TC Admin Open Mic Session Copyright © OASIS 2012 TC Administration Update Report to Members February 8 th / 9 th 2012.

Slides:



Advertisements
Similar presentations
Understanding Governance
Advertisements

Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 LMSC Policy and Procedures Update Date: March 14 th, 2005 Author:
Nov. 14, 2005 C /81Chair, IEEE Opening November 2005 Plenary Session #17 Jerry Upton- Chair Gang Wu – Procedural.
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
PbD-SE Technical Committee First Meeting December 05, 2012.
OASIS OSLC CCM TC Inaugural Meeting 04 February /04/14OASIS Presentation to OSLC CCM TC.
Geneva, Oct 9, 2012 ATIS Intellectual Property Rights Activities 2012 – An Update Thomas Goode General Counsel, ATIS Document No: GSC16bis-IPR-08 Source:
Transition from Q1- 8th to Q1- 9th edition
EvalS Application User Guide version September 17, 2011.
IEEE P1622 Meeting, Oct 2011 IEEE P1622 Meeting October 24-25, 2011 Overview of IEEE P1622 Draft Standard for Electronic Distribution of Blank Ballots.
IDESG Online Plenary Meeting Wednesday, September 18 2:00 – 4:00pm ET Led by Plenary Chair Bob Blakley Welcome to the Online Plenary.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
Planning DITA 1.3 Kristen James Eberlein Eberlein Consulting.
Secretarial Duties. The secretary records the minutes of the meetings, maintains a register of members and directors, is responsible for sending out the.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: IEEE Down Selection Process Date Submitted: January 18, 2005.
OASIS document rules Nigel Shaw Eurostep Limited.
ISO 9001:2015 Revision overview December 2013
OData Technical Committee Kick-off July 26, 2012.
Copyright OASIS, 2002 OASIS Topic Maps Technical Committees Standards Update Presentation Knowledge Technologies Conference Seattle , March 11 Bernard.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
IDESG Security Committee Charter Update. Objectives The Security Committee is responsible for defining a Security Model for the Identity Ecosystem Framework.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Bootcamp – Network Interoperability] Date Submitted: [February.
TOSCA Technical Committee Kick-off December 12, 2011.
Submission February 2014 Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AR 20 March 2014 Authors: NameCompanyPhone .
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
©SHRM 2011 Revising Bylaws Dorothy Knapp, SPHR ▪ Volunteer Leaders’ Webcast Series ▪ April 28, 2011.
Doc.: IEEE /0036r0 Submission Sept 2005 Tom Siep, Cambridge Silicon Radio PlcSlide 1 Matthew Sherman’s Comments to P&P Notice: This document.
CMIS4DAM TC Inaugural Meeting 03 December /03/14OASIS Presentation to CMIS4DAM TC.
Making every vote count. United States Election Assistance Commission EAC Voting System Certification TGDC Meeting December 9-10, 2009.
ARIP Technical Committee Convener Call 07 April
CTI Technical Committee Convener Call 11 May
ARIP Technical Committee Convener Call 07 April
PROMCODE Technical Committee Convener Call 14 February
Revised TOSCA TC Timeline Analysis and Candidate September 20, 2012.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
OData Technical Committee Convener Call June 5, 2012.
Doc.: IEEE /1623r0 Submission November 2006 Jim Petranovich, Conexant Systems, Inc.Slide 1 PHY Ad Hoc Nov 1 Agenda and Minutes Notice: This document.
Agenda & OASIS Procedures
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
Page  ASME 2013 Standards and Certification Training Module B – Process B7. The Appeals Process.
Doc.: IEEE /0804r0 Submission May 2007 Al Petrick, WiDeFiSlide 1 TGmb – Closing Report Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0295r0 Submission March 15, 2011 Fei Tong, CSRSlide 1 Reference waveform generator for 11ac Notice: This document has been prepared.
PACR Technical Committee Convener Call 09 January /9/131.
COCE Institutional Review Board Academic Spotlight
OASIS OSLC CCM TC Inaugural Meeting 04 February 2014
OASIS TC Process Overview
OCPP TC Inaugural Meeting 07 September 2016
OASIS eTMF TC Inaugural Meeting 16 December 2013
OASIS Overview TC Process
OASIS Overview TC Process
CSAF TC Inaugural Meeting 16 November 2016
SARIF TC Timeline Proposed, approximate.
OASIS OSLC Core TC Inaugural Meeting 12 November 2013
OASIS Overview TC Process & Administration
OSLC Domains TC Inaugural Meeting 30 September 2016
ARIP TC Inaugural Meeting 22 May 2015
OASIS Overview TC Process
CTI TC Inaugural Meeting 18 June 2015
Legal Citation Markup TC Inaugural Meeting 12 February 2014
OSLC PROMCODE TC Inaugural Meeting 26 March 2014
IBOPS TC Inaugural Meeting 23 September 2014
Sponsor Ballot Comment Resolution
OSLC Automation TC Inaugural Meeting 25 March 2014
COEL TC Inaugural Meeting 15 July 2015
BIOSERV TC Inaugural Meeting 08 July 2015
OASIS VIRTIO TC Inaugural Meeting 30 July 2013
Matthew Sherman’s Comments to P&P
Presentation transcript:

TC Admin Open Mic Session Copyright © OASIS 2012 TC Administration Update Report to Members February 8 th / 9 th 2012

Agenda Recap of 2011 goals and results Planned enhancements & improvements for 2012 Review of 2011 updates to TC Process Open mic for questions & comments Copyright © OASIS 2012

Recap of 2011 OASIS Technical Committees were busy in 2011: 5 new Technical Committees started Business Document Exchange, Field Force Management (FFM), Electronic Identity Credential Trust Elevation Methods (Trust Elevation), Advanced Message Queuing Protocol (AMQP) & Topology and Orchestration Specification for Cloud Applications (TOSCA) 20 Committee Specifications approved & published 2 Committee Specifications submitted for consideration for OASIS Standards and 1 approved 79 public reviews held Copyright © OASIS 2012

Recap of 2011 TC Admin was also busy: 369 support requests completed including: 135 document creation requests 79 public reviews 38 special majority ballots Compares with 210 total requests in 2010 Copyright © OASIS 2012

Recap of 2011 Copyright © OASIS 2012 Open ticket queue backlog successfully addressed

Recap of 2011 Copyright © OASIS 2012 Turnaround on requests improved steadily

Enhancements for 2012 A 2011 goal was to identify where we could improve the support & service provided by TC Admin Recent TC Satisfaction Survey also reinforced areas for improvement: Faster turnaround of support requests Better documentation & communications channels More instruction & service Copyright © OASIS 2012

Enhancements for 2012 Several projects planned to address the issues: TC Admin web page; one-stop shop for how-to information and TC support Complete & update documentation Create TC Submission Checklist to help TCs avoid common problems Update TC Admin forms to align them to current process, make them clearer & easier to use Begin automating processing where possible Initiate TC Outreach program to talk with every TC Copyright © OASIS 2012

Enhancements for 2012 Timing: TC Admin home page, Submission Checklist by end of first quarter Building out documentation, TC Outreach program begin in first quarter, continue throughout year Updating TC Admin forms by end of second quarter Automation, other improvements over second half of 2012 Copyright © OASIS 2012

TC Process Updates in 2011 The OASIS Board approved several changes to TC Process Updated definition of Statement of Use Clarified requirements for electronic ballots Added section on maintenance of OASIS Standards Extended applicability of Designated Cross Reference Change requests These changes became effective Oct 1 st Copyright © OASIS 2012

TC Process Updates for 2011 Definition of Statement of UseStatement of Use "Statement of Use", with respect to a Committee Specification, is a written statement by an OASIS Organizational Member stating that it is successfully using or implementing that specification in accordance with the conformance clauses specified in Section 2.18, identifying those clauses that apply, and stating whether its use included the interoperation of multiple independent implementations. A Statement of Use must be endorsed by the Organizational Member's Primary Representative. Importance for TCs: Ensure that Statements of Use identify specific clauses from the specs Conformance clauses and are submitted by or confirmed by the Primary member Copyright © OASIS 2012

TC Process Updates for 2011 Clarification for electronic ballotselectronic ballots 3 rd paragraph now reads: "Electronic Voting: TCs may conduct electronic ballots, either by using the TC's general mail list or the publicly archived electronic voting functionality provided by OASIS. The minimum period allowed for electronic voting shall be seven days; the TC may specify a longer voting period for a particular electronic ballot. Any Work Product Ballot conducted as an electronic ballot must permit each voter to choose "yes", "no" or "abstain. Eligible voters may change their vote up until the end of the voting period. Importance for TCs: Dont set up a ballot that prevents votes from being changed; TC Admin may declare it invalid Also, remember that even electronic votes held by stay open for 7 days Copyright © OASIS 2012

TC Process Updates for 2011 New Sect for maintenance activitiesmaintenance activities New section reads: (1) Only one TC at a time may perform a Maintenance Activity on an OASIS Standards Final Deliverable. (2) Maintenance Activity on an OASIS Standards Final Deliverable is always within the scope of the TC that created the deliverable, whether or not the TC's Charter explicitly references it. (3) Maintenance Activity on an OASIS Standards Final Deliverable may be done by a TC other than the TC that originated the deliverable, if: (a) the name of the OASIS Standards Final Deliverable to be maintained is listed as a deliverable in its Charter, and (b) if the originating TC is not closed, it has consented to the Maintenance Activity by a Special Majority Vote. Importance for TCs: Minimal for active TCs. TCs considering closing may want to consider chartering TCs for maintenance Copyright © OASIS 2012

TC Process Updates for 2011 Changes to Sect Designated Cross Reference ChangesDesignated Cross Reference Changes See the section for complete language Importance for TCs: Section was created to enable cross-references within a specification to be updated without triggering another round of public reviews. Can now be used for any OASIS Specification or Note stage (i.e. Committee Specifications, Committee Notes) Copyright © OASIS 2012

TC Process Updates for 2011 Designated Cross Reference Changes (cont.) What is covered: References to other OASIS Work Products in the Normative or Non-Normative Reference sections of a narrative specification What is not covered: References in other parts of the body of the spec References in schemas, wsdls or other non-narrative components of a specification References to non-OASIS documents Copyright © OASIS 2012

TC Process Updates for 2011 Designated Cross Reference Changes (cont.) How to request DCR change: Must be made as part of a motion or ballot to approve the Work Product The motion must list each cross reference including: the current name, version and revision number; the current URI; The approval status and date to be cross-referenced The TC must notify TC Admin when the approval happens TC Admin will hold the Work Product until all DCR approvals are completed and then publish & announce Copyright © OASIS 2012

TC Process Updates for 2011 Designated Cross Reference Changes (cont.) Sample motion: Do members of the TC approve Pseudo-spec V1.0 public review draft 04 (contained in with the designated cross reference changes below as a Committee Specification? Current reference to be updated: [some-Spec] OASIS Some Spec v February Committee Specification Draft 02 / Public Review Draft csd02.html Expected approval status: Committee Specification, March 2012 Designated Cross-Reference Changes requested in accordance with the requirements of Section 2.19 of the TC Process. TC acknowledges that publication may be delayed pending completion of these cross-references. Copyright © OASIS 2012

Questions & Comments Copyright © OASIS 2012