LCLS Commissioning Parameters

Slides:



Advertisements
Similar presentations
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Advertisements

First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003.
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
C.Limborg-Deprey Beam Dynamics Justifying L01 November 3 rd 2004 Beam Dynamics Justifications of modification of.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Simulation studies of the e-beams for Renkai Li and Juhao Wu 5/20/2014 ALD Review.
I.V. Bazarov, Multivariate Optimization of High Brightness DC Gun Photoinjector, UCLA Workshop, 8-10 November CHESS / LEPP ERL DC Gun Injector.
Low Emittance RF Gun Developments for PAL-XFEL
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Twin bunches at FACET-II Zhen Zhang, Zhirong Huang, Ago Marinelli … FACET-II accelerator physics workshop Oct. 12, 2015.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
X-band Based FEL proposal
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
MAX IV linac overview and scope of automation Sara Thorin.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Sara Thorin, MAX IV Laboratory
Status and Interest of the X-ray FEL SINAP
Drive laser specifications:
Gu Qiang For the project team
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
Injector Performance Requirements Conventional Facilities Update
Injection facility for Novosibirsk Super Charm Tau Factory
BC2 Commissioning Parameters
MIT Compact X-ray Source
ERL Main-Linac Cryomodule
Needle Cathodes for RF Guns
LCLS Gun Commissioning Status & Plans David H
What did we learn from TTF1 FEL?
LCLS Commissioning Parameters
LCLS Commissioning Parameters
LCLS Injector Commissioning Dates ( )
CW Energy Recovery Linac for Next Generation of XFELs
Injector: What is needed to improve the beam quality?
CEPC Injector positron source
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Injector Commissioning C
Selected simulations for XFEL photo injector
Design of Compression and Acceleration Systems Technical Challenges
LCLS Commissioning P. Emma, et al
Modified Beam Parameter Range
Drive laser specifications:
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Simulations for the LCLS Photo-Injector C
Operational Experience with LCLS RF systems
Linearization of Bunch Compression (2nd order )
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
J. Seeman Perugia Super-B Meeting June 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Minimized emittance for high charge with multi cell superconducting guns and solenoidal focusing D. Lipka, BESSY.
Presentation transcript:

LCLS Commissioning Parameters for Phase-5 (NEH) Parameter Value Comments RF rate 30 Hz 30 Hz in linac - 120 Hz in gun hot test Beam rate ≤30 Hz 30 Hz e- beam as baseline – 10 Hz or lower when needed – 120 Hz testing when possible Drive-laser rate 30 Hz during e- commissioning - shutters provide lower e- rate Bunch charge 0.2-1 nC 0.2 nC nominal – up to 1 nC or well below 0.2 nC as desired for optimizing brightness Drive-laser pulse length 6 ps fwhm 6-ps fwhm at 0.2 nC, but variable with charge when needed Gun gradient 120 MV/m Baseline level, as used in ’07 and ’08 already July 29, 2009