LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Week 13: R. Assmann, J. Wenninger
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Summary week 36 Coordination by B. Holzer & J. Wenninger
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Summary week 30 Week 30 R. Bailey & J. Wenninger
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Wed :40 Lost S78 - QPS controller.
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Tuesday 9th November 10:02 Fill beams dumped
Yesterday morning Held 1647 for a while – SPS kicker problem
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Global aperture measurements at 450 GeV with 170 mrad crossing angle
Collimation margins and *
Friday 23rd March 08:00 Access
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Injection Studies: 50 ns ABT/BTP.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Wednesday morning / afternoon
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Plan for 1 m b* J. Uythoven & J. Wenninger With input from rMPP, W. Herr, R. Bruce, M. Giovannozzi, S. Redaelli

Startup with beam This evening between 19-20 if all goes well. In the SPS a quadrupole was exchanged (H foc.). There is a slight orbit perturbation (too small for the surveyors to correct, < 0.1 mm) that we will have to steer back some time over the WE. 5/22/2019 LMC - beta* 1 m

Peak s @ triplet = 1.42 mm (3.5 mm emit) Aperture @ 1 m Simple scaling – just to check if it even makes sense… Just about right for 18s, s = nom. Emittance. Aperture @ 1.5 m (sigma) 18 20 Beam size ratio 1.5/1 m 0.80 Raw scaling to 1 m by beam size (sigma) 14.4 16 Xing angle change (mm) for 120 urad* 0.25 Aperture @ 1 m, 120 urad (sigma) 14.2 15.8 Peak s @ triplet = 1.42 mm (3.5 mm emit) * @ the BPMs 5/22/2019 LMC - beta* 1 m

Beam-beam separation Beam-beam separation down below 6s for 100 mrad With 120 mrad ~ equivalent to nominal (b* 0.55 m) Triplet Triplet W. Herr 5/22/2019 LMC - beta* 1 m

The commissioning blocks Configuration: b* 1m, 120 mrad Xing angles. IR6+7 collimators at standard settings, TCTs 11.8s (IR1+5+8) Block A: aperture at 1m and 120 mrad This block may change depending on the results ! Block B: ALICE polarity reversal Block C: Validation Block D: Intensity ramp up 5/22/2019 LMC - beta* 1 m

Block A : aperture check Fill 1: 1 probe/beam, checkout cycle. b* 1 m and Xing angle 120 mrad. Standard collimator settings IR6+7. TCTs IR1/5 to be adapted to 120 mrad (setup on 100 mrad). Fill 2: 2 nominals/beam, TCT alignment, orbit. TCTs IR1/5 alignment on 120 mrad, separated and in collision. Collision (re-)optimization with 120 mrad, reference orbit. End with loss map (H+V) and asynch dump. TCTs are 11.8s. Fill 3: 1 probe/beam, aperture check @ 1 m. Repeat aperture measurement at 1 m. End with a loss map H, TCTs at 14s. Fill 4: 1 probe/beam, aperture check with loss map. Loss map with TCTs at Xs, X = 13…14. 4h 6h 8h 5h 5/22/2019 LMC - beta* 1 m

Block A: long range BB check Fill 5: 84b with highly asymmetric BB filling pattern (also used for 1 m with 100 mrad). Bring the beam up to collisions. Verify stability and beam-beam effects. 6h 5/22/2019 LMC - beta* 1 m

Block B : ALICE polarity Step 1: adjust injection, reference. ALICE on ‘old’ polarity. Injection steering with 12b, then copy to probe and check it. Step 2: revert ALICE polarity. Check/correct orbit. Check/steer injection oscillations with probe, repeat with nominal. Step 2’: re-steer TI2 if necessary. TDI coarse TL setup, TCDI alignment and verification. Step 3: TDI/TCLI alignment. TDI/TCLI alignment with 1 nominal b. Check TDI,TCLI setup. Check injection 12b. 2h 4h 12h If required, ‘alternate’ with TCT alignment (steps 4-6) 8h 5/22/2019 LMC - beta* 1 m

Block B : ALICE polarity continued Step 4: TCTs IR2 at injection. Setup TCTs in IR2 at injection. Step 5: Checkout cycle, 2 probes/beam. Check Xing angle IR2 along the cycle. Correct orbit if necessary. TCTs IR2 ‘open’. Step 6: TCT IR2 alignment cycle, 2 nominal b/beam. TCT alignment on flat top and in collision. Collision orbit, reference. Loss map H+V and asynch. dump. (Step 7: TCT IR2 functions, positions and interlocks ) 2h 4h 6h 5/22/2019 LMC - beta* 1 m

Block C Validations (loss maps, asynch dump checks) – to be confirmed with collimation team (Dp/p) Condition Betatron H Betatron V Dp/p + Dp/p - Dump Injection X Flat top Squeezed Collisions 5/22/2019 LMC - beta* 1 m

Block D: Intensity ramp up Proposed ramp up for stable beams: 48b – short fill 264 – short fill 480 – short fill 912 – long fill 1380 – finally !! 5/22/2019 LMC - beta* 1 m