SD5953 Successful Project Management FINAL PROJECT PLAN INSTRUCTIONS

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Advertisements

Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Having Fun with Gantt PERT &.
Teaching Project Management Mauricio Gonzalez (M.Sc) Frederick Douglass Academy, NYC Roy B. Melton, Purdue University 2010.
Introduction to Project Management ECE 480 Erik Goodman.
Lecture 6 - Project Planning. Lecture 6: Project Planning Overview Creating an outline plan –Work Breakdown Structure –Identifying tasks Waterfall and.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
ECE 480 Gantt Charts Revisited. Keys to Successful Gantt Charts USE the default, finish-to-start, constraints obtained by specifying predecessors, unless.
CS 4730 Level Design CS 4730 – Computer Game Design Credit: Several slides from Walker White (Cornell)
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Certificate IV in Project Management Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
Mark Kelly Vceit.com Gantt Having Fun with. 2 Well, “fun” might be optimistic At least they’re more fun than this…
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
PERT Gantt WBS.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
2.02 Utilize project-management skills to improve workflow and minimize costs.
A Brief intro to Project Management What can it do for you
CMGT 410 aid Education Begins/cmgt410aid.com
ECE362 Principles of Design
Project Management MGT 30725
Project Management Systems
Managing the Information Systems Project
Systems Analysis and Design in a Changing World, 4th Edition
AP CSP: Encode an Experience
Chapter 3: The Project Management Process Groups: A Case Study
CHAPTER 6 PROJECT TIME MANAGEMENT
CMGT 410 Education for Service-- snaptutorial.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
DEFINING THE PROJECT CHAPTER 4.
Building Disaster-Resilient Places
Teaching slides Chapter 3.
Part II Project Planning © 2012 John Wiley & Sons Inc.
SEM Operations PE - Utilize project-management skills to improve workflow and minimize costs PI – Develop project plan.
Introduction to Project Management ECE 480 Erik Goodman.
Welcome W 15 Introduction to Engineering Design II (IE 202)
Project management Learning Unit 5.
P ROJECT M ANAGEMENT Skills.
Building a Team for Your project
Teaching slides Chapter 13
SD5953 Successful Project Management Work Breakdown Structure
SD5953 Successful Project Management Predecessors and Successors
Setting up a project file
Identifying the Work to Be Done
SD5953 Successful Project Management STATUS TRACKING & REPORTING
SD5953 Successful Project Management THE CRITICAL PATH METHOD
Creating robust project networks
SD5953 Successful Project Management LAB D
Chapter 3: The Project Management Process Groups: A Case Study
7. EAFM cycle overview Essential EAFM Date • Place 1.
SD5953 Successful Project Management LAB 05
SD5953 Successful Project Management LAB 6B
SD5953 Successful Project Management LAB 6A
SD5953 Successful Project Management REVIEW 05
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Overview.
SD5953 Successful Project Management REVIEW 07
Presentation transcript:

SD5953 Successful Project Management FINAL PROJECT PLAN INSTRUCTIONS School of Design The Polytechnic University of Hong Kong

Please sit with the members of your final group project IMPORTANT Please sit with the members of your final group project

FINAL Project Plan - Instructions The requirements for the FINAL Project Plan were outlined in 1st CLASS ORIENTATION, which happened on the first day of class This presentation is an extract of that one, with all extra information removed, but nothing else changed except a desired length indication, because some reports had a lot of images in them, but little text/depth/analysis.

Original Slide

#4 – FINAL Project Plan Please submit your FINAL Project Plan at the end of term. It is the culmination of an entire semester of scrutiny. It is supposed to be a synthesis of the Framing Exercise further developed into a DRAFT Project Plan that was presented for feedback to your peers, Supervisors and outside parties. It should chart and measure your Summer Capstone Project.

#4 – FINAL Project Plan Your FINAL Project plan must be at least this long: ~4,000 words

#4 - Final Project Plan (Breakdown) Part 01: Scope Definition All projects begin with a project scope that incorporates clear measures of success (MOS).

#4 - Final Project Plan (Breakdown) Part 02: Project High Level & Sub Achievements To become actionable, the Measure of Success (MOS) must be broken down into blocks called high-level achievements (HLA) that are then divided into sub achievements (SA). This helps to uncover actionable work items and enables the Project Manager to see where additional detail or refinement is required. It is here where project risks are often first identified.

#4 - Final Project Plan (Breakdown) Part 03: Project Assumptions, Risk, and Charter All project goals and plans feature assumptions, which introduce risk. Risk management is a big part of Project Management. Major and minor risks need to be carefully considered when crafting the project plan. These, along with the Scope, HLAs & SAs, combine to form your formal project charter.

#4 - Final Project Plan (Breakdown) Part 04: Project Work Breakdown Structure The most granular level of a project is a listing of the actual tasks to be performed, broken down to the point where they cannot be further reduced. The listing of these tasks is called the project Work Breakdown Structure (WBS).

#4 - Final Project Plan (Breakdown) Part 05: Project Predecessors In Project Management it is important to determine what needs to occur before something else. The definition of predecessors achieves this by figuring out the order in which tasks need to happen.

#4 - Final Project Plan (Breakdown) Part 06: Project Duration Estimates and Resources Now you have a basic project structure. It needs a sense of time. Each of the defined tasks now needs to have duration attached. Estimating durations is both a skill and an art and an iterative learning process that requires practice.

#4 - Final Project Plan (Breakdown) Part 07: Critical Path Analysis The critical path is the shortest timeline possible for your project. It is composed of the chain of tasks that, if affected in terms of their duration, will lengthen the overall project. These are the tasks to be most carefully watched.

#4 - Final Project Plan (Breakdown) Part 08: Project Tracking and Status Reporting Things cannot be properly managed if they are not measured. Monitoring and progress reporting is a critical aspect of Project Management, especially within in a large corporate setting or when dealing with an even moderately complex project.

Final Project Plan Due Date The deadline for submission of the Final Project Plan is: MONDAY, April 29 2019 @ 23h00

QUESTIONS?

THANK YOU