Bianca Cooper & David James May 17, 2017 Water Quality Division

Slides:



Advertisements
Similar presentations
LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
Advertisements

The Pretreatment Program September 14, 2012 Bethlehem, PA.
Industrial Wastewater ENVH 440/545 Fall Outline Regulations governing industrial wastewater discharges King County industrial wastewater limits.
Jerald O. Thaler, P.E. Fishbeck, Thompson, Carr & Huber, Inc. Elaine J. Venema, PE. Fleis & VandenBrink Engineering, Inc.
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Wastewater Collection Systems Teague Harris Pate Engineers, Inc. John Montgomery Municipal.
PRETREATMENT PERFORMANCE MEASURES (Draft) 24 th EPA REGION 6 ANNUAL PRETREATMENT WORKSHOP OKLAHOMA CITY 8/14/08 Allen Gilliam ADEQ State Pretreatment Coordinator.
25th Annual U.S. EPA Region VI Pretreatment Association Workshop Liquid Waste Transporter Enforcement Stories August 5, 2009 Ms. Erin La Rue Pretreatment.
The Clean Water Act Objective: To restore and maintain the chemical, physical, and biological integrity of the nation’s waters PHOTO OF 2007 OUTFALL AT.
Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Spring Training 2008 IPP INSPECTION. PURPOSE OF INSPECTION The main purpose of an industrial waste pretreatment program is to protect the environment,
Applying for the VT Multi-Sector General Permit
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
CENTRALIZED WASTE TREATMENT 40 CFR 437 Lessons Learned.
TPDES Pretreatment Program & Updates
PERMITTING AND COMPLIANCE Wastewater Utility Council May 17, 2006.
Calculating Numerical Local Limits Texas Commission on Environmental Quality Texas Pollutant Discharge Elimination System Pretreatment Program.
Industrial User Permits: Monitoring Requirements.
Source Control Planning for Municipal Wastewater System Permit Compliance Environmental Trade Fair & Conference Austin, TX. May 6, 2015 David James Santiago.
Pretreatment 101 Training Course Sponsored by U.S. Environmental Protection Agency, States of Region 6 And the Region VI Pretreatment Association.
Michael Darcy Owner M.A.R.S. Bio-Med Processes Inc.
Overview of Pretreatment Program Regulations 40 CFR Part 403 Pretreatment 101 Short Course 8/3/09 Addison, Texas David Hardgrave ODEQ State Pretreatment.
ISAT 422: Environmental Management Water Regulations n "Clean Water Act (CWA)" = Water Pollution Control Act of 1972 n Amended by Clean Water Act of 1977.
1 Industrial Waste Data Tracking: Surveys & Other Information Collection Presented by: Melissa Reboul LDEQ Pretreatment MODULE 3.
Streamlining Rules for Pretreatment Regulation Requested changes to Chapters 922 & 923 of the City of Zanesville Codified Ordinances Presentation to City.
PUBLIC HEARING September 15, Draft NPDES Permits for ArcelorMittal Facilities Indiana Harbor West, Central Wastewater Treatment Plant, Indiana.
NPDES Permitting for Coal Ash Ponds in North Carolina EMC Meeting January 12, 2012 Sergei Chernikov, Ph.D. 1.
TPDES Pretreatment Program & Updates Texas Commission on Environmental Quality Environmental Trade Fair Environmental Trade Fair May 4, 2016 Zandra Castaneda.
1 There are two types of potential discharges that require permits at our marina facilities: 1) Stormwater and 2) Wastewater. Your facility needs to be.
Source Control Planning for Municipal Wastewater System Permit Compliance Water Quality Seminar Austin, TX. September 23, 2015 David James Santiago Velez-Garcia.
1 Industrial Waste Survey (IWS) Pretreatment Consortium Meeting April 14, 2005 Deborah Gore PERCS Unit.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
TPDES Pretreatment Program & Updates Texas Commission on Environmental Quality Water Quality/Stormwater Seminar Water Quality/Stormwater Seminar September.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Pollution Prevention & Management DentalBMPs. Overview Amalgam in POTW New EPA Guidelines City of Tulsa Dental BMPs.
Environmental Management Division
Integrated Watershed Management
Effluents Standards In Pakistan Environmental protection agency (EPA) is responsible for all aspects of the environment; regulation of sanitation and.
FUTURE REQUIREMENTS AND GOALS
Sewer Code Update (Title 13)
TPDES Pretreatment Program & Update Texas Commission on Environmental Quality Trade Fair and Conference May 17, 2017 Bridget Malone & Rebecca L. Villalba.
2017 Environmental Trade Fair Shannon Gibson
The Nuts & Bolts of TBLL Development
NC DPPEA Compliance Assistance - Water
Compliance Monitoring Activities State Inspections
Total Maximum Daily Load Program
Jesse Boultinghouse Waste Permits Division TCEQ Trade Fair May 3, 2016
DEEP Changes to Pretreatment Programs
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
Single Event Violations
Van Wert, OH Water and Wastewater Element Training
John Tinger U.S. EPA Region IX
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Overview of the Final Pretreatment Streamlining Rule
Collection System Protection Through an Effective Pretreatment Program
Wastewater Permitting Updates
Water Quality Planning Division Monitoring & Assessment Section
2018 Environmental Trade Fair
2018 Environmental Trade Fair Shannon Gibson
Alexander Hinz & Kasy Stinson Water Supply Division
TCEQ Environmental Trade Fair Water Quality Division
Jessica Alcoser & David James May 15, 2017 Water Quality Division
Indiana Department of Environmental Management Office of Water Quality
Module 1b – ICIS Permitted Features
Jessica Alcoser May 14, 2019 Water Quality Division
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Wastewater Permitting Updates
Presentation transcript:

Pretreatment Review of TPDES Permit Applications & How to Identify Industrial Users Bianca Cooper & David James May 17, 2017 Water Quality Division Texas Commission on Environmental Quality

Introduction All publicly owned treatment works (POTWs) that discharge to a waterbody of Texas, must apply for a Texas Pollutant Discharge Elimination System (TPDES) permit. The application to discharge wastewater goes through a series of administrative and technical reviews before a permit is written and issued.

TPDES Permitting Process Application Received by TCEQ Administrative Review Technical Review Standards and Assessment Review Draft Permit Sent for Comments Pretreatment Review Simple permitting process diagram

Pretreatment Review – Domestic Worksheet 6.0 All POTWs must complete Worksheet 6.0 as part of their TPDES permit application Include SIUs, CIUs, and other IUs discharging to the WWTP Based on total number, average process flow, and other information Worksheet 6.0 – Industrial Waste Contribution. This worksheet requests information on the numbers and types of industrial users that contribute wastestreams to the POTW as well as any instances of interference or pass through that the WWTP has experienced in the past three years. When the TCEQ pretreatment staff review Worksheet 6.0 of the permit application and find that the POTW is not receiving discharges from SIUs or CIUs, or other information to be considered, the staff will develop language for the contributing industries and pretreatment requirements section of the TPDES permit that we call Option 1.

Pretreatment Review – Worksheet 6.0 Section 1.A: Use results from water billing records or surveys CIUs, SIUs, or Other IUs: Enter “0” or “None” if none are discharging. Do not enter “N/A” Any issues in the sanitary sewer system or WWTP? Include dates, duration, description of issue, sources Copy of the actual Domestic worksheet 6.0 – Industrial Waste Contribution Application Form, page 1. Domestic Technical Report was updated Sept. 1, 2016 and can be found on TCEQ website

Pretreatment Review – Worksheet 6.0 Section 3: Include required information for all SIUs and CIUs B. Process Information: Provide as much detail as possible Copy of the actual Domestic worksheet 6.0 – Industrial Waste Contribution Application Form. Note that other IU’s are not included in No. 3.

Pretreatment Review – Worksheet 6.0 Section 3, Items C-E: Describe the product, provide flows, and applicable rules Section 3: Industrial Interruptions Describe any problems caused by IUs, i.e. interference or pass through Copy of the actual Domestic worksheet 6.0 – Industrial Waste Contribution Application Form, page.

TPDES Permit - Pretreatment Options 1 and 2

POTWs not required to have an approved pretreatment program TPDES Pretreatment Permit Language “CONTRIBUTING INDUSTRIES AND PRETREATMENT REQUIREMENTS” Option 1 POTWs not required to have an approved pretreatment program Option 2 POTWs are required to conduct an industrial waste survey (IWS) and may be required to develop a pretreatment program

TPDES Pretreatment Permit Conditions Option 1 No approved pretreatment program No development of a pretreatment program No formal Industrial User survey Permit Language Requirements General and Specific Prohibitions 40 CFR §403.5 POTW notification requirements New introduction of pollutants Substantial changes in volume or character of pollutants Require any indirect discharger to: Comply with the reporting requirements of Sections 204(b), 307, and 308 of the Clean Water Act The Contributing Industries and Pretreatment Requirements section of the TPDES permit will have pretreatment language based on the information in Worksheet 6.0. Option 1 has the general and specific prohibitions. The majority of POTW’s are in this category. As discussed earlier, the general and specific prohibitions are included in the Opt. 1 language. In addition, the POTW must notify the TCEQ when there is a substantial change in the Industrial contribution to the POTW or anything that may impact the WWTP.

TPDES Pretreatment Permit Language Option 2 Activity No. 1 Submit an industrial user survey Due within 60 days of issued permit Based on results, TCEQ will determine if program development is required or not POTWs that are (or may) be required to develop a pretreatment program When Option 2 is assigned to a TPDES permit, it will include a table to complete for the IU survey.

Industrial Users Identification and Survey

Problems and Discharges to Consider Collection System: Stoppages or overflows? Corrosion of lines? Wastewater Treatment Plant: Exceeding permit discharge limits? Biomonitoring or WET failures? Exceeding sludge criteria for its disposal method? Unusual or noxious odors? Industrial Users (IUs) Excessive amounts of pollutants or hydraulic loads? Excessive fats, oils, or grease (FOG)? Wastewater with high or low pH? POTWs need to identify and to evaluate potential problems at the WWTP. These problems include collection system stoppages and overflows, effluent violations, and sludge contamination. Once you identify the problem (e.g., high pollutant loadings, high flows, oil & grease, or pH extremes), the next step is to identify possible industrial sources. The picture denotes a sewer overflow from a manhole.

How to Identify Industrial Users Water billing records Applications for sewer service Building permits Property tax records POTW collection system personnel POTW treatment plant operators As mentioned earlier, to identify IU’s, one may begin by looking at water billing records, applications for sewer service, building permits, property tax records, POTW staff, as well as consulting with the City personnel. Wastewater collection system and wastewater treatment plant personnel frequently know of problem dischargers.

How to Identify Industrial Users (cont.) Business and telephone directories Texas Manufacturer’s Directory Chamber of Commerce records Economic Development organizations Direct observation (drive-by) Internet searches Toxic Release Inventory (TRI) www.epa.gov/TRI/ EPA Envirofacts www.epa.gov/enviro/ Hazardous Waste Generators Examples of other resources you can use to identify industrial users include business directories such as the Texas Manufacturer’s Directory, telephone, chamber of commerce records, Economic Development organizations, drive-bys and the internet, such as the TRI and Envirofacts that can help identify industries that may discharge toxic or hazardous substances. Trade Associations (e.g. metal finishers, etc.) Ask your currently permitted industries of any known competitors in the area, etc. Contributions to the POTW may be from connections outside the service area or City limits. Once you have exhausted these resources, you will have made a master list of industrial users located in the POTW’s service area

Facility Types – Commonly Missed Small metal plating facilities Metal Finishing (40 CFR Part 433) Truck washing facilities Transportation & Equipment Cleaning (40 CFR Part 442) Grease & Grit Processing facilities Centralized Waste Treatment (40 CFR Part 437) Facilities with no categorical pretreatment standards Hospitals (40 CFR Part 460) Meat and Poultry Products (40 CFR Part 432) Plastic Molding and Forming (40 CFR Part 463) And several others Some of the common types of facilities that are overlooked are listed here. For example small metal plating facilities, or facilities that do not have categorical standards and facilities that might impact the collection system as well as the WWTP. For example, meat and poultry facilities do not have categorical standards. However, due to their high strength waste they may impact the POTW. Some truck washing facilities may be subject to the TEC depending on what they hauled and the volume of wash water used. Grease and grit trap processing facilities may be subject to CWT categorical pretreatment standards due to grit processing. Hospitals have cafeterias and may possibly discharge metals or certain hazardous wastes. Possibly industrial laundry facilities could give you problems due to the volume, temperature, metals, oily wastes, or high-strength waste.

Industrial User or Waste Survey Compile master list of potential IUs in service area – consider… IUs with high water usage IUs that might impact the POTW Standard Industrial Classification (SIC) code North America Industrial Classification System (NAICS) code Compare to categories: 40 CFR Parts 405-471 The industrial user survey includes commercial users that are sources of any pollutants of concern, such as photo processers, dentists, and restaurants. In order to determine if these facilities use and discharge process wastewater and obtain additional information about them, you will want to send out a questionnaire or survey form requesting this information. The TCEQ is happy to share the form with you that developing pretreatment programs must use.

Industrial User Survey (cont.) Survey each IU to collect information Conduct follow-up inspections Conduct follow-up telephone calls Summarize data Maintain and update IU list

TPDES Permit - Pretreatment Options 3 and 4

TPDES Pretreatment Permit Language “CONTRIBUTING INDUSTRIES AND PRETREATMENT REQUIREMENTS” Option 3 POTWs within an approved pretreatment program Has SIUs discharging to the specific WWTP Option 4 No SIUs discharging to the specific WWTP

TPDES Pretreatment Permit Language Option 3 WWTPs: Have an approved TPDES pretreatment program 40 CFR Part 403 requirements Reassessment certification of existing TBLLS Notification to redevelop existing TBLLs Either due 60 days after permit issuance Technically based local limits (TBLLs) This slide outlines TPDES Pretreatment Option 3 and requirements. Written certification of TBLLs reassessment is Form No. 20221

TPDES Pretreatment Permit Language Option 3 WWTPs: Due on specified month WWTP influent/effluent monitoring List of SIUs in significant noncompliance (SNC) and newspaper publication Annual Report New introduction of pollutants Substantial changes in volume or character of pollutants Notification Requirements

TPDES Pretreatment Permit Language Option 4 WWTPs: Covered under approved TPDES pretreatment program No SIUs in the service area of the plant Notification requirements still apply Influent/effluent sampling not required TBLLS may applicable through the pretreatment ordinance, based on allocation method used. Since the permit does not have influent/effluent sampling, the notification requirements are really important because industries may begin discharging during the permit term, and the notification usually comes through the annual report, for example.

Stormwater & Pretreatment Team (512) 239-4671