
Crane Operator Forum Presented By: Miami-Dade Aviation Department Aviation Planning Division & Federal Aviation Administration August 16, 2006 Rev. May.
Federal Aviation Administration Obstructions 101 Protecting Your Approach Minimums Presented to: GAA Conference 2015 By: Cindy M. Hintz Date: October 14,
Presentation transcript:

Presented to: By: Date: Federal Aviation Administration Approval Process Overview Cranes or Other Objects United Parcel Service Mike Manis, Support Specialist, MIA ATCT February 11, 2009

Federal Aviation Administration 2 Crane Process Overview February 11, 2009 A Crane is Needed Code of Federal Regulations – Part 77 Any object that affects navigable airspace

Federal Aviation Administration 3 Crane Process Overview February 11, 2009 Different Governmental Agencies If on the Airport, Dade County Aviation Department will have separate, additional approval requirements and process. FAA has several divisions Responsibility on Crane Operator to obtain all needed approvals

Federal Aviation Administration 4 Crane Process Overview February 11, 2009 FAA System File notice via internet

Federal Aviation Administration 5 Crane Process Overview February 11, 2009 FAA OE/AAA Website

Federal Aviation Administration 6 Crane Process Overview February 11, 2009 FAA OE/AAA Website Instructions in middle of page

Federal Aviation Administration 7 Crane Process Overview February 11, 2009 FAA OE/AAA Website Step 1: Register as a user Either New User Registration link: Can file by postal mail, takes more time

Federal Aviation Administration 8 Crane Process Overview February 11, 2009 FAA OE/AAA Website – Registration

Federal Aviation Administration 9 Crane Process Overview February 11, 2009 FAA OE/AAA Website – Login Login with Username and Password Help: or

Federal Aviation Administration 10 Crane Process Overview February 11, 2009 FAA OE/AAA Website - Portal Step 2: Input Information Where to input information Off Airport or On Airport

Federal Aviation Administration 11 Crane Process Overview February 11, 2009 If on MIA Airport, also Contact DCAD Step 3: (If Required) If on MIA Airport, also contact Dade County Aviation Department. José Ramos, Chief of Aviation Planning

Federal Aviation Administration 12 Crane Process Overview February 11, 2009 After Input Into OE/AAA, What Next? Use FAA Aeronautical Study Number for reference In 2008 there were 128 on airport (NRA) cases in Miami-Dade County

Federal Aviation Administration 13 Crane Process Overview February 11, 2009 Case Data Example

Federal Aviation Administration 14 Crane Process Overview February 11, 2009 After Input Into OE/AAA, What Next? Different FAA Divisions and Military can respond AT-OES (Obstruction Evaluation Service) AF (Airway Facilities a.k.a. Technical Ops) FP (Flight Procedures) ADO (Airport District Office) FS (Flight Standards) FM (Frequency Management)

Federal Aviation Administration 15 Crane Process Overview February 11, 2009 FAA Divisions and Military continued USAF – Air Force USN – Navy USA – Army AT-OSG (Operations Service Group) ATCT (Air Traffic Control Tower) All may respond, but must respond by deadline to give input

Federal Aviation Administration 16 Crane Process Overview February 11, 2009 Division Response Example

Federal Aviation Administration 17 Crane Process Overview February 11, 2009 One Project Could Be Several Cases South Terminal Crane Project had three Aeronautical Study Numbers: View of Project Cases (FAA users View)

Federal Aviation Administration 18 Crane Process Overview February 11, 2009 Project Closest Points Made Cases

Federal Aviation Administration 19 Crane Process Overview February 11, 2009 ASN Data Available to FAA Users Case Data – Summary Information Part 77 – Impact to IFR Procedures POS – Penetration of Surfaces Report Design Surfaces Documents ( , maps, etc) Correspondence Archive (Determinations, Extensions, etc) Division Responses (Used in Determination)

Federal Aviation Administration 20 Crane Process Overview February 11, 2009 Objective – Determination Letter Either No Hazard, or No Hazard with Provisions Typical: Crane has Flags and Lights at Night Also: Could Require NOTAM(S) Issued for IFR Procedure Modification - Departure Procedures or Instrument Approach Procedures

Federal Aviation Administration 21 Crane Process Overview February 11, 2009 Case Data Example Part 77 Results

Federal Aviation Administration 22 Crane Process Overview February 11, 2009 Final Step Project Complete Advise FAA and/or MIA Airport

Federal Aviation Administration 23 Crane Process Overview February 11, 2009 AIRPORT Part 77 Surfaces

Federal Aviation Administration 24 Crane Process Overview February 11, 2009 Websites and Contact Information FAA Miami ATCT: Mike Manis Dade County Aviation Dept: José Ramos